The largest section, about a third of the exam: installing tile and stone, joint treatment, repairs and restoration, and showers and steam rooms. The study guide gives it four chapters.

Setting

Key mortar into the substrate, comb straight in one direction, move each tile across the ridges, and lift a tile to check coverage.

Coverage
80% dry interior; 95% wet or exterior; 95% for natural stone everywhere.
ANSI A108.5 via CTEF
Offsets
No more than 33% on tile longer than 15 inches unless the manufacturer says otherwise.
ANSI A108.02 via CTEF

Grout and movement joints

Grout joints are at least three times the tile's size variation and never under 1/16 inch. Movement joints go at perimeters, changes of plane and over structural joints, filled with silicone, urethane or polysulfide sealant.

EJ171
Movement joints are required; the designer shows their locations.
TCNA Handbook via CTEF

Showers and steam rooms

Code minimums include a 1,024 in² compartment that holds a 30-inch circle, a 22-inch door and a 2-inch drain. Pan liners sit on a pre-slope and are flood-tested; every horizontal surface slopes to the drain.

Steam ceilings
Sloped 2 inches per foot.
TCNA SR613/SR614 via CTEF

Repairs

Diagnose before repairing: hollow tile, linear cracks, tenting, dark grout and efflorescence each point to a cause that must be fixed first.

Keep going: the full CSLB C-54 Ceramic and Mosaic Tile guide covers every section of the exam. CSLB C-54 Tile Trade Exam Study Guide (2026) — PDF + EPUB, $24.99 · 14-day refund →

Studying in order?

Practice stays free. The full CSLB C-54 Ceramic and Mosaic Tile study guide is the material itself, taught start to finish — a downloadable PDF + EPUB you keep.

Get the book — $24.99
Report