Lean Six Sigma Black Belt Practice Exam — All Questions

4 questions

Control & SPC

On a control chart, a single point beyond the upper control limit indicates:

  • a.Common-cause variation
  • b.A special (assignable) cause to investigate
  • c.That the spec limits are wrong
  • d.That DPMO is zero

A point beyond the control limits signals special-cause variation to investigate.

Control & SPC

Control limits on a control chart are:

  • a.Calculated from the process data (typically ±3 sigma)
  • b.The same as the customer specification limits
  • c.Set by the customer
  • d.Always ±1 sigma

Control limits are derived from process variation (commonly ±3 sigma), distinct from spec limits.

Control & SPC

The main purpose of a control plan in the Control phase is to:

  • a.Define the project charter
  • b.Run a DOE
  • c.Document how to monitor and sustain the improved process
  • d.Compute Cp

A control plan documents monitoring and response to sustain the gains.

Control & SPC

Statistical Process Control (SPC) primarily helps distinguish:

  • a.Suppliers from customers
  • b.Costs from benefits
  • c.Inputs from outputs
  • d.Common-cause from special-cause variation

SPC separates normal common-cause variation from special-cause variation.