Lean Six Sigma Black Belt Practice Exam — All Questions

4 questions

Improve & DOE

Design of Experiments (DOE) is used to:

  • a.Monitor a stable process
  • b.Systematically study the effect of multiple factors and their interactions
  • c.Write the project charter
  • d.Compute the p-value only

DOE varies factors deliberately to identify significant effects and interactions.

Improve & DOE

A key advantage of a factorial DOE over changing one factor at a time is that it can:

  • a.Detect interactions between factors
  • b.Avoid all measurement
  • c.Eliminate the need for data
  • d.Guarantee zero defects

Factorial designs reveal interactions that one-factor-at-a-time testing misses.

Improve & DOE

A pilot of an improvement is run before full rollout mainly to:

  • a.Replace the control plan
  • b.Skip the Control phase
  • c.Validate the solution and reduce risk before scaling
  • d.Set the USL and LSL

Piloting validates the improvement and reduces risk before full implementation.

Improve & DOE

Poka-yoke (mistake-proofing) aims to:

  • a.Increase inspection staff
  • b.Widen the specification limits
  • c.Add more defects for testing
  • d.Prevent errors from occurring or being passed on

Poka-yoke prevents defects at the source or stops them from moving downstream.

Report