The service is where utility power becomes your responsibility, and it is the one place in a building where the neutral and the grounding system are deliberately tied together. This area tests two articles almost entirely: Article 230 for the service conductors and disconnects, and Article 250 for grounding and bonding at the service and at transformers. Nearly every question is a number you can look up, so the skill is knowing which section or table holds it.

Overhead service clearances

Clearance rules exist to keep people, ladders and vehicles away from conductors that have no overcurrent protection on the customer side. The exam asks them as straight look-ups, and each wrong choice is a correct number for a different location. Over ground, the height depends on what passes underneath. Above finished grade, sidewalks and platforms that only pedestrians reach, the figure is 10 feet. Over a residential driveway, or a commercial area not subject to truck traffic, it is 12 feet. Over public streets, alleys, roads and other areas with truck traffic it is 18 feet. Each of these heights is printed with a voltage limit in 230.24(B), so read the voltage in the question before you pick a row. Over a roof that is not readily accessible, the clearance is 8 feet 6 inches, held for 3 feet in every direction from the roof edge. Next to a building, service conductors stay 3 feet from windows that open, doors, porches, balconies, stairs and similar spots. Conductors run above the top of a window are treated as out of reach. Finally, the point of attachment on the building must be at least 10 feet above finished grade and placed so the other clearances are met.

Clearance over driveways and streets
12 ft over residential driveways and 18 ft over public streets and truck-traffic areas.
2026 NEC §230.24(B)
Clearance over roofs
8 ft 6 in. above the roof surface, maintained 3 ft in all directions from the edge.
2026 NEC §230.24(A)
Clearance from openings
3 ft from windows designed to open, doors, porches, balconies and stairs.
2026 NEC §230.9(A)
Point of attachment
Not less than 10 ft above finished grade.
2026 NEC §230.26

Sizing service conductors, with a worked example

Service-entrance conductors must carry the noncontinuous load plus 125 percent of the continuous load. The extra 25 percent goes only on the continuous part, and the wrong answers come from putting it on everything or on nothing. Worked example: service-entrance conductors supply 68 amperes of continuous load and 120 amperes of noncontinuous load. Step 1, raise the continuous load: 68 x 1.25 = 85 amperes. Step 2, add the noncontinuous load at face value: 120 + 85 = 205 amperes. The conductors need an ampacity of at least 205 amperes. Simply adding the two loads gives 188 amperes, which is on the answer list for anyone who skipped step 1. Dwellings get their own allowance. For a single-phase dwelling service, the conductors may be sized at 83 percent of the service rating, and the dwelling table does that math for you: 2/0 copper for a 200-ampere service and 400 kcmil copper for a 400-ampere service. A question that says to use the dwelling table wants those values, not the larger size the general ampacity table would give. On this exam, conductors are copper unless the question says otherwise, and exceptions and optional methods are ignored unless the question calls for them.

Service conductor ampacity
At least the noncontinuous load plus 125 percent of the continuous load.
2026 NEC §230.42(A)(1)
Dwelling service conductors
Single-phase dwelling services may be sized at 83 percent of the service rating; 2/0 copper serves 200 amperes.
2026 NEC §310.12
400-ampere dwelling service
The dwelling table lists 400 kcmil copper.
2026 NEC Table 310.12(A)

Service disconnects and ground-fault protection

A service normally has one disconnecting means. The Code permits two to six, but only when each is in its own enclosure, or in its own section or compartment of equipment such as a switchboard, and all of them are grouped. Six is the maximum. The minimum rating depends on what is served: 30 amperes for an installation of not more than two 2-wire branch circuits, 100 amperes for a one-family dwelling, and 60 amperes for installations the specific rules do not cover. The dwelling floor matters in calculation questions. A house with a 21,600 VA demand on 240 volts works out to 90 amperes, but the answer is 100 amperes because the minimum governs. Where several disconnects are used, their combined rating must be at least the rating required for the service. If 400 amperes is required and two disconnects are rated 200 and 100, the third needs at least 100. Ground-fault protection of equipment has two numbers that the exam swaps on purpose. It is required when the service disconnect is rated 1,000 amperes or more on a solidly grounded wye system with more than 150 volts to ground, such as 480Y/277. The highest permitted setting of that protection is 1200 amperes. One number is the size at which the protection is required and the other is the cap on its setting.

Two to six disconnects
Each in a separate enclosure, section or compartment, and all grouped.
2026 NEC §230.71(B)
One-family dwelling minimum
The service disconnecting means is rated at least 100 amperes.
2026 NEC §230.79(C)
Combined rating
The ratings of multiple service disconnects together must meet the required service rating.
2026 NEC §230.80
When GFPE is required
Service disconnects of 1,000 amperes or more on solidly grounded wye systems over 150 volts to ground.
2026 NEC §230.95(A)
GFPE maximum setting
The ground-fault protection setting may not exceed 1200 amperes.
2026 NEC §230.95(C)

Building the grounding electrode system

Every electrode that is present at a building must be bonded together into one grounding electrode system. What the exam tests is the minimum that makes each one count. A metal underground water pipe needs 10 feet or more in direct contact with the earth, and it may not be the only electrode: it must be supplemented by another type. A concrete-encased electrode needs at least 20 feet of bare copper not smaller than 4 AWG, or 20 feet of reinforcing bar at least 1/2 inch in diameter. Rebar pieces tied together with steel tie wires can add up to the 20 feet, so pieces of 8, 6 and 5 feet are 1 foot short. A ground ring is at least 20 feet of bare copper not smaller than 2 AWG, buried at least 30 inches deep. Rods are at least 8 feet long. A plate exposes at least 2 square feet to the soil. Metal underground gas piping is never an electrode, even though it is bonded under a different rule. A single rod must be supplemented by a second electrode unless its resistance to earth is 25 ohms or less. Two rods go at least 6 feet apart so that each works in its own soil. Where rock stops a rod from being driven vertically, it may go in at up to 45 degrees from vertical, or lie in a trench at least 30 inches deep.

All electrodes bonded
Every electrode present forms part of one grounding electrode system.
2026 NEC §250.50
Concrete-encased electrode
At least 20 ft of bare 4 AWG copper or 1/2 in. rebar, which may be several pieces tied together.
2026 NEC §250.52(A)(3)
Water pipe must be supplemented
A metal underground water pipe cannot serve as the only electrode.
2026 NEC §250.53(D)(2)
Single rod resistance
A lone rod, pipe or plate needs a second electrode unless it measures 25 ohms or less.
2026 NEC §250.53(A)(2)
Rod spacing
Rods that supplement each other are at least 6 ft apart.
2026 NEC §250.53(A)(3)

The grounding electrode conductor

The grounding electrode conductor is sized from Table 250.66 by the size of the ungrounded service conductors. The rows you need most: 1 or 1/0 AWG copper service conductors take a 6 AWG copper conductor, 2/0 or 3/0 take 4 AWG, over 3/0 through 350 kcmil take 2 AWG, and over 350 through 600 kcmil take 1/0. Reading one row low is the standard mistake, so check the row boundaries. With parallel sets, add the areas in one phase first. Two sets of 250 kcmil are 500 kcmil, which lands in the 1/0 row. Then apply the caps. The conductor that runs only to a rod, pipe or plate never has to be larger than 6 AWG copper, and the one that runs only to a concrete-encased electrode never has to be larger than 4 AWG copper, whatever the table says. Installation rules round it out. The conductor is run in one continuous length unless spliced by a permitted method such as irreversible compression connectors or exothermic welding. An aluminum grounding electrode conductor run outside may not be terminated within 18 inches of the earth. A clamp on a buried rod must be listed for direct burial.

GEC sizing
Selected by the size of the ungrounded service conductors, with parallel sets added together.
2026 NEC Table 250.66
Cap for rod, pipe or plate
Never required to be larger than 6 AWG copper.
2026 NEC §250.66(A)
Cap for concrete-encased electrode
Never required to be larger than 4 AWG copper.
2026 NEC §250.66(B)
Continuous length
No splices except by the permitted methods.
2026 NEC §250.64(C)

Bonding at the service and at a transformer

The main bonding jumper connects the neutral to the equipment grounding system at the service, and it is the path fault current uses to get back to the source. It is sized from Table 250.102(C)(1), the same table used for supply-side bonding jumpers, the grounded service conductor minimum, and the bond to interior metal water piping. For 350 kcmil copper service conductors the jumper is 2 AWG, and for 500 kcmil it is 1/0. Above 1,100 kcmil copper the table stops and a 12.5 percent rule takes over. Two parallel sets of 750 kcmil total 1,500 kcmil, 12.5 percent of that is 187.5 kcmil, and the next standard size up is 4/0. A bonding jumper that is only a screw must have a green finish you can see once it is installed. The water piping bond is not required to be larger than 3/0 copper. That neutral-to-ground connection is made once. On the load side of the service disconnect the neutral is not used to ground enclosures, and a separate equipment grounding conductor is run. A second connection downstream puts neutral current on enclosures and raceways, which the Code calls objectionable current. A transformer that forms a separately derived system gets the same treatment in miniature. One system bonding jumper is installed, at the source or at the first disconnecting means, never both. The grounding electrode conductor connects at that same point.

Bonding jumper table
Main and supply-side bonding jumpers are sized from the ungrounded conductors, with 12.5 percent of the area above 1,100 kcmil copper.
2026 NEC Table 250.102(C)(1)
Bonding screw
A screw-type main bonding jumper has a green finish visible when installed.
2026 NEC §250.28(B)
Neutral on the load side
Not used to ground equipment past the service disconnect.
2026 NEC §250.24(B)
System bonding jumper location
At the source or the first disconnecting means of a separately derived system, at one point only.
2026 NEC §250.30(A)(1)
Derived system GEC connection
Made at the same point as the system bonding jumper.
2026 NEC §250.30(A)(5)

Keep going: the full Texas Journeyman Electrician (TDLR / PSI, 2026 NEC) guide covers every section of the exam. Texas Journeyman Electrician Exam — Open-Book Study Guide (2026 NEC) — PDF + EPUB, $14.99 · 14-day refund →

Want the dense 50-page printable for exam week? Texas Journeyman Electrician (TDLR / PSI, 2026 NEC) cheat sheet PDF — $9.99 →