Texas Journeyman Plumber Exam Practice Test
Sample practice questions
A few real questions from this free bank, with full explanations. Use the practice tool above for the whole set.
- 1. Plumbing License Law and Board Rules
Under Occupations Code §1301.002, how many hours of work at the trade must an applicant have before sitting for the Journeyman Plumber examination?
- a.At least 10,000 hours
- b.At least 8,000 hours
- c.At least 4,000 hours
- d.At least 6,000 hours
Answer: b
Explanation: The statute defines a journeyman plumber as a person with at least 8,000 hours at the trade who has passed the examination. The 4,000-hour figure belongs to the Tradesman Plumber-Limited licence, and 6,000 and 10,000 hours do not appear in the definitions.
Source: Tex. Occ. Code §1301.002
- 2. Plumbing License Law and Board Rules
A person's plumbing licence is revoked. Under Occupations Code §1301.451, the person may apply for a new licence no earlier than:
- a.The first anniversary of the revocation
- b.The third anniversary of the revocation
- c.The date the next renewal would fall due
- d.The 90th day after the revocation
Answer: a
Explanation: A person whose licence has been revoked may not apply for a new licence before the first anniversary of the revocation. The shorter and longer periods are not what the statute provides.
Source: Tex. Occ. Code §1301.451
- 3. General Regulations
Why does IPC §312.1 prohibit air testing of PVC and ABS drainage piping?
- a.Compressed air dries the solvent cement and loosens the joints over time
- b.Compressed air overheats the pipe wall and softens it below its rating
- c.Compressed air stores energy, and a plastic pipe failure can throw fragments
- d.Compressed air cannot reveal a leak that would be found by a water test
Answer: c
Explanation: Plastic pipe can shatter under stored air pressure and send fragments across a job site, so the code bars air testing of plastic piping. Air does not harm cured solvent cement, it does find leaks, and it does not heat the pipe significantly.
Source: IPC §312.1
- 4. Plumbing Fixtures
Under IPC §417.4.2, the access and egress opening of a shower compartment must have a clear width of at least:
- a.18 inches
- b.28 inches
- c.22 inches
- d.32 inches
Answer: c
Explanation: Shower compartment openings must give a clear, unobstructed finished width of at least 22 inches. Eighteen inches is too narrow, and 28 and 32 inches exceed the plumbing code minimum (accessible showers follow other rules).
Source: IPC (2018) §421.4.2
- 5. Water Heaters
A water heater in an attic must be reached by a passageway. Under IPC §502.3, the passageway may be no longer than:
- a.50 feet, measured along its centreline from the opening to the heater
- b.10 feet, measured along its centreline from the opening to the heater
- c.20 feet, measured along its centreline from the opening to the heater
- d.100 feet, measured along its centreline from the opening to the heater
Answer: c
Explanation: The attic passageway is at least 30 inches high and 22 inches wide and not more than 20 feet long, with continuous solid flooring at least 24 inches wide. The other lengths are not the code limit.
Source: IPC §502.3
- 6. Water Supply and Distribution
Under IPC §605.3, water service pipe installed underground must have a working pressure rating of at least:
- a.100 psi at 180°F
- b.160 psi at 73°F
- c.80 psi at 73°F
- d.250 psi at 210°F
Answer: b
Explanation: Water service pipe is rated at not less than 160 psi at 73.4°F. The 100 psi at 180°F rating applies to hot and cold water distribution pipe inside the building.
Source: IPC §605.3
- 7. Sanitary Drainage
Under IPC §704.1, a 2-inch horizontal drain must be installed with a uniform slope of at least:
- a.1/2 inch per foot
- b.1/4 inch per foot
- c.1/8 inch per foot
- d.1/16 inch per foot
Answer: b
Explanation: Horizontal drainage pipe 2-1/2 inches and smaller slopes at least 1/4 inch per foot. One-eighth inch per foot is the minimum for 3- to 6-inch pipe and 1/16 inch per foot for 8 inches and larger.
Source: IPC §704.1
- 8. Sanitary Drainage
A "branch interval" on a drainage stack is defined in IPC §202 as a vertical length of stack of at least:
- a.8 feet, within which the horizontal branches of one story connect
- b.12 feet, within which the horizontal branches of two stories connect
- c.4 feet, within which the horizontal branches of one story connect
- d.20 feet, within which the horizontal branches of two stories connect
Answer: a
Explanation: The 2018 IPC defines a branch interval as a vertical distance of 8 feet or more in developed length between the connections of horizontal branches to a drainage stack, measured down from the highest branch connection; in practice it corresponds to a story. It is used to size stacks and decide when a vent stack is needed.
Source: IPC (2018) §202
- 9. Vents
An island kitchen sink is vented under IPC §916. Before the vent turns down to run below the floor, it must rise:
- a.To the underside of the roof deck above the island
- b.Above the drainage outlet of the fixture being vented
- c.To 42 inches above the finished floor of the kitchen
- d.Only to the level of the trap weir of the sink
Answer: b
Explanation: The island fixture vent rises vertically above the drainage outlet of the fixture before offsetting horizontally or downward, and cleanouts allow the vent to be rodded. It does not have to reach the roof deck at that point or a fixed 42-inch height.
Source: IPC §916.2
- 10. Fuel Gas
A house gas system is pressure tested before the meter is set. Under IFGC §406.4.1, the test pressure must be at least 1-1/2 times the proposed maximum working pressure and never less than:
- a.10 psig
- b.60 psig
- c.1 psig
- d.3 psig
Answer: d
Explanation: The test pressure is not less than one and one-half times the maximum working pressure and not less than 3 psig, whatever the design pressure. Many Texas cities amend this upward, so check the local ordinance.
Source: IFGC §406.4.1