Planting & SoilPregunta 40 de 100

Rough grading followed by finish grading before planting is done primarily to accomplish what?

a.Increase soil compaction for planting
b.Remove all topsoil from the site
c.Create low spots that hold water
d.Establish proper surface drainage and a smooth planting surface

Explicación

Grading shapes the soil surface so water drains away from structures and toward intended outlets, and finish grading creates a smooth, even bed for planting or turf. Poor grading causes ponding, erosion, and drainage complaints. Positive slope away from buildings is a core goal.

Practica las 100 preguntas gratis — sin registro.

Preguntas relacionadas de este tema

Última revisión: · proceso editorial

Equipo Editorial de PrepPass · Verificado con California CSLB C-27 Landscaping Trade Exam · Cómo revisamos
Reportar