SafetyPregunta 81 de 100
Before any excavation or trenching in California, the law requires a contractor to do what?
a.Only notify the property owner
b.Wait 30 days
c.Contact the regional notification center (DigAlert/811) to mark underground utilities
d.Dig a test hole first without notice
Explicación
California Government Code section 4216 requires excavators to contact the regional one-call center, DigAlert (811), at least two working days before digging so utility owners can mark their buried lines. This prevents striking gas, electric, and other utilities. Failing to call can cause deadly accidents and legal liability.
Referencia Legal: Gov Code §4216 (DigAlert)Practica las 100 preguntas gratis — sin registro.
Preguntas relacionadas de este tema
- Under Cal/OSHA, a trench generally must be protected by sloping, shoring, or shielding once it reaches what depth?
- California's Heat Illness Prevention standard requires employers to provide which of the following to outdoor workers?
- When operating a walk-behind mower on a slope, the recommended practice is to do what?
- In California, a person who applies restricted-use pesticides for hire generally must hold what?
- A Safety Data Sheet (SDS) for a landscape chemical provides what information?
- When operating a gas-powered chipper/shredder, which practice is safest?
Última revisión: · proceso editorial
Equipo Editorial de PrepPass · Verificado con California CSLB C-27 Landscaping Trade Exam · Cómo revisamos