ApplicationPregunta 65 de 100
Why should each coat be allowed to dry for the manufacturer's recommended recoat time before the next coat?
a.To waste time
b.Because coats can be applied with no wait time
c.Recoating too soon can trap solvents, cause wrinkling, poor adhesion, or lifting
d.Waiting changes the paint color
Explicación
Applying the next coat before the previous one has reached its recoat window can trap solvent, wrinkle the surface, or lift the underlying film. The product data sheet lists minimum (and sometimes maximum) recoat times. Respecting these windows ensures proper drying and intercoat adhesion.
Practica las 100 preguntas gratis — sin registro.
Preguntas relacionadas de este tema
- High relative humidity during application of latex paint tends to do what?
- What is the correct spray technique for keeping film thickness uniform?
- When brushing trim, why is 'tipping off' with light strokes at the end helpful?
- What is 'cutting in' when painting a room?
- Why is adequate ventilation and lighting important during interior application?
- A specification calls for 5 mils wet film thickness. Which tool confirms this during application?
Última revisión: · proceso editorial
Equipo Editorial de PrepPass · Verificado con California CSLB C-33 Painting & Decorating Trade Exam · Cómo revisamos