AdministrationPregunta 83 de 110
A rough-in inspection fails because a required cleanout was omitted at the base of a stack. What is the master plumber's correct response?
a.Cover the work and note it on the final
b.Argue the cleanout is optional
c.Install the cleanout and request a re-inspection before concealment
d.Remove the stack entirely
Explicación
The correct response is to install the missing cleanout as required and call for a re-inspection before the work is covered, because the code requires a cleanout at the base of each stack. Concealing a known deficiency risks failing the final and being ordered to open the wall. Corrective work plus re-inspection keeps the project compliant.
Referencia Legal: UPC §103.5Practica las 110 preguntas gratis — sin registro.
Preguntas relacionadas de este tema
- A plumbing job has a direct cost of $9,000. The contractor wants a 20 percent profit margin measured on the selling price (not markup on cost). Using price = cost / (1 - margin), what is the selling price?
- A master plumber estimates a job. A takeoff lists 260 ft of 3/4 in copper, 40 ft of 1 in copper, and 18 fittings. What is the estimator computing at this stage?
- A plumbing contractor prices a job using material of $4,200 and labor of $6,000, then adds 15 percent overhead and 10 percent profit on the combined cost. What is the approximate bid price?
- A master plumber pulls a permit as the responsible party of record. What obligation does being the permit holder create?
- During plan review, minimum fixtures are checked against occupancy: the table requires one water closet per 50 occupants. The occupant load is 175. What is the minimum number of water closets required?
- A finished DWV system is given a final air test instead of water. The system is pressurized to 5 psi and must hold for 15 minutes. What is the pass criterion?
Última revisión: · proceso editorial
Equipo Editorial de PrepPass · Verificado con Master Plumber Licensing Exam (UPC/IPC-based) · Cómo revisamos