Monitoring & QAPregunta 75 de 100
A sterilizer has just been relocated to a new position in the department. What testing is required before it processes patient loads?
a.A single Bowie-Dick test on the first day of use
b.Installation and requalification testing, including three consecutive negative biological indicator cycles in an empty chamber, plus three passing Bowie-Dick tests for dynamic-air-removal sterilizers
c.No testing, because the sterilizer passed all tests before it was moved
d.Only a leak test performed by the service technician
Explicación
Relocation, installation, and major repairs all trigger full qualification testing because the utilities, leveling, and connections have changed. The accepted protocol is three consecutive empty-chamber cycles with negative biological indicators, with Bowie-Dick testing added for dynamic-air-removal units. A service leak test or a single daily test is not a substitute for qualification.
Referencia Legal: AAMI ST79Practica las 100 preguntas gratis — sin registro.
Preguntas relacionadas de este tema
- A recall requires the department to trace every package from a suspect cycle. What information must the load record contain?
- A nurse reports that a tray opened in the operating room contained an internal chemical indicator that did not change. What is the correct action?
- How should the daily Bowie-Dick test cycle be run?
- What is the correct handling of the control biological indicator that accompanies a test lot?
- Which statement best describes the regulatory and standards landscape for sterile processing?
- A recall is initiated after a sterilization failure. Which action is part of a proper recall procedure?
Última revisión: · proceso editorial
Equipo Editorial de PrepPass · Verificado con HSPA Certified Registered Central Service Technician (CRCST) Exam · Cómo revisamos