Core TradesCâu 114 / 700

A water-resistive barrier (WRB) is being installed over wall sheathing. To shed water correctly, the horizontal laps must be arranged so that:

a.Upper courses tuck behind lower courses
b.All laps are sealed with tape only, in any order
c.The barrier is installed bottom to top with upper behind lower
d.Each upper course laps OVER the course below it, shingle-fashion, so water runs down the face

Giải thích

A WRB must be lapped shingle-fashion with each upper course over the one below so gravity carries water down the outer face and never behind the barrier. Tucking upper behind lower, or relying on tape in the wrong order, lets water get behind the WRB.

Trích dẫn luật: 2025 CA Building Code / CRC (Weather Protection)

Luyện miễn phí toàn bộ 700 câu hỏi — không cần đăng ký.

Câu hỏi liên quan cùng chủ đề

Cập nhật gần nhất: · quy trình kiểm tra

Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB General Building (B) Trade Examination · Quy trình kiểm tra
Báo lỗi