A secondary condensate drain pan or overflow provision under a cooling coil is required primarily to:
a.Increase the cooling capacity of the coil
b.Prevent water damage if the primary condensate drain becomes blocked
c.Improve airflow across the coil
d.Reduce compressor noise
Giải thích
The secondary pan or overflow catches condensate and signals or drains it if the primary line clogs, preventing overflow water from damaging ceilings and structure. It does not add cooling capacity, change airflow, or reduce compressor noise.
Trích dẫn luật: 2025 CA Mechanical Code §310.0Luyện miễn phí toàn bộ 700 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- A room measures 12 ft by 15 ft with an 8-ft ceiling. To provide 6 air changes per hour, what mechanical ventilation airflow is required?
- Under the California Energy Code, supply ducts run through an unconditioned attic must generally be insulated to a MINIMUM of:
- Without a booster fan, the MAXIMUM developed length of a residential clothes-dryer exhaust duct (before deductions for fittings) is generally:
- On a roof slope of 4:12 or greater covered with asphalt shingles, the underlayment must consist of at least:
- The MINIMUM roof slope on which asphalt shingles may be installed (with a doubled underlayment) is:
- A simple gable roof has two identical planes, each measuring 40 ft along the ridge by 18 ft up the slope. How many roofing squares of material cover the roof (before waste)?
Cập nhật gần nhất: · quy trình kiểm tra
Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB General Building (B) Trade Examination · Quy trình kiểm tra