Planning & EstimatingCâu 506 / 700

A project must meet CALGreen construction waste requirements. What is the general contractor's BEST approach to demonstrate compliance during the job?

a.Divert a required minimum percentage of construction and demolition debris from landfill and keep documented records of recycling and reuse
b.Send all debris to the landfill and pay a fee
c.Burn scrap on site to reduce hauling
d.Assume the demolition sub handles it with no documentation

Giải thích

CALGreen requires diverting a minimum percentage of construction and demolition waste from landfills through recycling and reuse, supported by a waste management plan and documented receipts. Option a reflects this. Landfilling everything (b) fails the diversion target, on-site burning (c) is prohibited and unsafe, and undocumented reliance on a sub (d) leaves no proof of compliance for inspection.

Trích dẫn luật: 2025 California Green Building Standards Code (CALGreen)

Luyện miễn phí toàn bộ 700 câu hỏi — không cần đăng ký.

Câu hỏi liên quan cùng chủ đề

Cập nhật gần nhất: · quy trình kiểm tra

Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB General Building (B) Trade Examination · Quy trình kiểm tra
Báo lỗi