Planning & EstimatingCâu 505 / 700

When performing a quantity takeoff from a set of plans, which practice BEST reduces costly estimating errors?

a.Rounding every dimension down to the nearest foot to save material
b.Estimating only from memory of similar past jobs
c.Counting only the most expensive materials and guessing the rest
d.Systematically measuring each assembly, cross-checking scale against noted dimensions, and applying consistent waste factors

Giải thích

Accurate takeoffs come from a systematic, checked process: measure each assembly, verify the drawing scale against the dimensions actually written on the plans, and apply consistent waste and coverage factors. Option d captures this. Rounding down (a) causes shortages, memory-only estimates (b) miss job-specific conditions, and guessing (c) produces unreliable bids.

Luyện miễn phí toàn bộ 700 câu hỏi — không cần đăng ký.

Câu hỏi liên quan cùng chủ đề

Cập nhật gần nhất: · quy trình kiểm tra

Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB General Building (B) Trade Examination · Quy trình kiểm tra
Báo lỗi