During a pre-pour inspection of a footing formed directly against earth, you check the reinforcing steel. Which condition is MOST important to verify before concrete is placed?
a.That the bars are painted for identification
b.That the bars are tied with the maximum number of ties
c.That the bars touch the soil for a solid bond
d.That the bars have adequate concrete cover and are held off the soil
Giải thích
Reinforcing steel must have adequate concrete cover, especially for concrete cast against earth, and must be supported off the soil so concrete fully surrounds it and protects it from corrosion. Option a is irrelevant to structural performance. Option b confuses excess tying with correctness. Option c is a defect: bars touching soil have no cover and will corrode. Confirming cover and support prevents a failed inspection and future spalling.
Luyện miễn phí toàn bộ 700 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- Before starting sitework, the crew needs a consistent reference for all elevations across the project. Which practice BEST establishes this?
- Near the end of a project, the owner and architect walk the building and create a list of incomplete or defective items to be corrected before final payment. What is this document BEST called?
- On a new residential project subject to CALGreen, a submitted showerhead is rated at 2.5 gallons per minute. What is the BEST assessment of water-efficiency compliance?
- A set of 6 identical spread (pad) footings is shown, each 3 ft by 3 ft in plan and 12 in deep. What is the MINIMUM volume of concrete required for all six?
- A round drilled pier is 24 inches in diameter and 18 ft deep. Using pi = 3.1416, what is the APPROXIMATE volume of concrete required to fill it?
- A concrete stem wall is 10 inches thick, 3 ft tall, and 80 ft long. How many cubic yards of concrete are required?
Cập nhật gần nhất: · quy trình kiểm tra
Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB General Building (B) Trade Examination · Quy trình kiểm tra