Lập kế hoạch & Dự toánCâu 384 / 521
Who is normally responsible for obtaining the electrical permit for a project?
a.The licensed contractor performing the work
b.The serving electric utility
c.The project architect
d.The building inspector
Giải thích
The licensed contractor doing the installation normally pulls the permit and is responsible for the work being inspected. The utility connects power, the architect designs, and the inspector reviews the work rather than obtaining the permit.
Luyện miễn phí toàn bộ 521 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- Under the optional dwelling method, at what percentage is the nameplate rating of the air-conditioning equipment included in the heating/AC portion of the calculation?
- Using the optional method, a dwelling's 220.82(B) other loads (general lighting, appliances, etc., excluding heating/AC) sum to 40 kVA. What is the calculated demand for that portion?
- In the normal permit and inspection sequence, when is the final electrical inspection performed?
- What is the primary purpose of a single-line (one-line) diagram?
- What information does a panel schedule provide?
- For a branch circuit, what maximum voltage drop does the NEC recommend for reasonable efficiency?
Cập nhật gần nhất: · quy trình kiểm tra
Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB C-10 Electrical Trade Examination · Quy trình kiểm tra