Quản lý & HACCPCâu 275 / 320
A steakhouse wants to package raw beef using a cook-chill process with reduced-oxygen packaging for later reheating. What is the manager's correct sequence before starting?
a.Start immediately and apply for approval later if asked
b.Obtain a variance if required, develop and get approval of a HACCP plan, then train staff and begin
c.Only buy new vacuum sealers and start the same day
d.Ask the food supplier for permission instead of the regulator
Giải thích
For a specialized process like cook-chill with reduced-oxygen packaging, the manager must first secure any required variance and an approved HACCP plan, then train staff to follow it, before the process begins. Doing the paperwork after the fact leaves the operation running an unapproved, higher-risk process. The regulatory authority, not the supplier, grants this approval.
Trích dẫn luật: FDA Food Code §3-502.11Luyện miễn phí toàn bộ 320 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- Why is record-keeping (HACCP Principle 7) essential even when everything appears to be running smoothly?
- Heavy flooding from a storm sends several inches of water across the kitchen floor and into dry storage. What is the correct response?
- After a confirmed outbreak, the operation reviews what went wrong and updates its procedures and training. What is the value of this final step?
- In a recall scenario, why should the operation keep purchase records and product lot information organized in advance?
- Which statement best captures why establishing critical limits (Principle 3) must be measurable?
- During a boil-water advisory issued by the local authority, what is the safest practice for the operation?
Cập nhật gần nhất: · quy trình kiểm tra
Đội Ngũ Biên Tập PrepPass · Đối chiếu với ServSafe Food Protection Manager Exam · Quy trình kiểm tra