Two convoys leave bases 360 miles apart at the same time and drive toward each other on the same road, one at 50 miles per hour and the other at 40 miles per hour. How long until they meet?

  • a.4.5 hours
  • b.8.0 hours
  • c.9.0 hours
  • d.4.0 hours✓

Two vehicles closing on each other shut the gap at the SUM of their speeds: 50 + 40 = 90 mph, so the time is 360 / 90 = 4.0 hours. Averaging the speeds instead of adding gives 360 / 45 = 8.0 hours, and sending each convoy half the distance at its own speed gives 180 / 40 = 4.5 hours.

Arithmetic Reasoning

A courier drives 150 miles to a depot at an average of 50 miles per hour, spends 45 minutes unloading, and returns over the same route at 60 miles per hour. How long does the entire trip take?

  • a.6.75 hours
  • b.5.50 hours
  • c.6.25 hours✓
  • d.5.75 hours

Add the two legs and the stop separately. Out: 150 / 50 = 3 hours. Back: 150 / 60 = 2.5 hours. Stop: 45 / 60 = 0.75 hour. Total = 3 + 2.5 + 0.75 = 6.25 hours. Leaving the unloading time out gives 5.50 hours, and running both legs at 50 mph gives 6.75 hours.

Arithmetic Reasoning

A supply truck leaves a base at 0700 traveling 45 miles per hour. A car leaves the same base at 0900 on the same road at 65 miles per hour. How long after the car starts does it overtake the truck?

  • a.1.4 hours
  • b.2.3 hours
  • c.4.5 hours✓
  • d.0.8 hours

First the head start: the truck has run 2 hours at 45 mph, so it is 90 miles ahead. A chaser closes a gap at the DIFFERENCE of the speeds, 65 - 45 = 20 mph, so the car needs 90 / 20 = 4.5 hours. Crediting only a one-hour head start gives 2.3 hours, and dividing 90 by the car's own 65 mph gives 1.4 hours.

Arithmetic Reasoning

A bus covers the first 60 miles of a trip at 30 miles per hour and the remaining 240 miles at 60 miles per hour. What is its average speed for the whole trip?

  • a.45 mph
  • b.50 mph✓
  • c.90 mph
  • d.60 mph

Average speed is total distance over total time, never the average of the two speeds. The legs take 60 / 30 = 2 hours and 240 / 60 = 4 hours, so 300 miles / 6 hours = 50 mph. Splitting the difference between 30 and 60 gives 45 mph, adding them gives 90 mph, and quoting the longer leg alone gives 60 mph.

Arithmetic Reasoning

A driver must cover 240 miles in 4 hours. After 2 hours he has traveled only 100 miles. What average speed must he hold over the rest of the route to arrive on time?

  • a.60 mph
  • b.35 mph
  • c.50 mph
  • d.70 mph✓

Subtract before dividing: 240 - 100 = 140 miles still to go in 4 - 2 = 2 hours left, so he needs 140 / 2 = 70 mph. Dividing the 140 remaining miles by the full 4 hours gives 35 mph, 240 / 4 = 60 mph is only the trip's overall requirement, and 100 / 2 = 50 mph is the speed already run.

Arithmetic Reasoning

A boat runs 30 miles downstream in 2 hours and the same 30 miles back upstream in 3 hours. What is the speed of the current?

  • a.10.0 mph
  • b.12.5 mph
  • c.5.0 mph
  • d.2.5 mph✓

Downstream speed is boat plus current, 30 / 2 = 15 mph; upstream is boat minus current, 30 / 3 = 10 mph. The gap between them is twice the current, so the current is (15 - 10) / 2 = 2.5 mph. Stopping at the difference gives 5.0 mph, and half the sum, 12.5 mph, is the boat's own speed in still water.

Arithmetic Reasoning

A flight covers 1200 miles. If the average ground speed is raised from 300 miles per hour to 400 miles per hour, how much time is saved?

  • a.12.0 hours
  • b.3.0 hours
  • c.1.5 hours
  • d.1.0 hours✓

Time each version of the flight, then subtract: 1200 / 300 = 4 hours at the slower speed and 1200 / 400 = 3 hours at the faster one, so the saving is 4 - 3 = 1.0 hours. Dividing the distance by the 100 mph difference in speed gives 12.0 hours, and 3.0 hours is the new flight time rather than the time saved.

Arithmetic Reasoning

A supply pipe fills an empty tank in 6 hours. A drain valve left open empties a full tank in 9 hours. With both the pipe and the valve running, how long does the empty tank take to fill?

  • a.3.0 hours
  • b.3.6 hours
  • c.15.0 hours
  • d.18.0 hours✓

Work in tanks per hour. Filling adds 1/6 and draining removes 1/9, so the net rate is 1/6 - 1/9 = 3/18 - 2/18 = 1/18 of a tank an hour, and the fill takes 18.0 hours. Adding the rates as if both filled gives 3.6 hours, and adding the two times gives 15.0 hours; times never add.

Arithmetic Reasoning

Working together, two mechanics service a truck in 4 hours. Working alone, the first mechanic would need 12 hours. How long would the second mechanic need working alone?

  • a.3 hours
  • b.16 hours
  • c.8 hours
  • d.6 hours✓

Rates add, times do not. Together the pair finishes 1/4 of the truck an hour and the first does 1/12, so the second does 1/4 - 1/12 = 3/12 - 1/12 = 1/6 an hour, which is 6 hours alone. Subtracting the two times gives 8 hours, adding them gives 16 hours, and 12 / 4 gives 3 hours; none of those are rates.

Arithmetic Reasoning

A job takes 6 workers 10 days. The contractor now needs the same job done in 4 days, with every worker keeping the same pace. How many additional workers must be hired?

  • a.15 workers
  • b.6 workers
  • c.9 workers✓
  • d.24 workers

Total effort is fixed: 6 x 10 = 60 worker-days. Finishing in 4 days needs 60 / 4 = 15 workers, and 15 - 6 = 9 of them must be hired. Answering 15 workers reports the whole crew instead of the hires, and 6 x 4 = 24 treats workers and days as directly proportional when fewer days demands more workers.

Arithmetic Reasoning

One press prints 480 flyers an hour and a second press prints 320 flyers an hour. Running both at once, how long will an order of 2000 flyers take?

  • a.1.5 hours
  • b.2.5 hours✓
  • c.6.3 hours
  • d.4.2 hours

When two machines run at once, add their rates: 480 + 320 = 800 flyers an hour, so 2000 / 800 = 2.5 hours. Using the fast press alone gives 2000 / 480 = 4.2 hours and the slow one alone gives 2000 / 320 = 6.3 hours. Both are longer than the answer, which is the check that the rates were summed.

Arithmetic Reasoning

A crew paints 2/5 of a fence in 6 hours. Working at the same steady rate, how many more hours does the crew need to finish the fence?

  • a.9.0 hours✓
  • b.3.6 hours
  • c.10.0 hours
  • d.15.0 hours

Scale the elapsed time by the ratio of the work. The 3/5 still unpainted is 3/2 of the 2/5 already done, so it takes 6 x 3/2 = 9.0 hours more. The whole fence takes 6 divided by 2/5 = 15.0 hours, which is the total job and not what remains, and multiplying 6 by 3/5 gives 3.6 hours.

Arithmetic Reasoning

One loader can fill a truck in 45 minutes. It works alone for 15 minutes, and then a second loader that would need 30 minutes by itself joins in. How many more minutes does the job take?

  • a.30 minutes
  • b.12 minutes✓
  • c.18 minutes
  • d.20 minutes

In its first 15 minutes the loader finishes 15/45 = 1/3 of the truck, leaving 2/3. Now the rates add: 1/45 + 1/30 = 2/90 + 3/90 = 1/18 of the truck a minute, so 2/3 divided by 1/18 = 12 minutes. Ignoring the head start and doing the whole truck together gives 18 minutes.

Arithmetic Reasoning

A store raises the price of a $50 tool by 20 percent, and a month later cuts the new price by 20 percent. What is the final price?

  • a.$60.00
  • b.$48.00✓
  • c.$50.00
  • d.$40.00

Percent changes multiply, and each one applies to the price in force at the time. Up: 50 x 1.20 = $60.00. Down: 60 x 0.80 = $48.00. Equal percents up and down do not cancel, because the cut is taken on the larger price; assuming they cancel gives $50.00, and cutting the original instead gives $40.00.

Arithmetic Reasoning

After a 12 percent raise, a technician earns $980 a week. What was the weekly pay before the raise?

  • a.$875✓
  • b.$1,098
  • c.$968
  • d.$862

The new pay is 112 percent of the old pay, so divide rather than subtract: 980 / 1.12 = $875. Taking 12 percent off $980 gives $862, which is too small because the raise was figured on the smaller old pay; adding 12 percent instead gives $1,098, and subtracting $12 gives $968.

Arithmetic Reasoning

A gym gained 45 members this year and now has 345 members. What was the percent increase in membership?

  • a.13%
  • b.15%✓
  • c.115%
  • d.87%

Percent change always uses the ORIGINAL as the base, and here the original is 345 - 45 = 300. So 45 / 300 = 0.15, or 15%. Dividing the gain by the new total of 345 gives 13%, dividing 300 by 345 gives 87%, and 345 / 300 = 115% states the new size as a percent of the old rather than the increase.

Arithmetic Reasoning

A $240 chair is marked 25 percent off, and members take a further 10 percent off the sale price. What does a member pay?

  • a.$168.00
  • b.$180.00
  • c.$162.00✓
  • d.$156.00

Stacked discounts multiply on the running price: 240 x 0.75 = $180.00, then 180 x 0.90 = $162.00. Adding the two cuts into 35 percent off and computing 240 x 0.65 = $156.00 is the classic error, since the second cut comes off the reduced $180.00 and not off the full $240.

Arithmetic Reasoning

A store buys a jacket for $45, marks it up 60 percent, and later puts it on sale at 25 percent off the marked price. What is the sale price?

  • a.$33.75
  • b.$60.75
  • c.$72.00
  • d.$54.00✓

Apply each percent to the price then in force. Marked price: 45 x 1.60 = $72.00. Sale price: 72 x 0.75 = $54.00. Netting the two changes to plus 35 percent and computing 45 x 1.35 = $60.75 fails because the 25 percent comes off $72.00, and taking it off cost gives $33.75.

Arithmetic Reasoning

A production line's defect rate fell from 8 percent to 6 percent. By what percent did the defect rate itself fall?

  • a.75%
  • b.33%
  • c.2%
  • d.25%✓

A change measured in percentage points is not a percent change. The drop is 8 - 6 = 2 points, and as a fraction of the starting 8 that is 2 / 8 = 0.25, or 25%. Answering 2% reports the points, dividing by the new rate of 6 gives 33%, and 6 / 8 = 75% says what the rate is now relative to before.

Arithmetic Reasoning

A unit's monthly supply budget rose 20 percent this year to $960. Next year it is scheduled to fall 15 percent from the current figure. What will next year's budget be?

  • a.$816✓
  • b.$1,104
  • c.$960
  • d.$800

Only the current $960 matters, because the 20 percent rise is already inside that figure and is not applied again. Next year = 960 x 0.85 = $816. Undoing the 20 percent back to $800 answers about the wrong year, and 960 x 1.15 = $1,104 raises a budget the schedule actually cuts.

Arithmetic Reasoning

The ratio of trucks to cars in a motor pool is 3 to 7, and there are 24 more cars than trucks. How many vehicles are in the pool altogether?

  • a.60 vehicles✓
  • b.42 vehicles
  • c.18 vehicles
  • d.240 vehicles

Give the ratio units. Trucks are 3 parts and cars are 7, so the surplus of cars is 7 - 3 = 4 parts. Those 4 parts are the 24 extra cars, so one part is 24 / 4 = 6 vehicles, and the pool is 3 + 7 = 10 parts, or 60 vehicles. Answering 42 counts the cars alone and 18 counts the trucks alone.

Arithmetic Reasoning

A mix holds 8 quarts of concentrate and 20 quarts of water. How many quarts of water must be added to make the ratio of concentrate to water 1 to 4?

  • a.52 quarts
  • b.4 quarts
  • c.32 quarts
  • d.12 quarts✓

The concentrate never changes, so pin it down and solve for the water it must face: 1 to 4 means water = 4 x 8 = 32 quarts. There are already 20, so add 32 - 20 = 12 quarts. Answering 32 quarts reports the final amount of water rather than the amount poured in, and adding the two gives 52 quarts.

Arithmetic Reasoning

A concrete mix combines cement, sand, and gravel in a ratio of 1 to 3 to 4 by weight. What percent of the mix is sand?

  • a.50.0%
  • b.75.0%
  • c.37.5%✓
  • d.12.5%

Turn a ratio into a percent by putting each part over the TOTAL number of parts: 1 + 3 + 4 = 8 parts, so sand is 3/8 = 37.5%. The same method gives cement 1/8 = 12.5% and gravel 4/8 = 50.0%. Comparing sand with gravel alone gives 3/4 = 75.0%, which answers a question nobody asked.

Arithmetic Reasoning

A 60-pound alloy is mixed 3 parts copper to 2 parts zinc. How many pounds of copper must be added so that the alloy becomes 4 parts copper to 2 parts zinc?

  • a.16 pounds
  • b.12 pounds✓
  • c.24 pounds
  • d.6 pounds

Adding copper leaves the zinc untouched, so anchor on zinc: it is 2/5 of 60 = 24 pounds, and copper starts at 3/5 of 60 = 36 pounds. A 4 to 2 ratio means copper must be twice the zinc, or 48 pounds, so add 48 - 36 = 12 pounds. Answering 24 pounds reports the zinc instead of the copper added.

Arithmetic Reasoning

A stockroom finds that 7 crates hold 168 bolts. At the same packing rate, how many crates are needed for 552 bolts?

  • a.79 crates
  • b.3 crates
  • c.24 crates
  • d.23 crates✓

Find the unit rate before scaling: 168 / 7 = 24 bolts per crate, so 552 / 24 = 23 crates. Dividing 552 by the 7 crates gives 79 and treats crates as bolts, 552 / 168 gives about 3, the number of 168-bolt lots, and 24 is the bolts per crate rather than a count of crates.

Arithmetic Reasoning

Two partners put $600 and $900 into a venture and split the $750 profit in proportion to what each invested. How much more does the larger investor receive than the smaller one?

  • a.$150✓
  • b.$300
  • c.$75
  • d.$450

Total invested is 600 + 900 = $1500, so the shares are 900/1500 and 600/1500 of the $750, which is $450 and $300. The difference is 450 - 300 = $150. Answering $450 gives the larger share itself and $300 the smaller one; an even split would be $375 each and no difference at all.

Arithmetic Reasoning

A photograph 4 inches wide and 6 inches tall is enlarged so that its width becomes 10 inches. If the shape is unchanged, how tall is the enlargement?

  • a.16 inches
  • b.15 inches✓
  • c.24 inches
  • d.12 inches

Similar shapes scale by a multiplier, not by an added amount. The width grows 10 / 4 = 2.5 times, so the height is 6 x 2.5 = 15 inches. Adding the 6 inches the width gained gives 12 inches and adding the new width to the old height gives 16 inches; both change the shape.

Arithmetic Reasoning

A conveyor belt moves at 22 feet per second. There are 5280 feet in a mile. What is the belt's speed in miles per hour?

  • a.15.0 mph✓
  • b.32.3 mph
  • c.1.5 mph
  • d.0.3 mph

Convert one unit at a time. 22 feet per second x 60 = 1320 feet per minute, x 60 again = 79200 feet per hour, and 79200 / 5280 = 15.0 mph. Using only one factor of 60 leaves 0.3 mph, and dividing by 3600 while multiplying by 5280 turns the conversion upside down and gives 32.3 mph.

Arithmetic Reasoning

A field kitchen uses 3 gallons of stock for each meal and must serve 5 meals. It has 20 quarts of stock on hand, and there are 4 quarts in a gallon. How many more quarts are needed?

  • a.15 quarts
  • b.40 quarts✓
  • c.60 quarts
  • d.10 quarts

Get both amounts into one unit before subtracting. The kitchen needs 3 x 5 = 15 gallons, which is 15 x 4 = 60 quarts, so it must find 60 - 20 = 40 quarts more. Answering 10 is the right shortfall in gallons but the wrong unit, 15 is the gallons needed, and 60 forgets the stock already on hand.

Arithmetic Reasoning

A machine completes one cycle every 45 seconds and runs without stopping through an 8-hour shift. How many complete cycles does it finish?

  • a.6400 cycles
  • b.640 cycles✓
  • c.480 cycles
  • d.107 cycles

Convert the shift into the cycle's own unit: 8 x 60 x 60 = 28800 seconds, so 28800 / 45 = 640 cycles. Stopping at minutes gives 480, which is the length of the shift and not a cycle count, and dividing those 480 minutes by 45 gives about 107. A decimal slip in 28800 / 45 gives 6400.

Arithmetic Reasoning

A truck carries 3.5 tons of gravel, which is bagged 50 pounds to a bag. A ton is 2000 pounds. How many bags does the load fill?

  • a.140 bags✓
  • b.700 bags
  • c.70 bags
  • d.280 bags

Convert to the smaller unit first, then divide: 3.5 x 2000 = 7000 pounds, and 7000 / 50 = 140 bags. Using 1000 pounds to the ton halves the load to 70 bags, dividing by 25 instead of 50 gives 280 bags, and a decimal slip in 7000 / 50 gives 700 bags.

Arithmetic Reasoning

A water heater leaks 1 cup every 4 minutes. There are 16 cups in a gallon. How many gallons leak in 24 hours?

  • a.90.0 gallons
  • b.1.5 gallons
  • c.22.5 gallons✓
  • d.360 gallons

Build the chain of units: 24 x 60 = 1440 minutes, 1440 / 4 = 360 cups, and 360 / 16 = 22.5 gallons. Answering 360 gallons stops one conversion short and reports cups, using 4 cups to the gallon gives 90.0, and dividing the 24 hours by 16 gives 1.5 while skipping the leak rate.

Arithmetic Reasoning

A technician earns $18.50 an hour and works 37.5 hours a week for all 52 weeks of the year. What is the yearly pay?

  • a.$8,325
  • b.$36,075✓
  • c.$34,687
  • d.$38,480

Chain the rates in order: 18.50 x 37.5 = $693.75 a week, then 693.75 x 52 = $36,075 a year. Assuming a 40-hour week instead of 37.5 gives $38,480, using 50 weeks gives $34,687, and multiplying the weekly pay by 12 months rather than 52 weeks gives $8,325.

Arithmetic Reasoning

A van averages 22 miles per gallon and fuel costs $3.60 a gallon. What is the fuel cost of a 495-mile trip?

  • a.$90.00
  • b.$79.20
  • c.$81.00✓
  • d.$137.50

Go from miles to gallons to dollars. Gallons burned = 495 / 22 = 22.5, so the cost is 22.5 x 3.60 = $81.00. Multiplying 22 x 3.60 = $79.20 prices one gallon-per-mile figure instead of the trip, dividing 495 by 3.60 gives $137.50, and rounding fuel to $4 a gallon gives $90.00.

Arithmetic Reasoning

A candidate averaged 74 on the first 4 exams of a 6-exam course. What must the last two exams average for the course average to reach 80?

  • a.184
  • b.80
  • c.86
  • d.92✓

Averages are totals in disguise. The course needs 80 x 6 = 480 points and 74 x 4 = 296 are already banked, so the last two must supply 480 - 296 = 184 points, an average of 184 / 2 = 92. Reporting 184 forgets to split those points between two exams, and 80 assumes matching the target is enough.

Arithmetic Reasoning

A course grade counts homework 40 percent, the midterm 25 percent, and the final 35 percent. A student earns 95 on homework, 72 on the midterm, and 80 on the final. What is the course grade?

  • a.76.0
  • b.84.0✓
  • c.82.3
  • d.83.2

Multiply each score by its weight, add the products, and divide by 100: (95 x 40 + 72 x 25 + 80 x 35) / 100 = (3800 + 1800 + 2800) / 100 = 84.0. Averaging the three scores as equals gives 82.3, swapping the midterm and final weights gives 83.2, and averaging just the two exams gives 76.0.

Arithmetic Reasoning

One class of 12 students averaged 88 on a test and another class of 18 students averaged 78 on the same test. What is the average for all 30 students?

  • a.86
  • b.84
  • c.82✓
  • d.83

A weighted average leans toward the larger group. Total points are 12 x 88 + 18 x 78 = 1056 + 1404 = 2460, and 2460 / 30 = 82. Averaging 88 and 78 as if the classes were the same size gives 83, and attaching each average to the other class's headcount gives 84.

Arithmetic Reasoning

The average weight of 8 boxes is 24 pounds. When one box is taken away, the remaining 7 boxes average 25 pounds. What did the box that was removed weigh?

  • a.1 pound
  • b.24 pounds
  • c.17 pounds✓
  • d.32 pounds

Turn both averages into totals and subtract: 8 x 24 = 192 pounds before and 7 x 25 = 175 pounds after, so the missing box weighed 192 - 175 = 17 pounds. It has to be below average, since removing it raised the average. Subtracting the averages gives 1 pound and swapping the counts gives 32 pounds.

Arithmetic Reasoning

A shop blends 30 pounds of coffee worth $8 a pound with 20 pounds worth $13 a pound. What must a pound of the blend sell for to bring in the same total as the two lots sold separately?

  • a.$21.00
  • b.$10.00✓
  • c.$10.50
  • d.$11.00

Total value over total weight: 30 x 8 + 20 x 13 = 240 + 260 = $500 spread over 30 + 20 = 50 pounds, so $10.00 a pound. Averaging the two prices gives $10.50 and ignores that more of the cheap lot went in, pairing each price with the other lot's weight gives $11.00, and adding the prices gives $21.00.

Arithmetic Reasoning

Six crew members averaged 42 parts a shift. After new tooling arrives, every one of them produces exactly 7 more parts a shift. What is the new average?

  • a.43 parts
  • b.84 parts
  • c.49 parts✓
  • d.42 parts

When every value in a set shifts by the same amount, the average shifts by exactly that amount: 42 + 7 = 49 parts, and the crew size is never needed. Spreading the 7 parts over six people gives about 43, and adding the crew's whole gain of 6 x 7 = 42 to the old average gives 84.

Arithmetic Reasoning

A hardware store marks a cordless drill at $148 and runs a sale taking 35 percent off. What does a customer pay for the drill before tax?

  • a.$96.20✓
  • b.$113.00
  • c.$51.80
  • d.$62.53

Sale price = original x (100 - discount) / 100, so $148 x 65/100 = $96.20. Taking 35 percent of $148 alone gives $51.80, which is the discount and not the price; subtracting 35 as dollars gives $113.00; applying the 35 percent cut twice gives $62.53.

Arithmetic Reasoning

A shop buys work jackets for $38 each and marks them up 60 percent of cost to set the shelf price. What is the shelf price of one jacket?

  • a.$95.00
  • b.$98.00
  • c.$22.80
  • d.$60.80✓

A markup on cost means price = cost x (100 + markup) / 100, so $38 x 160/100 = $60.80. The $22.80 figure is only the markup itself; adding 60 as dollars gives $98.00; dividing by 40 percent, as if the 60 percent were a margin on the selling price, gives $95.00.

Arithmetic Reasoning

A customer buys 3 air filters at $18.50 each and 2 quarts of oil at $7.25 each. Sales tax of 8 percent is charged on the whole purchase. What is the total paid?

  • a.$75.60✓
  • b.$81.65
  • c.$70.00
  • d.$78.00

Total the goods first, then tax the total once. 3 x $18.50 = $55.50 and 2 x $7.25 = $14.50, so the goods come to $70.00, and $70.00 x 108/100 = $75.60. Stopping at $70.00 forgets the tax, adding $8 flat gives $78.00, and taxing the taxed total again gives $81.65.

Arithmetic Reasoning

A salesperson is paid $1,600 a month plus a commission of 7 percent on everything sold. In a month with $24,000 in sales, what is the total pay?

  • a.$1,680
  • b.$1,792
  • c.$1,768
  • d.$3,280✓

Pay = base + rate x sales. Seven percent of $24,000 is $1,680, and $1,600 + $1,680 = $3,280. Reporting $1,680 alone drops the base salary, using 0.7 percent instead of 7 gives $1,768, and paying commission on sales plus base rather than sales alone gives $1,792.

Arithmetic Reasoning

Four friends split an $86.40 restaurant bill evenly, and each one adds a 20 percent tip on his own share. How much does each friend pay in all?

  • a.$103.68
  • b.$25.92✓
  • c.$21.60
  • d.$38.88

Split first, then tip the share: $86.40 / 4 = $21.60, and $21.60 x 120/100 = $25.92. The $21.60 leaves the tip off; adding 20 percent of the whole bill to one share gives $38.88; $103.68 is the entire bill with tip, which is four people's money, not one.

Arithmetic Reasoning

A shop marks up a bicycle that cost it $240 by 25 percent, then later puts that bicycle on sale at 25 percent off the marked price. What does a customer pay?

  • a.$300.00
  • b.$225.00✓
  • c.$180.00
  • d.$240.00

Percent changes multiply in sequence, they do not cancel, because the second percent is taken on a larger number. $240 x 125/100 = $300.00 marked, then $300.00 x 75/100 = $225.00 paid. Assuming the two 25 percents undo each other gives $240.00, and discounting the cost gives $180.00.

Arithmetic Reasoning

A real estate agent is paid a commission of 4 percent of the selling price. The agent earned $1,380 on one sale. What was the selling price?

  • a.$3,450
  • b.$34,500✓
  • c.$5,520
  • d.$345,000

Commission = rate x price, so price = commission / rate: $1,380 / 0.04 = $34,500. Check it by taking 4 percent of the answer. Multiplying by 4 instead of dividing gives $5,520, reading the rate as 40 percent gives $3,450, and reading it as 0.4 percent gives $345,000.

Arithmetic Reasoning

A credit union lends $7,500 at simple interest. The borrower pays $975 in interest over 2 years. What annual rate was charged?

  • a.13%
  • b.6.5%✓
  • c.0.65%
  • d.3.25%

Simple interest is I = P x r x t, so r = I / (P x t) = $975 / ($7,500 x 2) = 0.065, which is 6.5 percent a year. Dividing by the principal but not by the 2 years gives 13 percent, the two-year total rather than the annual rate, and slipping one decimal place gives 0.65 percent.

Arithmetic Reasoning

A $5,000 deposit earns 6 percent annual interest compounded semiannually. What is the balance after one year?

  • a.$5,618.00
  • b.$5,150.00
  • c.$5,300.00
  • d.$5,304.50✓

Compounding semiannually splits the year into two periods that each get half the annual rate: 6/2 = 3 percent, applied twice. $5,000 x 1.03 x 1.03 = $5,304.50. Simple interest for one year gives $5,300.00, one 3 percent period alone gives $5,150.00, and applying the full 6 percent twice gives $5,618.00.

Arithmetic Reasoning

A contractor borrows $9,000 at 7 percent simple interest and repays the loan in one payment 18 months later. How much is that single payment?

  • a.$10,260
  • b.$9,945✓
  • c.$20,340
  • d.$9,630

Convert the term to years before using I = P x r x t: 18 months is 18/12 = 1.5 years. Interest is $9,000 x 0.07 x 1.5 = $945, so the payment is $9,945. Treating the term as one year gives $9,630, rounding it to two years gives $10,260, and using 18 as the number of years gives $20,340.

这门考试有多难?

ASVAB 是美国军队的入伍能力测评——计算机自适应的 CAT-ASVAB 约 2 小时,涵盖十个分测验,由军方免费施测。没有通过/不通过:其中四个分测验(算术推理、数学知识、词汇知识、段落理解)合成你的 AFQT 百分位,各军种自定入伍所需的 AFQT 最低分。我们的题库覆盖其中八个领域——把汽车与工场知识合并为一项,且没有物件组装(Assembling Objects)题。

推荐学习时间
把复习重点放在四个 AFQT 分测验上,因为它们决定入伍资格;算术与词汇练得最多。
通过率
我们在 2026 年 9 月查阅了 Official ASVAB 自己公布的材料,其中没有通过率。根本没有可供通过率描述的对象:「AFQT 成绩以 1-99 的百分位数报告。AFQT 百分位表示参照组中得分等于或低于该分数的考生比例。」百分位是相对其他考生的排名,而不是一条要跨过的及格线。来源: Official ASVAB — Understanding ASVAB Scores (applicants)
重点学习方向
四个 AFQT 分测验——算术推理、数学知识、词汇知识与段落理解——决定你的入伍分数。

费用与薪资为近似值,会随时间变动。上方的通过率引自旁边链接的来源,并限于该来源覆盖的期间——凡是我们尚未核实来源的,都会直接说明并且不给数字。