Master Electrician (NEC) — All Questions

这些题目考的数字,按章节排在可打印的彩色高密度页面上: 速记册,$9.99 →

拥有完整的 Master Electrician (NEC) 学习指南 —— PDF + EPUB,$14.99 →

← Back to practice

66 questions

Services & Distribution

A 208-V, three-phase feeder supplies a 120,000-VA load. What is the calculated feeder current?

  • a.577 A
  • b.288 A
  • c.333 A✓
  • d.200 A

Three-phase current = 120,000 / (1.732 x 208) = 333 A.

Services & Distribution

A 225-A busbar is fed by a 225-A main breaker at one end. Using the 120% rule, what is the maximum back-fed inverter (PV) supply breaker at the opposite end?

  • a.60 A
  • b.45 A✓
  • c.40 A
  • d.30 A

2023 NEC 705.12(B)(3): 120% of the 225-A busbar = 270 A; subtract the 225-A main: 270 - 225 = 45 A maximum for the back-fed supply breaker.

Services & Distribution

A feeder is protected by a 500-A overcurrent device. What is the minimum copper equipment grounding conductor?

  • a.#2 AWG✓
  • b.#3 AWG
  • c.#4 AWG
  • d.#1 AWG

2023 NEC Table 250.122: a 500-A overcurrent device requires a #2 Cu equipment grounding conductor.

Services & Distribution

A feeder is protected by an 800-A overcurrent device. What is the minimum copper equipment grounding conductor?

  • a.1/0 AWG✓
  • b.#2 AWG
  • c.#1 AWG
  • d.2/0 AWG

2023 NEC Table 250.122: an 800-A overcurrent device requires a 1/0 Cu equipment grounding conductor.

Services & Distribution

A feeder is protected by a 1,200-A overcurrent device. What is the minimum copper equipment grounding conductor?

  • a.3/0 AWG✓
  • b.4/0 AWG
  • c.#1 AWG
  • d.2/0 AWG

2023 NEC Table 250.122: a 1,200-A overcurrent device requires a 3/0 Cu equipment grounding conductor.

Services & Distribution

A service uses 1/0 AWG copper ungrounded conductors. What is the minimum copper grounding electrode conductor?

  • a.#4 AWG
  • b.#2 AWG
  • c.#6 AWG✓
  • d.#8 AWG

2023 NEC Table 250.66: service conductors of 1 or 1/0 Cu require a #6 Cu grounding electrode conductor.

Services & Distribution

A service uses 750-kcmil copper ungrounded conductors. What is the minimum copper grounding electrode conductor?

  • a.2/0 AWG✓
  • b.3/0 AWG
  • c.1/0 AWG
  • d.#1 AWG

2023 NEC Table 250.66: over 600 through 1,100 kcmil Cu requires a 2/0 Cu grounding electrode conductor.

Services & Distribution

A separately derived system (transformer) has 600-kcmil copper derived conductors. What is the minimum copper supply-side bonding jumper?

  • a.1/0 AWG✓
  • b.#1 AWG
  • c.2/0 AWG
  • d.#2 AWG

2023 NEC 250.30(A)(2) with Table 250.102(C)(1): over 350 through 600 kcmil Cu requires a 1/0 Cu bonding jumper.

Services & Distribution

Service-entrance conductors supply a 150-A continuous load. What minimum conductor ampacity is required?

  • a.187.5 A✓
  • b.150 A
  • c.200 A
  • d.165 A

2023 NEC 230.42(A): service conductors must carry at least 125% of the continuous load: 150 x 1.25 = 187.5 A.

Services & Distribution

A service has 3/0 AWG copper ungrounded conductors. What is the minimum copper bonding jumper for the metal underground water pipe?

  • a.#2 AWG
  • b.#6 AWG
  • c.#4 AWG✓
  • d.#8 AWG

2023 NEC 250.104(A)(1) sizes the water-pipe bonding jumper from Table 250.66: 2/0-3/0 Cu service conductors require a #4 Cu bonding jumper.

Services & Distribution

Under 2023 NEC 110.9, a circuit breaker or fuse intended to interrupt fault current must have an interrupting rating that is:

  • a.125% of the continuous load
  • b.equal to the connected load current
  • c.at least the available fault current at its line terminals✓
  • d.the same as the largest downstream conductor ampacity

2023 NEC 110.9 requires the device's interrupting rating to be at least the available fault current where it is applied; ampacity and load current size the device only for normal operation.

Services & Distribution

A downstream circuit breaker has an interrupting rating below the available fault current. It may still be applied only if:

  • a.the connected load is noncontinuous
  • b.it is a molded-case type
  • c.it is derated 20% for continuous operation
  • d.it is part of a listed, tested series combination with the line-side device✓

2023 NEC 240.86 permits a lower-rated downstream breaker only as part of a tested, marked series combination with the line-side OCPD (or under engineering supervision). Derating does not raise interrupting rating.

Services & Distribution

Service phase conductors total 1,100 kcmil Cu per phase. Using the bonding table, what is the minimum copper main bonding jumper?

  • a.1/0 AWG
  • b.2/0 AWG✓
  • c.#1 AWG
  • d.3/0 AWG

2023 NEC 250.28(D)(1) with Table 250.102(C)(1): over 600 through 1,100 kcmil Cu requires a 2/0 Cu main bonding jumper.

Services & Distribution

What is the maximum rating of the overcurrent device that may protect a 400-A-rated panelboard?

  • a.350 A
  • b.450 A
  • c.400 A✓
  • d.500 A

2023 NEC 408.36: a panelboard must be protected by an overcurrent device rated no more than the panelboard rating, so 400 A is the maximum.

Services & Distribution

A single made electrode (ground rod) must be supplemented by a second electrode unless its resistance to earth does not exceed:

  • a.1 ohm
  • b.5 ohms
  • c.25 ohms✓
  • d.10 ohms

2023 NEC 250.53(A)(2): a single rod, pipe, or plate electrode must be supplemented unless it has a resistance to earth of 25 ohms or less.

Services & Distribution

A branch circuit is protected by a 30-A overcurrent device. What is the minimum copper equipment grounding conductor?

  • a.#12 AWG
  • b.#10 AWG✓
  • c.#14 AWG
  • d.#8 AWG

2023 NEC Table 250.122: overcurrent devices from 30 through 60 A require a #10 Cu equipment grounding conductor.

这门考试有多难?

电工技师(Master)执照由各州主办、以 NEC 为依据,因此格式因州而异。例如在德州,考试分两个开卷部分(2023 NEC)——75 道 NEC 知识题与 33 道计算题(共 108 题)——各须 70% 方可通过,费用 78 美元。电工年薪中位数约 62,350 美元(BLS,2024 年 5 月)。

推荐学习时间
多数人 80-150 小时——技师考试比熟练工增加更重的计算与规范应用深度。
官方公布的通过率
19.08% (来源未说明统计的是哪些考次)(n = 3,946);22.21% (来源未说明统计的是哪些考次)(n = 3,472) —— Texas TDLR,FY 2025。请把它们看作两场考试而非一场:TDLR 并没有名为「Master Electrician」的行,只有「Master Calculations」(第一个数字)和「Master NEC」(第二个数字)。任何引用单一「德州 master 通过率 19%」的说法,都悄悄丢掉了一半考试。执照按州发放,因此这只适用于德州。来源: Texas TDLR — Electrician Exam Statistics, Fiscal Year 2025
重点学习方向
服务、服务设备与单独派生系统是最重的板块之一(德州约 18%),外加负载计算部分。

费用与薪资为近似值,会随时间变动。上方的通过率引自旁边链接的来源,并限于该来源覆盖的期间——凡是我们尚未核实来源的,都会直接说明并且不给数字。

反馈