管理与 HACCP第 275 / 500 题95% 的考生答对了这道题

A steakhouse wants to package raw beef using a cook-chill process with reduced-oxygen packaging for later reheating. What is the manager's correct sequence before starting?

a.Obtain a variance if required, develop and get approval of a HACCP plan, then train staff and begin
b.Begin packaging right away and submit the HACCP plan afterward if an inspector asks for it
c.Buy a chamber vacuum sealer, label each bag with a use-by date, and start packaging the beef the same day
d.Get written permission from the beef supplier rather than from the regulatory authority

解析

For a specialized process like cook-chill with reduced-oxygen packaging, the manager must first secure any required variance and an approved HACCP plan, then train staff to follow it, before the process begins. Doing the paperwork after the fact leaves the operation running an unapproved, higher-risk process. New equipment and use-by labels are part of the plan but do not replace the approval, and the regulatory authority, not the supplier, is the body that grants it.

法律依据: FDA Food Code §3-502.11

免费刷完整 500 道题库 — 无需注册。

Own the complete ServSafe Food Protection Manager guide — PDF + EPUB, $19.99 →

同考点相关题目

最近核对: · 审核流程

PrepPass 团队 · 依据官方资料核对 ServSafe Food Protection Manager Exam · 我们如何核对
反馈