Chapter 5 of 520% of exam

Construction Surveying

The final area is layout and quantities: getting the design onto the ground and measuring what is built.

Grade stakes and cut or fill

Cut or fill at a stake is the existing ground or stake elevation minus the design grade: positive is cut, negative is fill. With a level set up, grade rod = height of instrument − design elevation, and cut or fill = grade rod − ground rod. Offset stakes are set a stated distance from the work so they survive construction, and are marked with station, offset and cut or fill to a named point such as flow line or top of curb.

Slope staking and layout

A slope stake marks where the design side slope meets natural ground (the catch point). Its distance from centreline is half the roadbed width plus the slope ratio times the cut or fill at that point, found by trial in the field. Buildings are laid out from control with batter boards or offset hubs, and pipelines by line and grade from offset stakes, lasers or machine control.

Earthwork quantities

The average end area method gives V = L·(A1 + A2)/2, in cubic feet, divided by 27 for cubic yards; it overstates volume slightly where areas differ greatly, and the prismoidal formula corrects for that. Borrow pit volumes use grid cell area times the average of corner depths. Account for swell from bank to loose volume and shrinkage from bank to compacted volume when balancing cut and fill.