A grade stake is set where the ground (top of hub) elevation is 104.62 ft. The design finished grade at that point is 101.30 ft. What should be marked on the stake?
- a.C 1.66
- b.F 3.32
- c.C 3.32✓
- d.F 6.64
Cut or fill = hub elevation - design grade = 104.62 - 101.30 = +3.32 ft. The ground is above grade, so material must be removed: a cut of 3.32 ft. Reversing C and F is the costly mistake, since the contractor grades the wrong way.
A grade stake is set where the ground (top of hub) elevation is 88.15 ft. The design finished grade at that point is 92.40 ft. What should be marked on the stake?
- a.C 8.50
- b.F 2.12
- c.F 4.25✓
- d.C 4.25
Cut or fill = hub elevation - design grade = 88.15 - 92.40 = -4.25 ft. The ground is below grade, so material must be added: a fill of 4.25 ft. Reversing C and F is the costly mistake, since the contractor grades the wrong way.
A grade stake is set where the ground (top of hub) elevation is 251.07 ft. The design finished grade at that point is 248.50 ft. What should be marked on the stake?
- a.F 5.14
- b.F 2.57
- c.C 1.28
- d.C 2.57✓
Cut or fill = hub elevation - design grade = 251.07 - 248.50 = +2.57 ft. The ground is above grade, so material must be removed: a cut of 2.57 ft. Reversing C and F is the costly mistake, since the contractor grades the wrong way.
A grade stake is set where the ground (top of hub) elevation is 63.90 ft. The design finished grade at that point is 67.15 ft. What should be marked on the stake?
- a.F 3.25✓
- b.C 3.25
- c.C 6.50
- d.F 1.63
Cut or fill = hub elevation - design grade = 63.90 - 67.15 = -3.25 ft. The ground is below grade, so material must be added: a fill of 3.25 ft. Reversing C and F is the costly mistake, since the contractor grades the wrong way.
A grade stake is set where the ground (top of hub) elevation is 312.44 ft. The design finished grade at that point is 312.94 ft. What should be marked on the stake?
- a.C 1.00
- b.C 0.50
- c.F 0.25
- d.F 0.50✓
Cut or fill = hub elevation - design grade = 312.44 - 312.94 = -0.50 ft. The ground is below grade, so material must be added: a fill of 0.50 ft. Reversing C and F is the costly mistake, since the contractor grades the wrong way.
A level has a height of instrument of 108.45 ft. What rod reading (grade rod) corresponds to a design grade of 101.30 ft?
- a.3.58 ft
- b.6.15 ft
- c.7.15 ft✓
- d.7.75 ft
Grade rod = HI - design elevation = 108.45 - 101.30 = 7.15 ft. When the rod reads this value its foot is exactly at grade; cut or fill at a stake is then the grade rod minus the ground rod reading.
A level has a height of instrument of 95.20 ft. What rod reading (grade rod) corresponds to a design grade of 92.75 ft?
- a.1.23 ft
- b.1.45 ft
- c.1.96 ft
- d.2.45 ft✓
Grade rod = HI - design elevation = 95.20 - 92.75 = 2.45 ft. When the rod reads this value its foot is exactly at grade; cut or fill at a stake is then the grade rod minus the ground rod reading.
A level has a height of instrument of 256.31 ft. What rod reading (grade rod) corresponds to a design grade of 248.50 ft?
- a.3.91 ft
- b.6.81 ft
- c.7.81 ft✓
- d.8.81 ft
Grade rod = HI - design elevation = 256.31 - 248.50 = 7.81 ft. When the rod reads this value its foot is exactly at grade; cut or fill at a stake is then the grade rod minus the ground rod reading.
A level has a height of instrument of 71.08 ft. What rod reading (grade rod) corresponds to a design grade of 67.15 ft?
- a.3.93 ft✓
- b.4.23 ft
- c.4.91 ft
- d.4.93 ft
Grade rod = HI - design elevation = 71.08 - 67.15 = 3.93 ft. When the rod reads this value its foot is exactly at grade; cut or fill at a stake is then the grade rod minus the ground rod reading.
With HI = 108.45 ft and a design grade of 101.30 ft, the rod reads 4.60 ft on the ground at a stake. What cut or fill applies?
- a.F 4.60
- b.F 2.55
- c.C 2.55✓
- d.C 7.15
Grade rod = 108.45 - 101.30 = 7.15 ft. Grade rod - ground rod = 7.15 - 4.60 = +2.55 ft. A positive result means the ground is above grade (cut); here the answer is C 2.55. Equivalent check: ground elevation = 103.85 ft versus grade 101.30 ft.
With HI = 95.20 ft and a design grade of 92.75 ft, the rod reads 5.85 ft on the ground at a stake. What cut or fill applies?
- a.C 5.85
- b.F 3.40✓
- c.C 3.40
- d.F 2.45
Grade rod = 95.20 - 92.75 = 2.45 ft. Grade rod - ground rod = 2.45 - 5.85 = -3.40 ft. A positive result means the ground is above grade (fill); here the answer is F 3.40. Equivalent check: ground elevation = 89.35 ft versus grade 92.75 ft.
With HI = 256.31 ft and a design grade of 248.50 ft, the rod reads 3.12 ft on the ground at a stake. What cut or fill applies?
- a.C 7.81
- b.C 4.69✓
- c.F 3.12
- d.F 4.69
Grade rod = 256.31 - 248.50 = 7.81 ft. Grade rod - ground rod = 7.81 - 3.12 = +4.69 ft. A positive result means the ground is above grade (cut); here the answer is C 4.69. Equivalent check: ground elevation = 253.19 ft versus grade 248.50 ft.
A curb flow line is at elevation 125.40 ft at station 10+00.00 and runs at a constant grade of +1.5%. What is the design elevation at station 12+75.00?
- a.121.28 ft
- b.129.53 ft✓
- c.130.03 ft
- d.133.65 ft
Elevation = starting elevation + grade x distance = 125.40 + (1.5/100)(275) = 129.53 ft. Applying the grade with the wrong sign gives 121.28 ft; a negative grade falls in the direction of increasing stations.
A curb flow line is at elevation 88.60 ft at station 22+50.00 and runs at a constant grade of -2.25%. What is the design elevation at station 24+10.00?
- a.81.40 ft
- b.85.00 ft✓
- c.85.50 ft
- d.92.20 ft
Elevation = starting elevation + grade x distance = 88.60 + (-2.25/100)(160) = 85.00 ft. Applying the grade with the wrong sign gives 92.20 ft; a negative grade falls in the direction of increasing stations.
A curb flow line is at elevation 310.00 ft at station 5+00.00 and runs at a constant grade of +0.75%. What is the design elevation at station 8+60.00?
- a.307.30 ft
- b.312.70 ft✓
- c.313.20 ft
- d.315.40 ft
Elevation = starting elevation + grade x distance = 310.00 + (0.75/100)(360) = 312.70 ft. Applying the grade with the wrong sign gives 307.30 ft; a negative grade falls in the direction of increasing stations.
A curb flow line is at elevation 52.18 ft at station 43+00.00 and runs at a constant grade of -0.5%. What is the design elevation at station 46+50.00?
- a.40.34 ft
- b.48.68 ft
- c.50.43 ft✓
- d.53.93 ft
Elevation = starting elevation + grade x distance = 52.18 + (-0.5/100)(350) = 50.43 ft. Applying the grade with the wrong sign gives 53.93 ft; a negative grade falls in the direction of increasing stations.
A gravity sewer has an invert elevation of 96.40 ft at an upstream manhole at station 10+00.00 and falls at 0.5% toward a downstream manhole at station 13+20.00. What is the invert elevation at the downstream manhole?
- a.94.80 ft✓
- b.95.60 ft
- c.96.24 ft
- d.98.00 ft
Fall = slope x length = (0.5/100) x 320 ft = 1.60 ft. Downstream invert = 96.40 - 1.60 = 94.80 ft. Adding the fall would make the pipe run uphill.
A gravity sewer has an invert elevation of 214.85 ft at an upstream manhole at station 3+00.00 and falls at 2% toward a downstream manhole at station 4+75.00. What is the invert elevation at the downstream manhole?
- a.207.85 ft
- b.211.35 ft✓
- c.213.10 ft
- d.218.35 ft
Fall = slope x length = (2/100) x 175 ft = 3.50 ft. Downstream invert = 214.85 - 3.50 = 211.35 ft. Adding the fall would make the pipe run uphill.
A gravity sewer has an invert elevation of 45.10 ft at an upstream manhole at station 15+00.00 and falls at 0.35% toward a downstream manhole at station 19+00.00. What is the invert elevation at the downstream manhole?
- a.29.28 ft
- b.34.96 ft
- c.42.30 ft
- d.43.70 ft✓
Fall = slope x length = (0.35/100) x 400 ft = 1.40 ft. Downstream invert = 45.10 - 1.40 = 43.70 ft. Adding the fall would make the pipe run uphill.
A roadway cut section has a hinge point 20 ft from centerline. The cut slope is 2:1 (horizontal:vertical), and the ground at the catch point is 6.0 ft above the hinge point elevation. Assuming this is the final trial position, how far from centerline is the slope stake (catch point)?
- a.23.0 ft
- b.32.0 ft✓
- c.40.0 ft
- d.46.0 ft
Horizontal distance on the slope = height x slope ratio = 6.0 x 2 = 12.0 ft. Catch point = hinge offset + slope distance = 20 + 12.0 = 32.0 ft from centerline. Dividing by the slope ratio treats the slope as vertical:horizontal, and leaving out the hinge offset measures from the wrong origin.
A roadway cut section has a hinge point 16 ft from centerline. The cut slope is 1.5:1 (horizontal:vertical), and the ground at the catch point is 9.5 ft above the hinge point elevation. Assuming this is the final trial position, how far from centerline is the slope stake (catch point)?
- a.14.2 ft
- b.22.3 ft
- c.25.5 ft
- d.30.2 ft✓
Horizontal distance on the slope = height x slope ratio = 9.5 x 1.5 = 14.2 ft. Catch point = hinge offset + slope distance = 16 + 14.2 = 30.2 ft from centerline. Dividing by the slope ratio treats the slope as vertical:horizontal, and leaving out the hinge offset measures from the wrong origin.
A roadway cut section has a hinge point 30 ft from centerline. The cut slope is 3:1 (horizontal:vertical), and the ground at the catch point is 4.2 ft above the hinge point elevation. Assuming this is the final trial position, how far from centerline is the slope stake (catch point)?
- a.31.4 ft
- b.42.6 ft✓
- c.53.2 ft
- d.94.2 ft
Horizontal distance on the slope = height x slope ratio = 4.2 x 3 = 12.6 ft. Catch point = hinge offset + slope distance = 30 + 12.6 = 42.6 ft from centerline. Dividing by the slope ratio treats the slope as vertical:horizontal, and leaving out the hinge offset measures from the wrong origin.
A roadway cut section has a hinge point 24 ft from centerline. The cut slope is 2:1 (horizontal:vertical), and the ground at the catch point is 12.0 ft above the hinge point elevation. Assuming this is the final trial position, how far from centerline is the slope stake (catch point)?
- a.24.0 ft
- b.30.0 ft
- c.36.0 ft
- d.48.0 ft✓
Horizontal distance on the slope = height x slope ratio = 12.0 x 2 = 24.0 ft. Catch point = hinge offset + slope distance = 24 + 24.0 = 48.0 ft from centerline. Dividing by the slope ratio treats the slope as vertical:horizontal, and leaving out the hinge offset measures from the wrong origin.
A fill section has its shoulder (hinge point) 22 ft from centerline. The fill slope is 2:1 (H:V) and the existing ground at the toe of fill is 5.0 ft below the hinge point. How far from centerline is the toe-of-fill slope stake?
- a.12.0 ft
- b.24.5 ft
- c.32.0 ft✓
- d.42.0 ft
The slope travels 2 ft horizontally for every foot of height: 5.0 x 2 = 10.0 ft beyond the hinge. Toe = 22 + 10.0 = 32.0 ft from centerline. In the field this is found by trial, because the ground elevation at the catch point is not known until the rod is there.
A fill section has its shoulder (hinge point) 18 ft from centerline. The fill slope is 4:1 (H:V) and the existing ground at the toe of fill is 8.4 ft below the hinge point. How far from centerline is the toe-of-fill slope stake?
- a.20.1 ft
- b.33.6 ft
- c.51.6 ft✓
- d.85.2 ft
The slope travels 4 ft horizontally for every foot of height: 8.4 x 4 = 33.6 ft beyond the hinge. Toe = 18 + 33.6 = 51.6 ft from centerline. In the field this is found by trial, because the ground elevation at the catch point is not known until the rod is there.
A fill section has its shoulder (hinge point) 26 ft from centerline. The fill slope is 1.5:1 (H:V) and the existing ground at the toe of fill is 3.5 ft below the hinge point. How far from centerline is the toe-of-fill slope stake?
- a.20.8 ft
- b.28.3 ft
- c.31.2 ft✓
- d.36.5 ft
The slope travels 1.5 ft horizontally for every foot of height: 3.5 x 1.5 = 5.2 ft beyond the hinge. Toe = 26 + 5.2 = 31.2 ft from centerline. In the field this is found by trial, because the ground elevation at the catch point is not known until the rod is there.
The design centerline grade is 100.00 ft and the pavement falls at a 2% cross slope to the edge of pavement 25 ft from centerline. An offset hub near the edge has a top elevation of 101.85 ft. What cut or fill to the edge-of-pavement grade is marked on the stake?
- a.C 2.35✓
- b.C 1.85
- c.F 2.35
- d.C 3.35
Edge-of-pavement grade = centerline grade - cross slope x offset = 100.00 - (2/100)(25) = 99.50 ft. Hub - grade = 101.85 - 99.50 = +2.35 ft, so the stake reads C 2.35. Comparing the hub with the centerline grade ignores the crown.
The design centerline grade is 250.40 ft and the pavement falls at a 2% cross slope to the edge of pavement 30 ft from centerline. An offset hub near the edge has a top elevation of 248.90 ft. What cut or fill to the edge-of-pavement grade is marked on the stake?
- a.F 0.90✓
- b.C 0.90
- c.F 2.10
- d.F 1.50
Edge-of-pavement grade = centerline grade - cross slope x offset = 250.40 - (2/100)(30) = 249.80 ft. Hub - grade = 248.90 - 249.80 = -0.90 ft, so the stake reads F 0.90. Comparing the hub with the centerline grade ignores the crown.
The design centerline grade is 75.60 ft and the pavement falls at a 1.5% cross slope to the edge of pavement 20 ft from centerline. An offset hub near the edge has a top elevation of 77.10 ft. What cut or fill to the edge-of-pavement grade is marked on the stake?
- a.C 1.80✓
- b.C 1.50
- c.C 2.40
- d.F 1.80
Edge-of-pavement grade = centerline grade - cross slope x offset = 75.60 - (1.5/100)(20) = 75.30 ft. Hub - grade = 77.10 - 75.30 = +1.80 ft, so the stake reads C 1.80. Comparing the hub with the centerline grade ignores the crown.
Cut end areas at successive cross-sections spaced 50 ft apart are 0, 85, 140, 60 sq ft. Using the average end area method, what is the total excavation volume?
- a.132 cu yd
- b.472 cu yd✓
- c.528 cu yd
- d.1,417 cu yd
Sum the prisms between adjacent sections: V = L x sum[(Ai + Ai+1)/2] = 12,750 cu ft = 472 cu yd. Multiplying the sum of all areas by the spacing counts interior sections twice at full weight and end sections at full instead of half weight.
Cut end areas at successive cross-sections spaced 100 ft apart are 210, 260, 190 sq ft. Using the average end area method, what is the total excavation volume?
- a.815 cu yd
- b.1,363 cu yd
- c.1,704 cu yd✓
- d.2,444 cu yd
Sum the prisms between adjacent sections: V = L x sum[(Ai + Ai+1)/2] = 46,000 cu ft = 1,704 cu yd. Multiplying the sum of all areas by the spacing counts interior sections twice at full weight and end sections at full instead of half weight.
Cut end areas at successive cross-sections spaced 25 ft apart are 45, 120, 95, 30, 0 sq ft. Using the average end area method, what is the total excavation volume?
- a.248 cu yd✓
- b.269 cu yd
- c.495 cu yd
- d.743 cu yd
Sum the prisms between adjacent sections: V = L x sum[(Ai + Ai+1)/2] = 6,688 cu ft = 248 cu yd. Multiplying the sum of all areas by the spacing counts interior sections twice at full weight and end sections at full instead of half weight.
A cut contains 1,200 bank cubic yards of soil with a swell of 25% and a shrinkage of 10% (bank to compacted). How many loose cubic yards must be hauled?
- a.1,500 LCY✓
- b.1,600 LCY
- c.1,875 LCY
- d.2,250 LCY
Loose volume = bank volume x (1 + swell) = 1,200 x 1.25 = 1,500 LCY. Shrinkage (10%) describes the reduction from bank to compacted volume (1,080 CCY) and applies to embankment quantities, not to haul.
A cut contains 850 bank cubic yards of soil with a swell of 30% and a shrinkage of 15% (bank to compacted). How many loose cubic yards must be hauled?
- a.722 LCY
- b.850 LCY
- c.1,105 LCY✓
- d.1,214 LCY
Loose volume = bank volume x (1 + swell) = 850 x 1.30 = 1,105 LCY. Shrinkage (15%) describes the reduction from bank to compacted volume (722 CCY) and applies to embankment quantities, not to haul.
A cut contains 5,000 bank cubic yards of soil with a swell of 20% and a shrinkage of 12% (bank to compacted). How many loose cubic yards must be hauled?
- a.4,400 LCY
- b.6,000 LCY✓
- c.6,250 LCY
- d.7,500 LCY
Loose volume = bank volume x (1 + swell) = 5,000 x 1.20 = 6,000 LCY. Shrinkage (12%) describes the reduction from bank to compacted volume (4,400 CCY) and applies to embankment quantities, not to haul.
A curve with R = 500 ft is staked at 50-ft arc intervals from the PC. What chord length is measured between successive stakes?
- a.49.94 ft
- b.49.98 ft✓
- c.50.00 ft
- d.99.83 ft
The deflection angle per 50-ft arc is 50/(2 x 500) rad = 2.8648°. Chord = 2R sin(deflection) = 2 x 500 x sin(2.8648°) = 49.98 ft, slightly shorter than the 50-ft arc. On sharp curves taping the arc length as if it were a chord accumulates error around the curve.
A curve with R = 800 ft is staked at 100-ft arc intervals from the PC. What chord length is measured between successive stakes?
- a.99.93 ft✓
- b.100.00 ft
- c.124.92 ft
- d.199.48 ft
The deflection angle per 100-ft arc is 100/(2 x 800) rad = 3.5810°. Chord = 2R sin(deflection) = 2 x 800 x sin(3.5810°) = 99.93 ft, slightly shorter than the 100-ft arc. On sharp curves taping the arc length as if it were a chord accumulates error around the curve.
A curve with R = 300 ft is staked at 25-ft arc intervals from the PC. What chord length is measured between successive stakes?
- a.24.99 ft✓
- b.25.00 ft
- c.31.24 ft
- d.49.94 ft
The deflection angle per 25-ft arc is 25/(2 x 300) rad = 2.3873°. Chord = 2R sin(deflection) = 2 x 300 x sin(2.3873°) = 24.99 ft, slightly shorter than the 25-ft arc. On sharp curves taping the arc length as if it were a chord accumulates error around the curve.
The PC of a curve is at station 12+62.37. Stakes are to be set on even 50-ft stations. What arc distance from the PC is the first stake on the curve?
- a.12.37 ft
- b.18.82 ft
- c.37.63 ft✓
- d.50.00 ft
The first even 50-ft station past the PC is 13+00.00, so the first subarc is 13+00.00 - 12+62.37 = 37.63 ft. Its deflection angle is proportionally smaller than that for a full 50-ft arc.
The PC of a curve is at station 24+18.80. Stakes are to be set on even 100-ft stations. What arc distance from the PC is the first stake on the curve?
- a.18.80 ft
- b.40.60 ft
- c.81.20 ft✓
- d.100.00 ft
The first even 100-ft station past the PC is 25+00.00, so the first subarc is 25+00.00 - 24+18.80 = 81.20 ft. Its deflection angle is proportionally smaller than that for a full 100-ft arc.
The PC of a curve is at station 8+73.15. Stakes are to be set on even 25-ft stations. What arc distance from the PC is the first stake on the curve?
- a.0.93 ft
- b.1.24 ft
- c.1.48 ft
- d.1.85 ft✓
The first even 25-ft station past the PC is 8+75.00, so the first subarc is 8+75.00 - 8+73.15 = 1.85 ft. Its deflection angle is proportionally smaller than that for a full 25-ft arc.
To check that a building corner is square, a surveyor measures 30 ft along one building line and 40 ft along the other. What diagonal between those two points confirms a 90° corner?
- a.35.00 ft
- b.40.00 ft
- c.49.00 ft
- d.50.00 ft✓
By the Pythagorean theorem the diagonal must be sqrt(30^2 + 40^2) = 50.00 ft. Any other diagonal means the corner is not square; for a full rectangle, equal diagonals confirm squareness.
To check that a building corner is square, a surveyor measures 20 ft along one building line and 21 ft along the other. What diagonal between those two points confirms a 90° corner?
- a.20.50 ft
- b.23.20 ft
- c.28.00 ft
- d.29.00 ft✓
By the Pythagorean theorem the diagonal must be sqrt(20^2 + 21^2) = 29.00 ft. Any other diagonal means the corner is not square; for a full rectangle, equal diagonals confirm squareness.
To check that a building corner is square, a surveyor measures 60 ft along one building line and 80 ft along the other. What diagonal between those two points confirms a 90° corner?
- a.70.00 ft
- b.99.00 ft
- c.100.00 ft✓
- d.140.00 ft
By the Pythagorean theorem the diagonal must be sqrt(60^2 + 80^2) = 100.00 ft. Any other diagonal means the corner is not square; for a full rectangle, equal diagonals confirm squareness.
A swale must drain from a high point at elevation 104.20 ft to an inlet at elevation 103.00 ft, 60 ft away. What slope will the swale have?
- a.2.00%✓
- b.2.50%
- c.4.00%
- d.5.00%
Slope = fall/length = (104.20 - 103.00)/60 = 0.0200 = 2.00%. Checking drainage slopes against the minimum required by the plans is a routine part of grade staking.
A swale must drain from a high point at elevation 58.75 ft to an inlet at elevation 57.25 ft, 100 ft away. What slope will the swale have?
- a.1.50%✓
- b.1.88%
- c.3.00%
- d.6.67%
Slope = fall/length = (58.75 - 57.25)/100 = 0.0150 = 1.50%. Checking drainage slopes against the minimum required by the plans is a routine part of grade staking.
A swale must drain from a high point at elevation 212.40 ft to an inlet at elevation 211.80 ft, 40 ft away. What slope will the swale have?
- a.0.15%
- b.1.50%✓
- c.3.00%
- d.6.67%
Slope = fall/length = (212.40 - 211.80)/40 = 0.0150 = 1.50%. Checking drainage slopes against the minimum required by the plans is a routine part of grade staking.
Why are construction stakes commonly set on an offset line instead of at the exact location of the work?
- a.So the contractor can decide in the field where the work should finally go
- b.So the survey meets a lower standard of accuracy than the plans require
- c.So the stakes can be set by the crew without reference to project control
- d.So the stakes survive excavation and the points can be re-established from them✓
A stake at the true location would be destroyed by the first pass of equipment. An offset stake (for example 5 ft from a curb face) stays clear of the work and carries the offset distance and cut or fill to grade. Accuracy requirements are unchanged and stakes still derive from control.
A stake is marked '5' O/S FC, C 1.25'. What does it tell the contractor?
- a.The curb face is 5 ft high; the cut slope is 1.25 horizontal to 1 vertical
- b.The stake is 5 ft from the face of curb; grade is 1.25 ft above the hub
- c.The stake is 1.25 ft from the face of curb; grade is 5 ft below the hub
- d.The stake is 5 ft from the face of curb; grade is 1.25 ft below the hub✓
O/S is the offset distance from the feature named (FC, face of curb). C means cut: measure down from the reference point on the stake to design grade. F would mean fill, measuring up. Reading cut as 'above' builds the work at the wrong elevation.
What is a hinge point on a roadway cross-section?
- a.The point where the roadbed template meets the start of the cut or fill slope✓
- b.The point on the centerline at which the profile grade changes its slope
- c.The point at which a horizontal curve begins along the roadway centerline
- d.The point where the cut or fill slope finally meets the existing ground
The hinge point is the outer edge of the graded template from which the side slope departs. The point where that slope meets natural ground is the catch point, where the slope stake is set. A change in profile grade is a grade break or PVI, and a curve begins at the PC.