With HI = 95.20 ft and a design grade of 92.75 ft, the rod reads 5.85 ft on the ground at a stake. What cut or fill applies?

  • a.C 5.85
  • b.F 3.40✓
  • c.C 3.40
  • d.F 2.45

Grade rod = 95.20 - 92.75 = 2.45 ft. Grade rod - ground rod = 2.45 - 5.85 = -3.40 ft. A positive result means the ground is above grade (fill); here the answer is F 3.40. Equivalent check: ground elevation = 89.35 ft versus grade 92.75 ft.

Construction Surveying

With HI = 256.31 ft and a design grade of 248.50 ft, the rod reads 3.12 ft on the ground at a stake. What cut or fill applies?

  • a.C 7.81
  • b.C 4.69✓
  • c.F 3.12
  • d.F 4.69

Grade rod = 256.31 - 248.50 = 7.81 ft. Grade rod - ground rod = 7.81 - 3.12 = +4.69 ft. A positive result means the ground is above grade (cut); here the answer is C 4.69. Equivalent check: ground elevation = 253.19 ft versus grade 248.50 ft.

Construction Surveying

A curb flow line is at elevation 125.40 ft at station 10+00.00 and runs at a constant grade of +1.5%. What is the design elevation at station 12+75.00?

  • a.121.28 ft
  • b.129.53 ft✓
  • c.130.03 ft
  • d.133.65 ft

Elevation = starting elevation + grade x distance = 125.40 + (1.5/100)(275) = 129.53 ft. Applying the grade with the wrong sign gives 121.28 ft; a negative grade falls in the direction of increasing stations.

Construction Surveying

A curb flow line is at elevation 88.60 ft at station 22+50.00 and runs at a constant grade of -2.25%. What is the design elevation at station 24+10.00?

  • a.81.40 ft
  • b.85.00 ft✓
  • c.85.50 ft
  • d.92.20 ft

Elevation = starting elevation + grade x distance = 88.60 + (-2.25/100)(160) = 85.00 ft. Applying the grade with the wrong sign gives 92.20 ft; a negative grade falls in the direction of increasing stations.

Construction Surveying

A curb flow line is at elevation 310.00 ft at station 5+00.00 and runs at a constant grade of +0.75%. What is the design elevation at station 8+60.00?

  • a.307.30 ft
  • b.312.70 ft✓
  • c.313.20 ft
  • d.315.40 ft

Elevation = starting elevation + grade x distance = 310.00 + (0.75/100)(360) = 312.70 ft. Applying the grade with the wrong sign gives 307.30 ft; a negative grade falls in the direction of increasing stations.

Construction Surveying

A curb flow line is at elevation 52.18 ft at station 43+00.00 and runs at a constant grade of -0.5%. What is the design elevation at station 46+50.00?

  • a.40.34 ft
  • b.48.68 ft
  • c.50.43 ft✓
  • d.53.93 ft

Elevation = starting elevation + grade x distance = 52.18 + (-0.5/100)(350) = 50.43 ft. Applying the grade with the wrong sign gives 53.93 ft; a negative grade falls in the direction of increasing stations.

Construction Surveying

A gravity sewer has an invert elevation of 96.40 ft at an upstream manhole at station 10+00.00 and falls at 0.5% toward a downstream manhole at station 13+20.00. What is the invert elevation at the downstream manhole?

  • a.94.80 ft✓
  • b.95.60 ft
  • c.96.24 ft
  • d.98.00 ft

Fall = slope x length = (0.5/100) x 320 ft = 1.60 ft. Downstream invert = 96.40 - 1.60 = 94.80 ft. Adding the fall would make the pipe run uphill.

Construction Surveying

A gravity sewer has an invert elevation of 214.85 ft at an upstream manhole at station 3+00.00 and falls at 2% toward a downstream manhole at station 4+75.00. What is the invert elevation at the downstream manhole?

  • a.207.85 ft
  • b.211.35 ft✓
  • c.213.10 ft
  • d.218.35 ft

Fall = slope x length = (2/100) x 175 ft = 3.50 ft. Downstream invert = 214.85 - 3.50 = 211.35 ft. Adding the fall would make the pipe run uphill.

Construction Surveying

A gravity sewer has an invert elevation of 45.10 ft at an upstream manhole at station 15+00.00 and falls at 0.35% toward a downstream manhole at station 19+00.00. What is the invert elevation at the downstream manhole?

  • a.29.28 ft
  • b.34.96 ft
  • c.42.30 ft
  • d.43.70 ft✓

Fall = slope x length = (0.35/100) x 400 ft = 1.40 ft. Downstream invert = 45.10 - 1.40 = 43.70 ft. Adding the fall would make the pipe run uphill.

Construction Surveying

A roadway cut section has a hinge point 20 ft from centerline. The cut slope is 2:1 (horizontal:vertical), and the ground at the catch point is 6.0 ft above the hinge point elevation. Assuming this is the final trial position, how far from centerline is the slope stake (catch point)?

  • a.23.0 ft
  • b.32.0 ft✓
  • c.40.0 ft
  • d.46.0 ft

Horizontal distance on the slope = height x slope ratio = 6.0 x 2 = 12.0 ft. Catch point = hinge offset + slope distance = 20 + 12.0 = 32.0 ft from centerline. Dividing by the slope ratio treats the slope as vertical:horizontal, and leaving out the hinge offset measures from the wrong origin.

Construction Surveying

A roadway cut section has a hinge point 16 ft from centerline. The cut slope is 1.5:1 (horizontal:vertical), and the ground at the catch point is 9.5 ft above the hinge point elevation. Assuming this is the final trial position, how far from centerline is the slope stake (catch point)?

  • a.14.2 ft
  • b.22.3 ft
  • c.25.5 ft
  • d.30.2 ft✓

Horizontal distance on the slope = height x slope ratio = 9.5 x 1.5 = 14.2 ft. Catch point = hinge offset + slope distance = 16 + 14.2 = 30.2 ft from centerline. Dividing by the slope ratio treats the slope as vertical:horizontal, and leaving out the hinge offset measures from the wrong origin.

Construction Surveying

A roadway cut section has a hinge point 30 ft from centerline. The cut slope is 3:1 (horizontal:vertical), and the ground at the catch point is 4.2 ft above the hinge point elevation. Assuming this is the final trial position, how far from centerline is the slope stake (catch point)?

  • a.31.4 ft
  • b.42.6 ft✓
  • c.53.2 ft
  • d.94.2 ft

Horizontal distance on the slope = height x slope ratio = 4.2 x 3 = 12.6 ft. Catch point = hinge offset + slope distance = 30 + 12.6 = 42.6 ft from centerline. Dividing by the slope ratio treats the slope as vertical:horizontal, and leaving out the hinge offset measures from the wrong origin.

Construction Surveying

A roadway cut section has a hinge point 24 ft from centerline. The cut slope is 2:1 (horizontal:vertical), and the ground at the catch point is 12.0 ft above the hinge point elevation. Assuming this is the final trial position, how far from centerline is the slope stake (catch point)?

  • a.24.0 ft
  • b.30.0 ft
  • c.36.0 ft
  • d.48.0 ft✓

Horizontal distance on the slope = height x slope ratio = 12.0 x 2 = 24.0 ft. Catch point = hinge offset + slope distance = 24 + 24.0 = 48.0 ft from centerline. Dividing by the slope ratio treats the slope as vertical:horizontal, and leaving out the hinge offset measures from the wrong origin.

Construction Surveying

A fill section has its shoulder (hinge point) 22 ft from centerline. The fill slope is 2:1 (H:V) and the existing ground at the toe of fill is 5.0 ft below the hinge point. How far from centerline is the toe-of-fill slope stake?

  • a.12.0 ft
  • b.24.5 ft
  • c.32.0 ft✓
  • d.42.0 ft

The slope travels 2 ft horizontally for every foot of height: 5.0 x 2 = 10.0 ft beyond the hinge. Toe = 22 + 10.0 = 32.0 ft from centerline. In the field this is found by trial, because the ground elevation at the catch point is not known until the rod is there.

Construction Surveying

A fill section has its shoulder (hinge point) 18 ft from centerline. The fill slope is 4:1 (H:V) and the existing ground at the toe of fill is 8.4 ft below the hinge point. How far from centerline is the toe-of-fill slope stake?

  • a.20.1 ft
  • b.33.6 ft
  • c.51.6 ft✓
  • d.85.2 ft

The slope travels 4 ft horizontally for every foot of height: 8.4 x 4 = 33.6 ft beyond the hinge. Toe = 18 + 33.6 = 51.6 ft from centerline. In the field this is found by trial, because the ground elevation at the catch point is not known until the rod is there.

Construction Surveying

A fill section has its shoulder (hinge point) 26 ft from centerline. The fill slope is 1.5:1 (H:V) and the existing ground at the toe of fill is 3.5 ft below the hinge point. How far from centerline is the toe-of-fill slope stake?

  • a.20.8 ft
  • b.28.3 ft
  • c.31.2 ft✓
  • d.36.5 ft

The slope travels 1.5 ft horizontally for every foot of height: 3.5 x 1.5 = 5.2 ft beyond the hinge. Toe = 26 + 5.2 = 31.2 ft from centerline. In the field this is found by trial, because the ground elevation at the catch point is not known until the rod is there.

Construction Surveying

The design centerline grade is 100.00 ft and the pavement falls at a 2% cross slope to the edge of pavement 25 ft from centerline. An offset hub near the edge has a top elevation of 101.85 ft. What cut or fill to the edge-of-pavement grade is marked on the stake?

  • a.C 2.35✓
  • b.C 1.85
  • c.F 2.35
  • d.C 3.35

Edge-of-pavement grade = centerline grade - cross slope x offset = 100.00 - (2/100)(25) = 99.50 ft. Hub - grade = 101.85 - 99.50 = +2.35 ft, so the stake reads C 2.35. Comparing the hub with the centerline grade ignores the crown.

Construction Surveying

The design centerline grade is 250.40 ft and the pavement falls at a 2% cross slope to the edge of pavement 30 ft from centerline. An offset hub near the edge has a top elevation of 248.90 ft. What cut or fill to the edge-of-pavement grade is marked on the stake?

  • a.F 0.90✓
  • b.C 0.90
  • c.F 2.10
  • d.F 1.50

Edge-of-pavement grade = centerline grade - cross slope x offset = 250.40 - (2/100)(30) = 249.80 ft. Hub - grade = 248.90 - 249.80 = -0.90 ft, so the stake reads F 0.90. Comparing the hub with the centerline grade ignores the crown.

Construction Surveying

The design centerline grade is 75.60 ft and the pavement falls at a 1.5% cross slope to the edge of pavement 20 ft from centerline. An offset hub near the edge has a top elevation of 77.10 ft. What cut or fill to the edge-of-pavement grade is marked on the stake?

  • a.C 1.80✓
  • b.C 1.50
  • c.C 2.40
  • d.F 1.80

Edge-of-pavement grade = centerline grade - cross slope x offset = 75.60 - (1.5/100)(20) = 75.30 ft. Hub - grade = 77.10 - 75.30 = +1.80 ft, so the stake reads C 1.80. Comparing the hub with the centerline grade ignores the crown.

Construction Surveying

Cut end areas at successive cross-sections spaced 50 ft apart are 0, 85, 140, 60 sq ft. Using the average end area method, what is the total excavation volume?

  • a.132 cu yd
  • b.472 cu yd✓
  • c.528 cu yd
  • d.1,417 cu yd

Sum the prisms between adjacent sections: V = L x sum[(Ai + Ai+1)/2] = 12,750 cu ft = 472 cu yd. Multiplying the sum of all areas by the spacing counts interior sections twice at full weight and end sections at full instead of half weight.

Construction Surveying

Cut end areas at successive cross-sections spaced 100 ft apart are 210, 260, 190 sq ft. Using the average end area method, what is the total excavation volume?

  • a.815 cu yd
  • b.1,363 cu yd
  • c.1,704 cu yd✓
  • d.2,444 cu yd

Sum the prisms between adjacent sections: V = L x sum[(Ai + Ai+1)/2] = 46,000 cu ft = 1,704 cu yd. Multiplying the sum of all areas by the spacing counts interior sections twice at full weight and end sections at full instead of half weight.

Construction Surveying

Cut end areas at successive cross-sections spaced 25 ft apart are 45, 120, 95, 30, 0 sq ft. Using the average end area method, what is the total excavation volume?

  • a.248 cu yd✓
  • b.269 cu yd
  • c.495 cu yd
  • d.743 cu yd

Sum the prisms between adjacent sections: V = L x sum[(Ai + Ai+1)/2] = 6,688 cu ft = 248 cu yd. Multiplying the sum of all areas by the spacing counts interior sections twice at full weight and end sections at full instead of half weight.

Construction Surveying

A cut contains 1,200 bank cubic yards of soil with a swell of 25% and a shrinkage of 10% (bank to compacted). How many loose cubic yards must be hauled?

  • a.1,500 LCY✓
  • b.1,600 LCY
  • c.1,875 LCY
  • d.2,250 LCY

Loose volume = bank volume x (1 + swell) = 1,200 x 1.25 = 1,500 LCY. Shrinkage (10%) describes the reduction from bank to compacted volume (1,080 CCY) and applies to embankment quantities, not to haul.

Construction Surveying

A cut contains 850 bank cubic yards of soil with a swell of 30% and a shrinkage of 15% (bank to compacted). How many loose cubic yards must be hauled?

  • a.722 LCY
  • b.850 LCY
  • c.1,105 LCY✓
  • d.1,214 LCY

Loose volume = bank volume x (1 + swell) = 850 x 1.30 = 1,105 LCY. Shrinkage (15%) describes the reduction from bank to compacted volume (722 CCY) and applies to embankment quantities, not to haul.

Construction Surveying

A cut contains 5,000 bank cubic yards of soil with a swell of 20% and a shrinkage of 12% (bank to compacted). How many loose cubic yards must be hauled?

  • a.4,400 LCY
  • b.6,000 LCY✓
  • c.6,250 LCY
  • d.7,500 LCY

Loose volume = bank volume x (1 + swell) = 5,000 x 1.20 = 6,000 LCY. Shrinkage (12%) describes the reduction from bank to compacted volume (4,400 CCY) and applies to embankment quantities, not to haul.

Construction Surveying

A curve with R = 500 ft is staked at 50-ft arc intervals from the PC. What chord length is measured between successive stakes?

  • a.49.94 ft
  • b.49.98 ft✓
  • c.50.00 ft
  • d.99.83 ft

The deflection angle per 50-ft arc is 50/(2 x 500) rad = 2.8648°. Chord = 2R sin(deflection) = 2 x 500 x sin(2.8648°) = 49.98 ft, slightly shorter than the 50-ft arc. On sharp curves taping the arc length as if it were a chord accumulates error around the curve.

Construction Surveying

A curve with R = 800 ft is staked at 100-ft arc intervals from the PC. What chord length is measured between successive stakes?

  • a.99.93 ft✓
  • b.100.00 ft
  • c.124.92 ft
  • d.199.48 ft

The deflection angle per 100-ft arc is 100/(2 x 800) rad = 3.5810°. Chord = 2R sin(deflection) = 2 x 800 x sin(3.5810°) = 99.93 ft, slightly shorter than the 100-ft arc. On sharp curves taping the arc length as if it were a chord accumulates error around the curve.

Construction Surveying

A curve with R = 300 ft is staked at 25-ft arc intervals from the PC. What chord length is measured between successive stakes?

  • a.24.99 ft✓
  • b.25.00 ft
  • c.31.24 ft
  • d.49.94 ft

The deflection angle per 25-ft arc is 25/(2 x 300) rad = 2.3873°. Chord = 2R sin(deflection) = 2 x 300 x sin(2.3873°) = 24.99 ft, slightly shorter than the 25-ft arc. On sharp curves taping the arc length as if it were a chord accumulates error around the curve.

Construction Surveying

The PC of a curve is at station 12+62.37. Stakes are to be set on even 50-ft stations. What arc distance from the PC is the first stake on the curve?

  • a.12.37 ft
  • b.18.82 ft
  • c.37.63 ft✓
  • d.50.00 ft

The first even 50-ft station past the PC is 13+00.00, so the first subarc is 13+00.00 - 12+62.37 = 37.63 ft. Its deflection angle is proportionally smaller than that for a full 50-ft arc.

Construction Surveying

The PC of a curve is at station 24+18.80. Stakes are to be set on even 100-ft stations. What arc distance from the PC is the first stake on the curve?

  • a.18.80 ft
  • b.40.60 ft
  • c.81.20 ft✓
  • d.100.00 ft

The first even 100-ft station past the PC is 25+00.00, so the first subarc is 25+00.00 - 24+18.80 = 81.20 ft. Its deflection angle is proportionally smaller than that for a full 100-ft arc.

Construction Surveying

The PC of a curve is at station 8+73.15. Stakes are to be set on even 25-ft stations. What arc distance from the PC is the first stake on the curve?

  • a.0.93 ft
  • b.1.24 ft
  • c.1.48 ft
  • d.1.85 ft✓

The first even 25-ft station past the PC is 8+75.00, so the first subarc is 8+75.00 - 8+73.15 = 1.85 ft. Its deflection angle is proportionally smaller than that for a full 25-ft arc.

Construction Surveying

To check that a building corner is square, a surveyor measures 30 ft along one building line and 40 ft along the other. What diagonal between those two points confirms a 90° corner?

  • a.35.00 ft
  • b.40.00 ft
  • c.49.00 ft
  • d.50.00 ft✓

By the Pythagorean theorem the diagonal must be sqrt(30^2 + 40^2) = 50.00 ft. Any other diagonal means the corner is not square; for a full rectangle, equal diagonals confirm squareness.

Construction Surveying

To check that a building corner is square, a surveyor measures 20 ft along one building line and 21 ft along the other. What diagonal between those two points confirms a 90° corner?

  • a.20.50 ft
  • b.23.20 ft
  • c.28.00 ft
  • d.29.00 ft✓

By the Pythagorean theorem the diagonal must be sqrt(20^2 + 21^2) = 29.00 ft. Any other diagonal means the corner is not square; for a full rectangle, equal diagonals confirm squareness.

Construction Surveying

To check that a building corner is square, a surveyor measures 60 ft along one building line and 80 ft along the other. What diagonal between those two points confirms a 90° corner?

  • a.70.00 ft
  • b.99.00 ft
  • c.100.00 ft✓
  • d.140.00 ft

By the Pythagorean theorem the diagonal must be sqrt(60^2 + 80^2) = 100.00 ft. Any other diagonal means the corner is not square; for a full rectangle, equal diagonals confirm squareness.

Construction Surveying

A swale must drain from a high point at elevation 104.20 ft to an inlet at elevation 103.00 ft, 60 ft away. What slope will the swale have?

  • a.2.00%✓
  • b.2.50%
  • c.4.00%
  • d.5.00%

Slope = fall/length = (104.20 - 103.00)/60 = 0.0200 = 2.00%. Checking drainage slopes against the minimum required by the plans is a routine part of grade staking.

Construction Surveying

A swale must drain from a high point at elevation 58.75 ft to an inlet at elevation 57.25 ft, 100 ft away. What slope will the swale have?

  • a.1.50%✓
  • b.1.88%
  • c.3.00%
  • d.6.67%

Slope = fall/length = (58.75 - 57.25)/100 = 0.0150 = 1.50%. Checking drainage slopes against the minimum required by the plans is a routine part of grade staking.

Construction Surveying

A swale must drain from a high point at elevation 212.40 ft to an inlet at elevation 211.80 ft, 40 ft away. What slope will the swale have?

  • a.0.15%
  • b.1.50%✓
  • c.3.00%
  • d.6.67%

Slope = fall/length = (212.40 - 211.80)/40 = 0.0150 = 1.50%. Checking drainage slopes against the minimum required by the plans is a routine part of grade staking.

Construction Surveying

Why are construction stakes commonly set on an offset line instead of at the exact location of the work?

  • a.So the contractor can decide in the field where the work should finally go
  • b.So the survey meets a lower standard of accuracy than the plans require
  • c.So the stakes can be set by the crew without reference to project control
  • d.So the stakes survive excavation and the points can be re-established from them✓

A stake at the true location would be destroyed by the first pass of equipment. An offset stake (for example 5 ft from a curb face) stays clear of the work and carries the offset distance and cut or fill to grade. Accuracy requirements are unchanged and stakes still derive from control.

Construction Surveying

A stake is marked '5' O/S FC, C 1.25'. What does it tell the contractor?

  • a.The curb face is 5 ft high; the cut slope is 1.25 horizontal to 1 vertical
  • b.The stake is 5 ft from the face of curb; grade is 1.25 ft above the hub
  • c.The stake is 1.25 ft from the face of curb; grade is 5 ft below the hub
  • d.The stake is 5 ft from the face of curb; grade is 1.25 ft below the hub✓

O/S is the offset distance from the feature named (FC, face of curb). C means cut: measure down from the reference point on the stake to design grade. F would mean fill, measuring up. Reading cut as 'above' builds the work at the wrong elevation.

Construction Surveying

What is a hinge point on a roadway cross-section?

  • a.The point where the roadbed template meets the start of the cut or fill slope✓
  • b.The point on the centerline at which the profile grade changes its slope
  • c.The point at which a horizontal curve begins along the roadway centerline
  • d.The point where the cut or fill slope finally meets the existing ground

The hinge point is the outer edge of the graded template from which the side slope departs. The point where that slope meets natural ground is the catch point, where the slope stake is set. A change in profile grade is a grade break or PVI, and a curve begins at the PC.

Construction Surveying

Why is setting a slope stake usually a trial-and-error process in the field?

  • a.The centerline elevation changes while the stake is in the process of being set
  • b.The slope ratio of the cut or fill is not known until the grading has started
  • c.The catch point distance depends on the ground elevation at the catch point itself✓
  • d.The offset to the hinge point varies with the weather conditions on the day

The distance out equals the hinge offset plus the slope ratio times the height difference, but that height depends on the ground elevation where the rod stands. The surveyor tries a position, compares measured and computed distances, and moves until they agree.

Construction Surveying

On a stationed alignment, what does station 12+50 mean?

  • a.A point 12.50 ft along the alignment from station 0+00
  • b.A point 12 ft right and 50 ft ahead of station 0+00
  • c.A point 1,250 ft along the alignment from station 0+00✓
  • d.A point 1,250 ft at right angles to the alignment

Stationing counts distance along the alignment in 100-ft stations plus feet: 12+50 is 12 full stations and 50 ft, or 1,250 ft. Distances at right angles to the alignment are offsets, stated left or right when facing up-station.

Construction Surveying

What is a grade break in construction staking?

  • a.A point where the contractor's work stops at the end of a shift
  • b.A point where the staking offset distance changes for clearance
  • c.A point where the existing ground matches the design elevation
  • d.A point where the design slope of the surface or line changes✓

Stakes are needed at grade breaks because the contractor builds straight grades between stakes; missing one produces a surface that cuts across the designed change in slope. A point where existing and design grades coincide is a daylight or no-cut, no-fill point.

Construction Surveying

When staking a gravity sewer, which elevation is normally referenced on the stake?

  • a.The top-of-pipe (crown) elevation
  • b.The trench bedding elevation
  • c.The finished pavement elevation
  • d.The pipe invert (flow line) elevation✓

Gravity pipes are designed and built to invert grade, since the flow line controls hydraulic performance. Cuts are therefore given to invert, and the contractor allows for pipe wall thickness and bedding. Using the crown instead misplaces the pipe by its diameter.

Construction Surveying

Before staking from a set of plans, the engineer's crew checks into two control points and finds a 0.4-ft discrepancy. What should be done?

  • a.Stake from the nearer control point and ignore the other entirely
  • b.Split the difference equally among all of the stakes set that day
  • c.Resolve the control discrepancy before setting any construction stakes✓
  • d.Proceed with staking and note the discrepancy on the cut sheet

Staking from bad control transfers the error into the built work. The cause must be found first: a disturbed point, a wrong coordinate, a datum mix-up or a grid-to-ground mistake. Splitting or ignoring a 0.4-ft discrepancy hides a problem that may be much larger elsewhere.

Construction Surveying

What is the purpose of a cut sheet (grade sheet) given to the contractor?

  • a.To list each stake with its station, offset, hub elevation, design grade and cut or fill✓
  • b.To record the quantities of excavation that have been completed for a progress payment
  • c.To show the property boundary and the easements that cross the limits of the work
  • d.To certify that the completed work has been inspected and accepted by the agency

The cut sheet documents what was staked and lets the contractor and inspector verify each cut or fill arithmetically (hub elevation minus design grade). It is neither a payment record nor a boundary map, and it carries no acceptance of the work.

Construction Surveying

A building is laid out with batter boards. What is their function?

  • a.To mark the finished floor elevation on the inside of the walls
  • b.To hold string lines on the building lines clear of the excavation✓
  • c.To support the sides of the footing trench until it is concreted
  • d.To protect the survey control points from construction traffic

Batter boards are set outside the excavation; strings stretched between them reproduce the building lines and often a reference elevation after corner stakes are dug out. Trench support is shoring, a different thing altogether.

Construction Surveying

What does the term 'daylight line' describe on a grading plan?

  • a.The line where the proposed slope meets and matches existing ground✓
  • b.The line of the crown along the center of the proposed pavement
  • c.The line of the property boundary along the edge of the grading
  • d.The line of the hinge points along each of the two shoulders

Daylight is where a designed cut or fill slope intersects natural ground, the line of catch points. Outside it the ground is undisturbed. Its position relative to property lines and easements is a common design check, but it is not itself a boundary.

Construction Surveying

During curb staking on a horizontal curve, why are stakes set at closer intervals than on tangent?

  • a.The offset distance must be changed at every stake along a curve
  • b.Curved curb is given a steeper longitudinal grade than tangent curb
  • c.Short chords between stakes follow the arc closely enough to build from✓
  • d.The deflection angle cannot be computed for arcs longer than 25 ft

The contractor strings a straight line between stakes. The gap between chord and arc grows with the square of the chord length, so short spacing on tight radii keeps the built curb on the designed arc. Grade and offset conventions do not change on a curve.

Construction Surveying

After construction, a surveyed pipe invert is found 0.30 ft higher than the plan elevation at the downstream manhole. What is the appropriate use of that information?

  • a.Report it on the as-built record so that the effect on slope can be evaluated✓
  • b.Disregard it, because inverts are accepted within one foot of the plan
  • c.Adjust the upstream benchmark by 0.30 ft so that the invert agrees
  • d.Change the plan elevation so that the record matches what was constructed

As-built data exists to show what was actually constructed; a higher downstream invert flattens the pipe and may affect capacity, which is an engineering question. Altering the design record or the benchmark to hide the difference misrepresents the work.