California Structural Pest Control Field Representative Exam — Branch 3 (Termite / Wood-Destroying) — All Questions
301 questions
How is a faulty grade at a wood-framed wall corrected?
- a.Pile more soil against the wall to seal the joint
- b.Plant dense shrubs along the wall
- c.Lower the soil or raise the foundation above grade✓
- d.Paint the siding with a sealer
The aim is clearance between soil and wood. Adding soil or planting makes the condition worse.
Which is an accepted correction for an earth-wood contact at a porch post?
- a.Bury the post deeper in the soil
- b.Set the post on a concrete base above the soil✓
- c.Pack soil firmly around the post
- d.Wrap the buried end of the post in plastic
Lifting the wood onto concrete breaks the contact. Wrapping or burying keeps the wood wet and hidden.
What is the usual correction for insufficient subarea ventilation?
- a.Raise the thermostat in the house
- b.Seal the existing vents
- c.Add or unblock foundation vents✓
- d.Lay carpet over the floor above it
More cross-ventilation lowers humidity and wood moisture. Sealing vents does the reverse.
Standing water collects under a house after rain. What kind of correction is recommended?
- a.Removal of the inspection tag from the subarea
- b.A second layer of plywood subfloor above
- c.A fumigation of the whole subarea and house
- d.Drainage or grading to keep water out✓
Excessive moisture is corrected at its source by drainage, grading or sump work. Pesticides do not correct a moisture condition.
A plumbing leak has wetted a subfloor. What must the report recommend?
- a.Fumigation with a registered fumigant
- b.Replacement of all the plumbing in the whole house
- c.Repair of the leak, as a controllable moisture condition✓
- d.No action if the wood is not yet soft
Regulation 1991 requires correction of any excessive moisture condition that is commonly controllable. The repair is to the leak, not the whole system.
A stall shower fails the water test. What is the corrective measure?
- a.Repair or replace the leaking shower pan✓
- b.Trench and treat the soil under the bathroom
- c.Post a completion tag
- d.Repaint the bathroom ceiling below the shower
The leak is the cause of the damage. Until the pan or its seal is repaired, any replaced framing will be wetted again.
What is flashing?
- a.Sheet material that directs water away from a joint✓
- b.A flash of light used to inspect the subarea
- c.A type of termite shelter tube on a wall
- d.A quick-setting concrete patch
Flashing at roofs, windows, doors and decks keeps water out of the framing. Missing or failed flashing is a common cause of decay.
Decay is found where a deck ledger meets the house wall. Which correction addresses the cause?
- a.Proper flashing and separation at the ledger✓
- b.A termite bait station set in the soil under the deck
- c.A coat of paint brushed over the decayed wood
- d.A darker stain on the deck boards
Water trapped behind an unflashed ledger wets the wall framing. Paint and stain do not stop the water entry.
Which timber sits directly on the foundation?
- a.The top plate
- b.The header
- c.The mudsill✓
- d.The ridge board
The mudsill, or sill plate, is anchored to the top of the foundation and carries the floor or wall framing. It is the member most exposed to soil moisture and termites.
Which members span between girders or foundation walls to carry the subfloor?
- a.Studs
- b.Rafters
- c.Fascia boards
- d.Floor joists✓
Joists are the horizontal framing under the floor. Rafters carry the roof and studs frame the walls.
Want these explained in order? Branch 3 Field Representative Exam — California Termite Study Guide, 2027 Edition — PDF + EPUB, $14.99 · 14-day refund →
What is a cripple wall?
- a.A retaining wall in the garden
- b.A wall damaged by termites
- c.A short stud wall between foundation and floor✓
- d.A non-bearing partition in the attic or garage
Cripple walls raise the floor above the foundation and are part of the substructure the inspector examines.
What is the fascia?
- a.The sheet under the roof covering
- b.The lowest board of the wall, on the foundation
- c.The board fixed across the rafter ends at the eave✓
- d.The beam under the floor joists
Fascia boards are exposed to weather and gutter leaks, so they are frequent sites of decay and drywood termites.
What is sheathing?
- a.Boards or panels fixed over framing under the finish✓
- b.The concrete poured under a footing
- c.The decorative trim fixed round a window or door opening
- d.The post under a girder
Roof and wall sheathing covers the framing. Stained roof sheathing in the attic is evidence of a leak.
What is a girder?
- a.A diagonal brace fixed between the roof rafters
- b.A main beam supporting the floor joists✓
- c.A vertical member inside a stud wall frame
- d.A strip of trim fixed along the eave of the roof
Girders rest on posts and piers and carry the joists. Damage at girder ends and post bases is checked in the subarea.
Which wood is required where framing rests on concrete in contact with the ground?
- a.Preservative-treated or naturally durable wood✓
- b.Particleboard or hardboard
- c.Unsealed plywood
- d.Any untreated softwood, such as Douglas fir, if painted
Building codes call for treated or naturally durable wood in locations subject to decay and termites, such as sills on foundations.
Who may remove and replace pest-damaged structural wood without a structural pest control licence?
- a.The applicator's helper on the crew
- b.The real estate agent who is handling the sale
- c.Any unlicensed handyman, if the job is small enough
- d.A licensed contractor, where the report identifies the work✓
Section 8556 allows licensed contractors to do such repairs when they are incidental to other work or identified in an inspection report.
What disclosure must a licensed contractor give when applying wood preservative under section 8556?
- a.A written statement about what the preservative does✓
- b.No disclosure of any kind
- c.A copy of the company's Branch 3 field representative licence
- d.A fumigation warning notice in the form the Board prescribes
The statute prescribes a written disclosure that the preservative is intended to prevent decay organisms and that a registered company should be contacted if infestation is suspected.
A repair may need a building permit. What does the regulation require of the inspector?
- a.A separate letter to the lender
- b.A telephone call to the city
- c.No mention at all
- d.A note on the inspection report✓
Regulation 1991 says that if, in the licensee's opinion, a building permit is required, that must be noted on the report.
After repairs, which document tells the owner what was and was not done?
- a.The notice of work completed and not completed✓
- b.The monthly pesticide use report to the county
- c.The fumigation log kept by a Branch 1 company
- d.The licence renewal form
Section 8518 requires this notice within 10 business days after the work, with costs for completed work and estimates for work not done.
Who must receive the completion notice?
- a.The original builder
- b.The owner or the owner's agent✓
- c.The neighbouring owners on each side
- d.The county assessor
Section 8518 requires the notice to be furnished to the owner of the property or the owner's agent.
Want these explained in order? Branch 3 Field Representative Exam — California Termite Study Guide, 2027 Edition — PDF + EPUB, $14.99 · 14-day refund →
How long is a copy of the completion notice kept by the company?
- a.Twelve years
- b.Six months
- c.Three years✓
- d.Eighteen months
Section 8518 requires the registered company to retain a copy of the notice for three years.
When must completed work be reported to the Board?
- a.Within 24 hours of finishing the job, by telephone
- b.Never; only inspections are reported to the Board
- c.Within 10 business days, on the Board's form✓
- d.Within one year, with the company's licence renewal
The address of the property is filed on the activity form no later than 10 business days after completing work.
Some recommended repairs were done by the owner's own contractor. How should the company word its completion notice?
- a.Leave them off the notice
- b.List them as completed and guaranteed by the company
- c.List them as completed by the company
- d.List them as not completed by the company✓
The notice states which recommendations the company completed and which it did not. It cannot take credit for or vouch for others' work it did not perform.
What should be done with wood removed during repairs that shows live infestation?
- a.Stack it in the subarea, clear of the joists and girders
- b.Bury it beside the foundation, just below the finished grade
- c.Remove it from the site and dispose of it properly✓
- d.Leave it against the fence
Infested debris left on site is cellulose debris and a source of reinfestation.
Form boards were left in place under a new porch slab. What is the correction?
- a.Treat the top surface of the slab
- b.Leave them in place as support for the slab
- c.Paint the exposed slab edges with sealer
- d.Remove them where accessible✓
Form boards are cellulose in earth contact and a classic entry route for subterranean termites.
A wood fence is nailed to the house siding and termites are tubing along it. What correction is appropriate?
- a.Add a second rail between fence and wall
- b.Water the fence line less often in summer
- c.Separate the fence from the structure✓
- d.Paint the fence
Attached wood in soil contact bridges the foundation. A gap or a non-cellulose connector breaks the route.
Stucco runs below the soil line and termites have entered behind it. Which correction applies?
- a.Add a second coat of stucco over the gap
- b.Seal the stucco with paint down to the soil
- c.Cut the stucco back or lower the grade to expose the foundation✓
- d.Bank soil higher against the wall to cover the stucco edge
Clearance between soil and the bottom of the stucco lets tubes be seen and removes the hidden path.
What is the purpose of a concrete pier under a subarea post?
- a.To hide the base of the post
- b.To hold moisture near the base of the post
- c.To keep the post out of contact with soil✓
- d.To anchor the post against wind and uplift
A pier raises wood above the earth. A post standing on soil is an earth-wood contact.
Which is the correct way to end a new sister joist?
- a.Resting on the soil
- b.Hanging from the subfloor nails alone, with no bearing
- c.Stopping a few inches short of the supports
- d.Bearing on the same supports as the original✓
A reinforcing member must carry load to the girder or foundation. One that stops short adds little strength.
When replacing a section of mudsill, what must be restored?
- a.Its direct contact with the subarea soil
- b.Its anchorage to the foundation✓
- c.Its old nail holes and fastener pattern
- d.Its original paint colour and finish
Sills are bolted or otherwise anchored to the foundation. Replacement should be treated wood, properly anchored.
Why is damaged wood cut back beyond the visible decay?
- a.Fungus extends into wood that still looks sound✓
- b.Longer cuts are quicker to make
- c.The saw works better in sound wood
- d.The regulation forbids short cuts in every case
Decay fungi grow ahead of the visibly rotted zone, so repairs remove a margin of apparently sound wood.
What is dry rot?
- a.Surface mould growing on paint
- b.Decay in wood that has never been wet at all
- c.Damage caused by drywood termites
- d.Brown, cubically cracked decay that once was wet✓
The name is misleading: all decay needs moisture. The wood is found dry and crumbly after the water source has gone.
Which condition must be corrected for a repair of decayed window sill to last?
- a.The size of the glass in the window
- b.The colour of the trim around the sill
- c.The height of the ceiling in the room
- d.The water entry at the window✓
Replacing wood without stopping the leak only resets the clock on the decay.
A roof leak has decayed the sheathing at an eave. What may the Branch 3 company do about the roof covering itself?
- a.Certify the roof as watertight in the report
- b.Recommend that a licensed roofing contractor evaluate it✓
- c.Replace the whole roof covering without a contract
- d.Ignore the stains on the sheathing
The inspection covers wood-destroying pests, not roof water tightness. The statutory statement refers owners to a licensed roofing contractor.
What should be done with loose stucco that has let moisture into a wall?
- a.Fill behind it with soil
- b.Leave it as an inspection opening
- c.Recommend its correction✓
- d.Report it as inaccessible
Regulation 1991 names loose stucco, with faulty grades and earth fill planters, as conditions to correct where they have caused moisture or infestation.
How is an earth-filled planter built against a wood wall corrected?
- a.Remove it or separate it from the wall with a gap✓
- b.Line it with untreated timber boards on the inside
- c.Water it less often in summer
- d.Fill it higher, so that rainwater runs off the top
The planter holds soil and water against the framing. A masonry planter separated from the wall by an air space avoids both.
Which of these is a reinforcement, not a replacement?
- a.Removing a decayed joist and fitting a new one in its place
- b.Cutting out and renewing a section of sill
- c.Adding a new post and pier under a weakened girder✓
- d.Fitting a new fascia board
Reinforcement adds support while leaving the original member. Regulation 1991 permits either where the member is structurally weakened.
After corrective work, when may the company certify the property?
- a.Automatically on every job it completes, without a request
- b.Only if the Board inspects and approves the work first
- c.On request of the person who ordered the report✓
- d.Only after one full year without any new infestation
Section 8519 provides for certification on request, worded according to what was found and what was completed.
What must a guarantee on repair work state?
- a.The salary of the crew
- b.Its specific terms and how long it lasts✓
- c.The name and address of the lumber supplier
- d.Only that the work is guaranteed, with no terms
Section 8516(f) requires specific terms and the period covered whenever a guarantee is given.
Who is responsible for the quality of work a registered company subcontracts?
- a.Both the prime company and the subcontractor✓
- b.Only the subcontractor doing the work
- c.Only the owner of the property
- d.No one, once the work has been paid for
Section 8514(g) says subcontracting does not relieve the prime contractor or the subcontractor of responsibility or discipline for their own acts.
What must a company give the owner before starting repairs that could give rise to a lien?
- a.A waiver of the inspection
- b.A certificate of occupancy
- c.A fumigation notice
- d.The Notice to Owner✓
Branch 3 companies give the prescribed Notice to Owner explaining mechanics lien rights.
Why is cellulose debris removed before a subarea is treated?
- a.It makes the soil too dry
- b.It is required for the fumigant to work properly
- c.It keeps the subarea soil too dry for fungus
- d.It feeds termites and hides their activity✓
Debris in earth contact supports subterranean termites and conceals tubes. Removal is a required recommendation.
A bathroom floor is soft around the toilet. What is the likely cause to be corrected?
- a.Lyctid beetles boring into the floor tile
- b.Drywood termites in the attic framing above
- c.A faulty grade outside the bathroom wall
- d.A leaking seal wetting the subfloor✓
Persistent leaks at fixtures wet the subfloor and joists and cause decay. The seal is repaired and damaged wood replaced or reinforced.
Which corrective measure reduces condensation in a damp subarea?
- a.Storing boxes against the vents
- b.A vapour barrier over the soil with adequate vents✓
- c.Watering the foundation planting to cool it
- d.Closing all the vents in summer and winter
A ground cover limits evaporation from the soil, and ventilation carries moisture out.
A downpipe discharges against the foundation. What is the correction?
- a.Extend it to carry water away from the building✓
- b.Block it with a watertight cap fitted at the bottom
- c.Shorten it so that it ends higher on the wall
- d.Point it into the nearest foundation vent
Roof water at the foundation raises subarea moisture. Carrying it away is a simple controllable correction.
Sprinklers strike the wood siding each morning. Which correction is appropriate?
- a.Add more sprinklers along the same wall
- b.Repaint the siding every year to seal it
- c.Fumigate the wall and the framing behind it
- d.Adjust or relocate the sprinkler heads✓
Removing the wetting removes the cause. Paint slows but does not prevent decay where wood is wetted daily.
What should a completion notice say about recommendations the owner declined?
- a.Nothing at all, since the owner declined to have them done
- b.That they are no longer needed for the certification to issue
- c.That they were completed
- d.That they were not completed, with an estimated cost✓
Section 8518 requires the notice to state recommendations not completed and their estimated cost.
Which wood members are named in the statute as parts to identify when infested?
- a.Pipes, wires, ducts, gas meters, water heaters, switches, outlets and light fittings
- b.Carpets, floor tiles, paint, wallpaper and window blinds
- c.Siding, studs, rafters, floor joists, fascia, subfloor, sheathing and trim✓
- d.Doors, locks, hinges, handles and window catches only
Section 8516 lists these standard components as examples of how to identify infested or infected members clearly.
What is the first step in any corrective repair of fungus damage?
- a.Apply a finish coat to the damaged area
- b.Post the completion tag beside the inspection tag
- c.Order the replacement timber for the repair
- d.Find and stop the source of moisture✓
Without moisture correction the fungus continues. Regulation 1991 ties every fungus repair to correcting the moisture condition.
Old drywood pellets remain in an attic after treatment. What is done with them?
- a.They are removed or covered✓
- b.They are mixed into the insulation
- c.They are mailed to the Board
- d.They are left to show past activity
Regulation 1991 calls for removing or covering accessible pellets and frass so that any fresh pellets signal new activity.