  • Prints from your browser (Ctrl-P, or Cmd-P on a Mac) — the navigation, buttons and links drop out of the printed copy.
  • 260 free CSLB C-17 Glazing (Trade Exam) practice questions on the same material, every one explained.
  • Last updated: November 2026.
Studying in order?

Practice stays free. The full CSLB C-17 Glazing study guide is the material itself, taught start to finish — a downloadable PDF + EPUB you keep.

Get the book — $24.99

Planning and Estimating

27% of the exam
Study →
Surface numbers
Count glass surfaces from the exterior inward; a low-e coating on surface 2 is the air-space face of the outer lite.· Guardian IGU brochure
Check the code
Each glass mark is checked against the hazardous-location rules; a specification silent on safety glazing does not excuse the glazier.· 2025 CBC §2406.4
Square feet
Width x height in inches, divided by 144, gives square feet.· Area arithmetic
Glass weight
Glass weighs about 13 pounds per square foot for every inch of thickness.· 2025 CBC §2404.2
Setting blocks
Two blocks at the quarter points; 0.1 inch per square foot, never under 4 inches.· Manufacturer guideline (ATS-192)
Markup and margin
Price = cost x (1 + markup), or cost / (1 - margin).· Estimating arithmetic

Fabrication and Installation of Framing Systems

21% of the exam
Study →
Square within 1/8 inch
Diagonals of an opening differ by no more than 1/8 inch in one manufacturer's guideline.· Pilkington ATS-192
Deflection
Glass-edge framing is limited to 1/175 of the edge length for edges up to 13 feet 6 inches.· 2025 CBC §2403.3
Seal before assembly
Sealant goes on member ends before the frame is assembled.· Manufacturer storefront checklist
Heat-treated glass
Drilling and notching are done before heat treatment; finished glass cannot be recut.· GANA FB45-14
Shim then anchor
The specification says to shim and brace the aluminum system before anchoring it.· UFGS 08 41 13
Dissimilar materials
Aluminum touching masonry or concrete is separated by nylon pads or a bituminous coating.· UFGS 08 41 13

Fabrication and Installation of Glazing Materials

18% of the exam
Study →
Setting blocks
Blocks are 1/16 inch narrower than the channel and never cover a weep.· Pilkington ATS-192
No trimming
Insulating units are not ground, nipped or cut after they leave the factory.· UFGS 08 81 00
Category II
Shower and tub enclosures, patio doors and doors with a piece over 9 square feet are Category II.· 16 CFR 1201.2
Fire windows
Fire-protection-rated glazing may not exceed 25 percent of the area of a common wall.· 2025 CBC §716.3.2.1.2
Joint proportion
Joint width to backer-rod setback is 2:1, with a 3/8-inch maximum setback.· NIH sealant joint bulletin
Mark the glass
Employees are protected from walking through glass by barriers or conspicuous durable markings.· Title 8 §1525

Glazing Replacement and Retrofit Projects

15% of the exam
Study →
New-work rule
The installation of replacement glass is as required for new installations.· 2025 CBC §2402.1
Why it broke
Partial shading, signs on the glass, chipped edges and ponded pockets are common causes in the glass makers' guidelines.· Pilkington ATS-192
Overall thickness
Overall thickness runs outside surface to outside surface; gap width runs inside to inside.· CEC residential compliance manual Ch. 3
Lead renovation
Removing windows from pre-1978 housing can require an EPA-certified firm.· 40 CFR 745
Labels
Windows that are not field-fabricated carry NFRC-certified or default labels.· CEC residential compliance manual Ch. 3
Window fall protection
Low sills high above grade need a 4-inch-sphere opening limit or a control device.· 2025 CRC §R321.2

Safety

19% of the exam
Study →
Tailgate meetings
Supervisors hold safety meetings at least every 10 working days.· Title 8 §1509(e)
Gloves
Gloves are not worn where they can be caught in moving machinery.· Title 8 §3384
Fall threshold
Personal fall protection is required for exposure to falling in excess of 7-1/2 feet.· Title 8 §1670(a)
Wall openings
A wall opening with a drop over 4 feet and a bottom under 3 feet is guarded.· Title 8 §1632(j)
Rails
Top rail 42 to 45 inches high, withstanding 200 pounds.· Title 8 §1620
Ladders
Portable ladder rails extend 36 inches above the landing; the foot is one-quarter of the working length out.· Title 8 §3276

Want the dense 6-page printable? CSLB C-17 Glazing cheat sheet PDF — $9.99 →

Now prove you know them

Reading an outline is not the same as recalling it under exam pressure. Drill the free CSLB C-17 Glazing (Trade Exam) questions to find the areas you keep missing, then sit a full timed mock.

Study aid, not a substitute for the official material — always confirm the current rule with CSLB — C-17 study guide (13E-17).