CSLB weights Planning and Estimating at about 25% of the C-21 exam: evaluating plans and specifications, hazardous materials surveys and job site readiness, determining methods and equipment, and estimating costs. Some questions require computation, and a calculator is provided. This page is a short survey; the PrepPass C-21 study guide teaches every statement with worked examples and a full practice exam at CSLB's weights.
Plans, surveys and permits
A demolition starts with paper: the drawings, the specifications, a written structural survey and a separate hazardous materials survey.
Surveys and readiness
Read the survey for what it covers and what it leaves out, then control the site's energy before any machine moves.
Methods and estimating
Method follows hazard; arithmetic follows units.
Keep going: the full CSLB C-21 Building Moving and Demolition guide covers every section of the exam. CSLB C-21 Building Moving and Demolition Study Guide — 2026 Edition — PDF + EPUB, $24.99 · 14-day refund →
Want the 6-page colour cheat sheet to print for exam week? CSLB C-21 Building Moving and Demolition cheat sheet PDF — $9.99 →

Practice stays free. The full CSLB C-21 Building Moving and Demolition study guide is the material itself, taught start to finish — a downloadable PDF + EPUB you keep.