Chapter 2 of 9
General Regulations
General regulations cover how piping is protected, supported, buried, tested and identified, whatever system it belongs to. The section numbers here are from Chapter 3 of the 2018 International Plumbing Code.
Protecting and supporting pipe
Pipe near the face of framing needs steel shield plates. Pipe through foundation walls needs a sleeve or relieving arch, and pipe in concrete or corrosive soil needs a wrap. Trenches may not undermine footings, and backfill goes in thin tamped layers. Hanger spacing depends on the material.
Shield plates
Required where pipe is less than 1-1/4 inches from the edge of the member; No. 16 gage steel; extend 2 inches past plates.
IPC §305.6Backfill
6-inch tamped layers until 12 inches of cover over the pipe.
IPC §306.3Hanger spacing
PVC and ABS 4 ft; copper tubing 6 ft (1-1/4 in. and smaller) or 10 ft; cast iron 5 ft, or 10 ft with 10-ft lengths; PEX 32 in.; steel 12 ft.
IPC §308.5Tests
Know each test by its pressure and its time. Plastic piping is never tested with air.
DWV water test
10-foot head for 15 minutes.
IPC §312.2DWV air test
5 psi for 15 minutes; not for plastic pipe.
IPC §§312.1, 312.3Water supply test
Working pressure, or 50 psi air for non-plastic pipe, for 15 minutes.
IPC §312.5Shower liner
2 inches of water at the threshold for 15 minutes.
IPC §312.9Backflow assemblies
Tested at installation, after repair or relocation, and annually.
IPC §312.10