Feeder Design: Demand Loads, Motor Feeders, Taps and Transformers
At the master level a feeder question is rarely one step. You are expected to turn a connected load into a demand load, turn that into amperes, and then choose conductors, protection and grounding that agree with each other. This chapter follows that design sequence.
From load to amperes to a device
Every design starts by converting the load to current. For a three-phase feeder, divide the volt-amperes by 1.732 times the line voltage: a 120,000 volt-ampere load at 208 volts is 120,000 / (1.732 x 208) = 333 amperes. Forgetting the 1.732 is the usual mistake. Next, separate continuous from noncontinuous load. Conductor ampacity and device rating both use 125 percent of the continuous part plus 100 percent of the rest. A 100-ampere continuous load with a 50-ampere noncontinuous load needs conductors good for 125 + 50 = 175 amperes. A 120-ampere continuous load with 40 amperes noncontinuous calculates to 190 amperes, and the device is the next standard rating, 200 amperes. Read the question for which of the two it wants. A conductor question that asks for minimum ampacity wants the calculated figure, not a standard device size. When a conductor ampacity falls between standard ratings, the next higher device is allowed for ratings up to 800 amperes: a 240-ampere conductor may sit behind a 250-ampere device. For parallel runs, the ampacities of the sets add, so two sets of 500 kcmil copper at 380 amperes each give 760 amperes before any adjustment.
Stacking the standard dwelling demand factors
Article 120 holds the load calculations. In the standard method each load type has its own demand rule, and the feeder load is the sum of the results. Master questions test whether you apply each factor to the right subtotal. General lighting, small-appliance and laundry loads are combined before the lighting demand is applied. With 9,000, 3,000 and 1,500 volt-amperes the subtotal is 13,500; the first 3,000 stays at 100 percent and the remaining 10,500 is taken at 35 percent, 3,675, for a net of 6,675 volt-amperes. Ranges come from Column C of the range table by count: 8 kilowatts for one, 11 for two, 14 for three, 20 for five, as long as none exceeds 12 kilowatts. When the ranges are larger, Note 1 raises the Column C value 5 percent for each kilowatt above 12. One 14-kilowatt range is 8,000 x 1.10 = 8,800 volt-amperes, one 16-kilowatt range is 8,000 x 1.20 = 9,600, and five 14-kilowatt ranges are 20,000 x 1.10 = 22,000. The increase is applied to the table value for the group, not to the nameplates. Dryers use a demand table by count: three to five dryers are taken at 80 percent and six at 75 percent. Four 5.5-kilowatt dryers are 22,000 x 0.80 = 17,600 volt-amperes; six 5-kilowatt dryers are 30,000 x 0.75 = 22,500. Fastened-in-place appliances get 75 percent when there are four or more on the feeder, so five appliances totaling 8,200 volt-amperes become 6,150.
Optional, multifamily and commercial demand
PSI's stated rule is that optional methods and exceptions are ignored unless the question asks for them, and that conductors are copper unless stated. So use the optional dwelling method only when the question names it. When it does, the general loads take the first 8 kVA at 100 percent and the remainder at 40 percent: 32,000 volt-amperes becomes 8,000 + (0.40 x 24,000) = 17,600. Heating and cooling are handled separately by taking the largest of the listed figures. With 5,000 volt-amperes of air-conditioning at 100 percent and 9,000 volt-amperes of central electric heat at 65 percent (5,850), the heat figure governs and 5,850 is the single value included. For multifamily buildings the optional method multiplies the whole connected load by one factor chosen by the number of units. For 46 to 50 units the factor is 26 percent, so a 48-unit building with 720,000 volt-amperes connected calculates to 187,200. Two commercial tables finish the set. Receptacle loads take the first 10 kVA at 100 percent and the rest at 50 percent, so 10,800 volt-amperes becomes 10,400. Commercial kitchen equipment with six or more units is taken at 65 percent: 60 kilowatts becomes 39 and 80 becomes 52, and the result may not be less than the sum of the two largest units. The planted wrong answer uses 75 percent, which is the dwelling appliance factor.
Motor feeders
A feeder that supplies several motors is sized two different ways, and the exam checks that you keep them apart. The conductors need 125 percent of the largest motor full-load current plus 100 percent of the others. For 65, 40 and 27 ampere motors that is (65 x 1.25) + 40 + 27 = 148.25 amperes. With two identical 14-ampere motors, one of them still takes the 125 percent: 17.5 + 14 = 31.5 amperes. The feeder short-circuit and ground-fault device is a ceiling, not a minimum. It may not exceed the largest branch-circuit device of any motor on the feeder plus the full-load currents of the other motors. With a 90-ampere largest branch device and 50 amperes of other motors, the limit is 140 amperes, and since the device may not exceed that sum you go down to the nearest standard rating, 125 amperes. Rounding up here is the error.
Taps and transformer conductors
Tap rules trade length for ampacity. A tap of 10 feet or less that leaves the enclosure where it is made needs at least one-tenth of the feeder device rating, and never less than the load it serves: 40 amperes on a 400-ampere feeder, 60 on a 600. A tap up to 25 feet needs one-third: 200 amperes on a 600-ampere feeder, about 266.7 on an 800. Each fraction shows up as the wrong answer for the other rule. The device at the load end cannot be rounded up, because the next-standard-size allowance is not available for tap conductors. Worked example, transformer tap. A feeder protected at 300 amperes is tapped to supply a 480-volt to 208-volt transformer, with primary plus secondary conductors within 25 feet. Find the minimum secondary conductor ampacity. Step 1: take one-third of the feeder device: 300 / 3 = 100 amperes. This is also the minimum for the primary tap conductors. Step 2: find the primary-to-secondary voltage ratio: 480 / 208 = 2.308. Step 3: multiply: 2.308 x 100 = 230.8 amperes. The secondary runs at lower voltage and higher current, so the ratio must be greater than one. Inverting it gives 43.3 amperes, an answer that should look wrong for a secondary conductor. A related rule runs the other way. For a single-phase, 2-wire secondary, the primary device is considered to protect the secondary conductors if it does not exceed the secondary ampacity multiplied by the secondary-to-primary voltage ratio. With 200-ampere secondary conductors on a 480 to 240 volt transformer, that is 200 x (240 / 480) = 100 amperes.
Neutral, grounding and system-level requirements
The feeder neutral is sized for the maximum unbalanced load, with two reductions to know. The neutral share of household ranges may be taken at 70 percent of the range demand, so an 8,000 volt-ampere range demand contributes 5,600 and a 14,000 demand contributes 9,800. For the unbalanced load as a whole, the first 200 amperes stays at 100 percent and the portion above it is taken at 70 percent: 300 amperes becomes 200 + 70 = 270. Whatever the calculation gives, the feeder grounded conductor may not be smaller than the equipment grounding conductor size the grounding table requires. The equipment grounding conductor is read from the device rating. For copper: 200 amperes is 6 AWG, 400 is 3 AWG, 500 is 2 AWG, 600 is 1 AWG, 800 is 1/0 AWG and 1,200 is 3/0 AWG. A feeder to a detached building must carry an equipment grounding conductor with the supply conductors, and the neutral at that building is kept isolated from it and from the electrodes. Ground-fault protection of equipment is required for a feeder disconnect rated 1000 amperes or more on a solidly grounded wye system with more than 150 volts to ground and not over 1000 volts phase to phase. A 1200-ampere, 480Y/277-volt disconnect meets it; 208Y/120-volt equipment does not. Where a building has more than one voltage system, ungrounded feeder conductors are identified by phase and system at every termination, connection and splice point. A feeder that carries the whole load of service conductors of 55 amperes or less must have at least their ampacity.
Keep going: the full Texas Master Electrician (TDLR / PSI, 2026 NEC) guide covers every section of the exam. Texas Master Electrician Exam — Open-Book Study Guide (2026 NEC) — PDF + EPUB, $14.99 · 14-day refund →
Want the dense 47-page printable for exam week? Texas Master Electrician (TDLR / PSI, 2026 NEC) cheat sheet PDF — $9.99 →

Practice stays free. The full Texas Master Electrician (TDLR / PSI, 2026 NEC) study guide is the material itself, taught start to finish — a downloadable PDF + EPUB you keep.