Chapter 2 of 7

Plumbing Codes: Design and Commercial Systems

The master exam leans toward design: how many fixtures a building needs, how stacks and vents are sized in tall buildings, and how storm drainage, interceptors and pumped systems are laid out. Section numbers are from the 2018 International Plumbing Code. The official exam also includes sizing charts and a multi-story design exercise that this bank does not reproduce.

Fixture counts and water supply

Fixture counts start from the occupant load, split equally between the sexes. Water distribution is sized from water supply fixture units, the pressure available after static head and losses, and the developed length to the most remote fixture.

Occupant split
50 percent male, 50 percent female.
IPC §403.1.1
Separate facilities
Not required with 15 or fewer occupants.
IPC §403.2
Covered malls
Path of travel to toilets not more than 300 feet.
IPC §403.3.4
Hot water length
50 feet of developed length from the source unless recirculated or heat traced.
IPC §607.2
Fire sprinklers
Double check assembly; reduced pressure principle assembly where antifreeze or additives are used.
IPC §608.16.4
Non-potable piping
Identified by colour, tags or tape at intervals of 25 feet or less.
IPC §608.8

Stacks, vents and pumped drainage

Stacks are sized by drainage fixture units and height in branch intervals. Tall stacks need vent stacks and relief vents, and fixtures below the sewer are pumped from a covered, vented sump.

Branch interval
A vertical length of stack of at least 8 feet.
IPC §202
Vent stack
Required for five or more branch intervals; connects at or below the lowest branch.
IPC §§904.2, 904.4
Relief vents
Each tenth interval, counted from the top, in buildings over 10 branch intervals.
IPC §908.1
Base of stack
No horizontal branch within 10 stack diameters downstream.
IPC §711.1
Sewage ejectors
Pass 2-inch solids unless a grinder; discharge through a wye from the top; sump vent 1-1/4 inches minimum.
IPC §§712.3.5, 712.4.2, 906.5
Building sewer
Manholes every 200 feet on sewers 8 inches and larger.
IPC §708.1.2

Storm drainage and interceptors

Roof drainage is sized on the 100-year, 1-hour rainfall rate. Where a parapet could pond water, a separate secondary system discharges where it will be seen. Grease interceptors are rated by flow and need a flow control.

Rainfall rate
100-year, 1-hour storm for the location.
IPC §1106.1
Secondary drains
Required where water would be trapped; separate piping to a visible point above grade.
IPC §§1108.1, 1108.2
Subsoil drains
4 inches minimum.
IPC §1111.1
Storm sump pit
18 inches in diameter and 24 inches deep.
IPC §1113.1.2
Grease interceptors
Rated in gallons per minute; flow control limits the rate.
IPC §1003.3.4
Medical gas
Installed to NFPA 99.
IPC §1202.1

Tests and administration

An alternative design is submitted by a registered design professional, and alternative materials must be equivalent to what the code prescribes. The rough-in inspection comes before piping is covered.

Air test
5 psi (10 inches of mercury) for 15 minutes; not on plastic pipe.
IPC §312.3
Final test
Smoke or peppermint at 1 inch of water column, where required.
IPC §312.4
Alternative design
Documents from a registered design professional.
IPC §316