Contratos y EjecuciónPregunta 776 de 1605

On a $3,000 fence job with no joint control, the maximum lawful down payment is:

a.$1,500
b.$600
c.$1,000
d.$300

Explicación

Ten percent of $3,000 is $300, which is less than the $1,000 cap. Because the limit is the lesser of the two, the maximum down payment is $300.

Referencia Legal: B&P §7159(d)

Practica las 1605 preguntas gratis — sin registro.

Preguntas relacionadas de este tema

Última revisión: · proceso editorial

Sen Lin, Fundador de PrepPass · Verificado con California CSLB Contractor License Law & Business Exam · Cómo revisamos
Revisado por Abraham Chen Licensed California General Contractor (CSLB License #1101856 verificar)
Reportar