AdministrationPregunta 76 de 110

A jurisdiction charges a plumbing permit fee of a $75 base plus $12 per fixture. A project has 18 fixtures. What is the permit fee?

a.$216
b.$249
c.$366
d.$291

Explicación

Fee = base + (per-fixture x count) = 75 + (12 x 18) = 75 + 216 = $291. Fixture-based fee schedules tie the permit cost to the scope of work, so an accurate fixture count is needed both for the fee and for sizing. Forgetting the base fee gives the too-low $216.

Referencia Legal: UPC §103.0

Practica las 110 preguntas gratis — sin registro.

Preguntas relacionadas de este tema

Última revisión: · proceso editorial

Equipo Editorial de PrepPass · Verificado con Master Plumber Licensing Exam (UPC/IPC-based) · Cómo revisamos
Reportar