For an excavation deeper than 20 feet, protective systems (such as shoring or shielding) must be:
Giải thích
Note 3 to Appendix B is explicit: sloping or benching for excavations greater than 20 feet deep shall be designed by a registered professional engineer, and section 1541.1(b)(4) requires that design to be stamped and signed. Options (a) and (b) are the other two lawful routes - Option 3 lets the employer work from tabulated data approved by an engineer, Option 2 from Appendices A and B - and both are genuinely available to a competent person, but only up to 20 feet. That is what makes them the right kind of wrong answer: they are correct rules read past their depth limit. A building department may review shoring as part of a permit in some cities, but it has no role under Title 8 (c).
Trích dẫn luật: 8 CCR §1541.1(b)(1)-(4); §1541.1 Appendix B note 3; 29 CFR 1926.652(b)Luyện miễn phí toàn bộ 1632 câu hỏi — không cần đăng ký.
Own the complete CSLB Law & Business guide — PDF + EPUB, $24.99 →
Câu hỏi liên quan cùng chủ đề
- The top edge of a standard guardrail top rail must be approximately what height above the walking/working surface?
- At what depth does an excavation generally require a protective system such as sloping, shoring, or shielding to protect workers from cave-ins?
- Who must inspect an excavation for hazardous conditions before employees enter and as conditions change?
- A trench is 5 feet deep. What means of egress must be provided for workers?
- Excavated spoil, materials, and equipment must be kept at least how far back from the edge of an excavation?
- Before entering a trench more than 4 feet deep where a hazardous atmosphere could exist (e.g., near landfill or sewer), the employer must: