Monitoring & QACâu 75 / 100

A sterilizer has just been relocated to a new position in the department. What testing is required before it processes patient loads?

a.A single Bowie-Dick test on the first day of use
b.Installation and requalification testing, including three consecutive negative biological indicator cycles in an empty chamber, plus three passing Bowie-Dick tests for dynamic-air-removal sterilizers
c.No testing, because the sterilizer passed all tests before it was moved
d.Only a leak test performed by the service technician

Giải thích

Relocation, installation, and major repairs all trigger full qualification testing because the utilities, leveling, and connections have changed. The accepted protocol is three consecutive empty-chamber cycles with negative biological indicators, with Bowie-Dick testing added for dynamic-air-removal units. A service leak test or a single daily test is not a substitute for qualification.

Trích dẫn luật: AAMI ST79

Luyện miễn phí toàn bộ 100 câu hỏi — không cần đăng ký.

Câu hỏi liên quan cùng chủ đề

Cập nhật gần nhất: · quy trình kiểm tra

Đội Ngũ Biên Tập PrepPass · Đối chiếu với HSPA Certified Registered Central Service Technician (CRCST) Exam · Quy trình kiểm tra
Báo lỗi