设施、清洁与虫害第 498 / 500 题
A maintenance worker ties a well-water line into the building's drinking water piping. Why must the manager stop this?
a.It reduces the water pressure at the dish machine's final rinse
b.It voids the plumbing permit issued for the building
c.It creates a cross connection with a system of unknown quality
d.It raises the water hardness above the sanitizer's limit
解析
No person may create a cross connection by joining the drinking water system to a non-drinking water system or a water system of unknown quality, and non-drinking water piping must be durably identified so it is readily distinguishable. Pressure and hardness are operating problems; a cross connection is a contamination pathway into every tap in the building.
法律依据: FDA Food Code §5-205.12免费刷完整 500 道题库 — 无需注册。
Own the complete ServSafe Food Protection Manager guide — PDF + EPUB, $19.99 →
同考点相关题目
- A fluorescent tube hangs bare above the open salad prep table. What does the Food Code require?
- What minimum light intensity does the Food Code require at a surface where an employee is working with a slicer?
- What does the Food Code require of the dumpster in the alley behind a restaurant?
- A guest with a service dog asks to be seated. Where does the Food Code allow that animal?
- Where must a crew dump dirty mop water at the end of a shift?
- A manager builds a pest control program. Which set of actions matches what the Food Code requires?
最近核对: · 审核流程
PrepPass 团队 · 依据官方资料核对 ServSafe Food Protection Manager Exam · 我们如何核对