Louisiana Contractor Business and Law — Study Guide (2026) cover

Study guide · 2026 Edition

Louisiana Contractor Business and Law — Study Guide (2026)

PrepPass's independent 2026 study guide for the Louisiana Contractor Business & Law exam is 151 pages including 100 practice questions with a full answer key, PDF + EPUB, $14.99 one-time; it is not affiliated with the exam provider.

Edition: Written to the LSLBC pages and rules read November 2026: 50 questions online, 70 or above to pass.

Length
151 pages
Practice questions in the book
100
File last updated
November 2026
Delivery
PDF + EPUB · English · instant download

Please read before you buy: An independent study guide, not affiliated with or endorsed by the Louisiana State Licensing Board for Contractors, the State of Louisiana or PSI.

Read the rest of this notice

Prepared with AI assistance from the statutes and the board's own pages. It contains no real exam questions and is not legal advice. The board publishes no content outline, topic weights or time limit for this exam, so the book states none.

What is in the Louisiana Contractor Business & Law study guide?

For the Louisiana State Licensing Board for Contractors Business and Law requirement: licensing thresholds, classifications, enforcement, the Private Works Act and the Public Works Act, each rule cited to its statute.

Exam facts, who it suits and what changed

Look inside the book

Three real pages, rendered straight from the PDF you download — a reference page, a teaching page, and a worked question, always in that order. Nothing here was redrawn to look better.

  • Quick reference
    Part II — Louisiana Law, Licensing & Exam Requirements · PDF page 65
  • How it's taught
    Part III — Full Practice Exam · PDF page 132
  • A question, worked
    Part III — Full Practice Exam · PDF page 117

What's included — and what isn't

Included

  • Fifteen chapters: eight on the national business and law core, seven on Louisiana law
  • Who needs a license, the dollar thresholds, classifications and exemptions, cited to La. R.S. Title 37 and the board's rules

Not included

  • No printed copy is shipped — this is a file you download and can print yourself
  • No video course, instructor or tutoring comes with the book — the free videos on the site are separate
Everything included, and everything that isn't

Included

  • The Private Works Act and the Public Works Act: who may claim, the notices and the filing periods
  • The New Home Warranty Act, workers' compensation and sales tax as they apply to a Louisiana contractor
  • A 100-question practice exam (60 national, 40 Louisiana) with an explanation for every answer
  • A key-number sheet, a glossary and an exam-day strategy appendix
  • PDF (print it) + EPUB (phone / e-reader)

Not included

  • Not your exam registration or the testing centre's fee, which you still pay to the official body

Contents

See 6 sections and the page each one starts on
  1. Part I — The National Business & Law Corep. 9
  2. Part II — Louisiana Law, Licensing & Exam Requirementsp. 44
  3. Part III — Full Practice Examp. 99
  4. Appendix A — Formula & key- number sheetp. 142
  5. Appendix B — Glossaryp. 146
  6. Appendix C — Exam-day strategyp. 150

Taken from the PDF you download, with the page each one starts on — not typed here.

Read a chapter free, in full

One complete chapter, exactly as it ships in the eBook. Scroll the window to read it right here; no download, no email.

Read chapter 14 here, without leaving the page

The free chapter is Getting Paid: The Private Works Act and the Public Works Act, the deadlines that are easiest to mix up.

FREE SAMPLE — READ IT RIGHT HERE
Chapter 14 · ≈10 min read
Getting Paid: The Private Works Act and the Public Works Act
scroll ↓

Louisiana state portion · Liens, claims, bonds and retainage

Introduction

Louisiana calls construction liens privileges and claims, and it handles private and public jobs under separate statutes. The Private Works Act, La. R.S. 9:4801 et seq., was rewritten by Act 325 of 2019, effective January 1, 2020; anything written before that may be wrong. The Public Works Act, La. R.S. 38:2241 et seq., governs claims on public projects, where you cannot lien public property and look to the bond and the retained funds instead. Most of the numbers in this chapter are deadlines.

Key numbers

ItemFigureAuthority
Statement of claim: default rule60 days after notice of termination, or after substantial completion/abandonment if noneLa. R.S. 9:4822(A)
Subs etc. when notice of contract filed30 days after notice of termination; 6 months after substantial completion if noneLa. R.S. 9:4822(B)
General contractor when notice of contract filed60 days after notice of termination; 7 months after substantial completion if noneLa. R.S. 9:4822(C)
Residential, no notice of contract: sub, supplier or lessor who sends notice of nonpayment70 days (notice at least 10 days before filing)La. R.S. 9:4822(D)
GC loses privilege without notice of contractContract over $100,000La. R.S. 9:4811(D)
Suit to enforceWithin 1 year after filing statementLa. R.S. 9:4823(A)(2)
Owner must file notice of termination on GC's requestWithin 10 daysLa. R.S. 9:4822(F)
Public contract in writingOver $5,000La. R.S. 38:2241(A)(1)
Public payment bondContracts over $25,000; at least 50% of priceLa. R.S. 38:2241(A)(2)
Public sworn statement of claimWithin 45 days after recorded acceptance or notice of defaultLa. R.S. 38:2242(B)
Suit on public bondWithin 1 year from registry of acceptance or defaultLa. R.S. 38:2247(A)
Public retainage cap10% under $500,000; 5% at $500,000 or moreLa. R.S. 38:2248(A)

Part A — Who has a privilege or claim on private work

When the owner contracts directly, these persons have a privilege on the immovable for the owner's obligations: contractors, for the price of their work; the owner's laborers or employees, for work at the site; sellers of movables that become part of the immovable or are consumed at the site; lessors of movables used at the site under a written lease; and professional consultants and subconsultants engaged by the owner (La. R.S. 9:4801).

When the work is done through a contractor, these persons have a claim against the owner and a claim against the contractor: subcontractors; laborers or employees of the contractor or a subcontractor; sellers to the contractor or subcontractor; lessors under written leases; and professional consultants engaged by the contractor or subcontractor (La. R.S. 9:4802(A)). The claim against the owner is secured by a privilege on the immovable (La. R.S. 9:4802(B)). The contractor must indemnify the owner for these claims (La. R.S. 9:4802(F)).

Definitions. A contractor contracts with an owner to perform all or part of a work; a general contractor contracts to perform all or substantially all of a work, or files a notice of contract that makes it one; a subcontractor contracts with a contractor, directly or through a chain of contracts (La. R.S. 9:4807, 4808(B)). "Owner" is broad: co-owners, lessees, usufructuaries and others with an interest qualify (La. R.S. 9:4806(A)).

The owner's protection: notice of contract plus bond. The owner is relieved of the 9:4802 claims and the privileges securing them when the general contractor gives and maintains the bond required by 9:4812 and notice of the contract with the bond attached is properly and timely filed under 9:4811 (La. R.S. 9:4802(C)). Unpaid subs and suppliers then look to the contractor and surety.

Part B — Notice of contract and the bond

A notice of contract between a general contractor and an owner is filed before the contractor begins work. It must be signed by the owner and contractor and contain a complete property description, the parties and mailing addresses, the price (or the method and an estimate), when payment is due, and a general description of the work (La. R.S. 9:4811(A)). All Private Works Act filings are made with the recorder of mortgages of the parish where the immovable is located (La. R.S. 9:4831(A)).

Big-job rule for the general contractor. A general contractor whose contract price is more than $100,000 has no privilege unless notice of the contract is timely filed, and cannot file a statement of claim or privilege for amounts due (La. R.S. 9:4811(D)).

The bond. To get the 9:4802(C) protection, the owner requires the general contractor to furnish a bond of a solvent surety, attached to the notice of contract. If the contract price is more than $100,000, the surety must be a company licensed in Louisiana. The bond may not be less than the price stated or estimated in the notice of contract (La. R.S. 9:4812(A), (B)). Extensions of time do not release the surety (La. R.S. 9:4812(E)(1)). A seller has a direct right to payment from the surety if it sends a notice of nonpayment no sooner than 45 days after delivery, remains unpaid at 90 days after delivery, and then sends a payment notice; the surety must pay within ten days (La. R.S. 9:4812(F)).

When privileges take effect. Privileges are effective against third persons from the earlier of filing the notice of contract or the visible start of work at the site. Surveying, design services, test piling, tree removal, fill dirt, demolition, clearing and grading do not count as starting work (La. R.S. 9:4820(A)). This matters for ranking against a lender's mortgage.

Part C — Preserving the claim: the deadlines

A notice of termination of the work is signed by the owner and certifies substantial completion, abandonment by the owner, the general contractor's default, or termination of the contract (La. R.S. 9:4822(E)). If the work has been substantially completed or abandoned, the owner must file a notice of termination within ten days of the general contractor's request (La. R.S. 9:4822(F)).

The filing deadline for the statement of claim or privilege depends on whether a notice of contract was filed and who you are (La. R.S. 9:4822):

SituationDeadline
No notice of contract (default rule), anyone60 days after notice of termination; if none, 60 days after substantial completion or abandonment
Notice of contract timely filed; subcontractor, supplier, lessor, laborer, consultant under 9:480230 days after notice of termination; if none, 6 months after substantial completion or abandonment. Also deliver a copy to the owner if the notice gives the owner's address
Notice of contract timely filed; general contractor60 days after notice of termination; if none, 7 months after substantial completion or abandonment
Residential work, no notice of contract; a sub, seller, equipment lessor or other 9:4802 claimant (not the general contractor) sends the owner a notice of nonpayment within the 60-day period and at least 10 days before filing70 days after notice of termination; if none, after substantial completion or abandonment

The statement must be in writing and signed, reasonably identify the immovable, set out and reasonably itemize the amount and nature of the obligation, and identify the liable owner (La. R.S. 9:4822(H)). A street address and owner's name alone is not a sufficient property description (La. R.S. 9:4831(B)).

Extinguishment. A privilege or claim is extinguished if it is not preserved under 9:4822, if no suit is filed against the owner within one year after filing the statement, or if the underlying obligation is extinguished (La. R.S. 9:4823(A)). A claim against the contractor survives a missed filing if the statement was delivered to the contractor within the filing period, and survives a missed owner suit if suit against the contractor or surety is brought within one year after the filing period expires (La. R.S. 9:4823(B)). Filing a bond under 9:4835 also extinguishes the privilege (La. R.S. 9:4823(D), (E)).

Worked example. An owner and general contractor file a notice of contract with a bond. The owner files a notice of termination on April 4. A drywall subcontractor is owed $38,000. Because a notice of contract was filed, the sub has 30 days, until May 4, to file its statement and deliver a copy to the owner. The general contractor, if the owner still owes it money, has 60 days, until June 3. If instead no notice of contract had been filed and no notice of termination ever issued, every claimant would have 60 days from substantial completion. On residential work, a sub or supplier that sends the owner a notice of nonpayment inside that 60 days, and at least 10 days before filing, gets 70 days instead; the general contractor's own deadline stays at 60.

Part D — Public works: bond, claims and retainage

The Private Works Act does not apply to public works of the state or its agencies and political subdivisions (La. R.S. 9:4808(D)(3)). Public projects run on the Public Works Act.

Contract and payment bond. A public entity's contract over $5,000 for public works must be in writing and signed (with an emergency exception under $50,000). For each contract over $25,000 per project, the public entity must require a payment bond of not less than 50% of the contract price, recorded with the contract in the parish mortgage records within 30 days after work begins (La. R.S. 38:2241(A)). The payment terms of any bond on such a contract are read as statutory provisions and cannot be waived by contract (La. R.S. 38:2241(C), (F)).

Who is a claimant. Anyone owed money under a contract with the owner, a contractor or subcontractor for labor, materials or supplies for the work, including for-hire carriers delivering to the site, fuel and power for machines, lessors of movables under written leases, and surveyors, engineers and architects employed by the contractor or a sub (La. R.S. 38:2242(A)). A lessor must deliver a copy of the lease to the owner within ten days after the equipment first arrives at the site (La. R.S. 38:2242(C)(1)).

The 45-day sworn statement. After the claim matures and within 45 days after the recordation of acceptance of the work by the governing authority or of a notice of default, the claimant files a sworn statement of the amount due with the governing authority and records it with the parish recorder of mortgages (La. R.S. 38:2242(B)). If the authority makes final payment without deducting outstanding claims or getting a bond to cover them, the authority becomes liable for those claims (La. R.S. 38:2242(D)).

Lower-tier claimants. A claimant who contracted with a subcontractor but has no contract with the general contractor must, in addition to the sworn statement, give the general contractor written notice by registered or certified mail within 45 days of the recordation of acceptance or default (La. R.S. 38:2247(A)). A materialman who has not been paid by a subcontractor loses its privilege unless it sends notice of nonpayment to the general contractor and owner within 75 days from the last day of the month of delivery, or within the lien period if sooner (La. R.S. 38:2242(F)).

Suit on the bond must be brought against the surety, the contractor or both within one year from the registry of acceptance or notice of default (La. R.S. 38:2247(A)).

Retainage. A public contract may not let the public entity withhold more than 10% of the price on projects under $500,000, or 5% on projects of $500,000 or more, until 45 days after recordation of formal acceptance or notice of default (La. R.S. 38:2248(A)). The entity may not withhold more than the value of the punch list (La. R.S. 38:2248(B)(1)).

Worked example. A parish awards a $420,000 drainage contract. Minimum payment bond: 50% × $420,000 = $210,000. Maximum retainage: 10% × $420,000 = $42,000, because the contract is under $500,000. On a $900,000 contract the cap is 5% × $900,000 = $45,000. The parish records acceptance on September 2. A supplier to a subcontractor must file and record its sworn statement and send written notice to the general contractor by October 17 (45 days), and must sue on the bond within one year of September 2.

Why it works this way, and how it is asked. Public records protect people who were not at the table. A recorded notice of contract and bond tells every sub and supplier where to look for payment and tells the owner it will not pay twice. Strict deadlines then end the owner's exposure on a known date. Public property cannot be liened, so the bond and the retained funds replace the lien. This book's practice questions give one date and a role and ask for a deadline: first choose the clock (notice of termination or acceptance), then the role, then count days on a calendar.

Open the free chapter →

Questions buyers ask

How do I get it?

Pay, and the download appears on this page straight away. The links are also emailed to you. No account is required.

What if it isn't for me?

Email us within 14 days for a full refund, no questions asked.

Is the free practice going away?

No. Every practice question, the timed mock and the free chapters on this site stay free. This book is the studying half, not a gate around the free half.

More questions (9)
Can I read it on my phone?

Yes — the EPUB is for phones and e-readers, the PDF is for printing and tabbing. You get both.

What has changed on the Louisiana Contractor Business & Law exam?

Written to the LSLBC pages and rules read November 2026: 50 questions online, 70 or above to pass.

Is a study guide enough for the Louisiana Contractor Business & Law exam, or do I need a course?

A book is exam review: it does not replace any education, training or experience your licensing body requires before you may sit the exam, so check those requirements first. For the exam content itself, this 151-page guide teaches the material chapter by chapter with 100 practice questions and explanations inside, and 422 more practice questions are free on PrepPass. A prep course adds live instruction and a set schedule; whether you need one beyond any required education is your call.

What is the cheapest way to prepare for the Louisiana Contractor Business & Law exam?

Start with what costs nothing: 422 practice questions on PrepPass, with explanations and no signup. If you want it taught in one file you keep, the full study guide is $14.99 once. No subscription on any of them.

Does the Louisiana Contractor Business & Law study guide come as a PDF?

Yes — Louisiana Contractor Business and Law — Study Guide (2026) downloads as PDF and EPUB, 151 pages. The download link is emailed the moment payment clears and does not expire.

How much does the Louisiana Contractor Business & Law study guide cost?

$14.99, once. There is no subscription and no account to create; the PDF and EPUB files are yours to keep.

Are there free Louisiana Contractor Business & Law practice questions?

Yes — 422 of them, free to use with no signup and an explanation on every one. They are separate from this study guide, which is what you are buying here. The same free, no-account system also has practice modes (adaptive, new questions, spaced review of misses, weak-topic focus, saved, my mistakes); a timed mock exam (50 questions, 50 minutes) with a score report by topic; a 10-question readiness check (about 5 minutes); 11 study chapters. None of it needs this study guide.

Can I read part of the Louisiana Contractor Business & Law study guide before buying?

Yes. A full chapter is free to read on this page — not a summary of one, the chapter itself.

Is this the official Louisiana Contractor Business & Law study guide?

No. This is an independent study guide and is not affiliated with or endorsed by the exam's awarding body. It is written from La. R.S. 37:2150–2166, LSLBC rules (LAC 46:XXIX), the Private Works Act (La. R.S. 9:4801 et seq.), the Public Works Act (La. R.S. 38:2241 et seq.), the New Home Warranty Act (La. R.S. 9:3141 et seq.) and lslbc.gov, read November 2026. Always confirm current requirements with the body that issues your licence.

Why buy the book when the practice is free?

Our practice questions and timed mock stay free — nothing on the site moves behind this book. The $14.99 book is the studying half: the material itself, taught in order, in a file you own.

  • Systematic teaching — every exam section explained chapter by chapter, start to finish, not just questions
  • Print it & tab it — a paper-ready PDF you can highlight, mark up, and bring to your study table
  • Study anywhere, offline — EPUB on your phone or e-reader; no wifi, no browser tabs
  • Everything in one place — the chapters and the practice questions in one file
  • Yours for life — one-time $14.99, instant download, no subscription

Full refund policy

The details

PrepPass team · Verified against La. R.S. 37:2150–2166, LSLBC rules (LAC 46:XXIX), the Private Works Act (La. R.S. 9:4801 et seq.), the Public Works Act (La. R.S. 38:2241 et seq.), the New Home Warranty Act (La. R.S. 9:3141 et seq.) and lslbc.gov, read November 2026 · How we review
  • Verified from the official source(La. R.S. 37:2150–2166, LSLBC rules (LAC 46:XXIX), the Private Works Act (La. R.S. 9:4801 et seq.), the Public Works Act (La. R.S. 38:2241 et seq.), the New Home Warranty Act (La. R.S. 9:3141 et seq.) and lslbc.gov, read November 2026)
  • 422 free practice questions

Also free on PrepPass for Louisiana Contractor Business & Law

Beside this guide, PrepPass has a free study system for the same exam. It needs no account, and buying the guide does not unlock or change it: 422 practice questions with explanations; practice modes (adaptive, new questions, spaced review of misses, weak-topic focus, saved, my mistakes); a timed mock exam (50 questions, 50 minutes) with a score report by topic; a 10-question readiness check (about 5 minutes); 11 study chapters.

Progress is saved in your browser; a free account keeps it across devices. The readiness gauge reflects your own practice, not a prediction of the real exam result. How the practice works

One-time purchase, lifetime access to the download. The eBook is the full Louisiana Contractor Business & Law study guide in PDF and EPUB. Educational summary, not professional or legal advice — always confirm the current rules with the official source. Last updated: November 2026.