CSLB C-7 Low Voltage Systems (Trade Exam) — Study Guide

Free, topic-by-topic study notes for the CSLB C-7 Low Voltage Systems (Trade Exam) exam. Read a chapter, then practice it.

1

Job Planning and Design

Planning decides what the C-7 license may install, where the telecommunications room goes, how every cable will route, and which code and coordination problems must be solved before rough-in. CSLB weights this section at 18%. For worked examples, named traps and a full practice exam at CSLB's weights, see the PrepPass C-7 Low Voltage Systems study guide.

18%
2

Material Selection and Estimation

Choose cable, connectors, pathway and tools by category, rating and environment, then turn counts into footage, boxes, labor and a written proposal. CSLB weights this section at 15%. For worked examples, named traps and a full practice exam at CSLB's weights, see the PrepPass C-7 Low Voltage Systems study guide.

15%
3

Wire/Cable Installation and Termination

Install and support pathways, pull without damage, terminate with the right tools and keep every cable labeled. CSLB weights this section at 12%. For worked examples, named traps and a full practice exam at CSLB's weights, see the PrepPass C-7 Low Voltage Systems study guide.

12%
4

Systems Configuration and Installation

Equipment rooms, bonding, satellite, CATV, video, access control, telephone, batteries, audio, fiber, building automation and VoIP. CSLB weights this section at 16%. For worked examples, named traps and a full practice exam at CSLB's weights, see the PrepPass C-7 Low Voltage Systems study guide.

16%
5

Testing and Project Closeout

Certify cabling with the right instruments, commission systems, and turn over records, O&M data and training. CSLB weights this section at 17%. For worked examples, named traps and a full practice exam at CSLB's weights, see the PrepPass C-7 Low Voltage Systems study guide.

17%
6

System Troubleshooting, Repairs, or Replacements

Define the symptom, read the records, isolate, test, repair like for like, retest and record. CSLB weights this section at 7%. For worked examples, named traps and a full practice exam at CSLB's weights, see the PrepPass C-7 Low Voltage Systems study guide.

7%
7

Safety

Cal/OSHA's Title 8 governs the program, electrical work practices, ladders, lifts, confined spaces, dust and heat on every C-7 job. CSLB weights this section at 15%. For worked examples, named traps and a full practice exam at CSLB's weights, see the PrepPass C-7 Low Voltage Systems study guide.

15%
Report