Chapter 10 of 10

Renewable Energy Technologies: Photovoltaics and EV Chargers

For the master exam, this area asks you to lay out a system and not only wire one circuit: where the shutoffs go, how many there can be, which current method governs, and how shared conductors and shared overcurrent devices change the conductor size. The arithmetic is short, but each problem has a specific order of steps and wrong answers built from the wrong order.

EV charging at commercial sites

A master electrician is more likely to design a parking facility than a single garage charger, and the questions reflect that. For permanently connected EVSE at locations other than one- and two-family dwellings, the emergency shutoff must be readily accessible, in sight of the equipment, and placed between 20 ft and 100 ft from it. Both ends of that range are tested. Closer than 20 ft puts the person operating it next to the hazard, and beyond 100 ft is too far to be useful. When you plan a row of chargers, check the shutoff distance to every unit, not only the nearest. Receptacle-based installations have two limits that override ordinary practice. The general receptacle rating table would let a 50-ampere receptacle sit on a 40-ampere branch circuit, but Article 625 does not permit that for EVSE receptacles, and nothing about the charger current, the occupancy or added protection changes it. Every receptacle installed for EV charging also needs GFCI protection for personnel, with no carve-out by rating or location. Vehicles can now export power. A receptacle outlet that is part of electric vehicle power export equipment is limited to 250 volts single phase and 50 amperes. Larger ampere figures are tempting because they are used for other receptacle types in the same article. For outdoor fixed equipment not specifically listed and marked for the location, specify the coupling means storage at 24 in. or more above grade. The indoor figure is 18 in. above the floor, and a site plan with both indoor and outdoor units needs both heights shown correctly.

Emergency shutoff
At non-dwelling sites the shutoff is in sight of the equipment and 20 ft to 100 ft away.
2026 NEC §625.43(D)(1)
Receptacle on branch circuit
A 50-ampere EVSE receptacle is not permitted on a 40-ampere branch circuit.
2026 NEC §625.44
Power export receptacle
Export equipment receptacles are limited to 250 volts single phase and 50 amperes.
2026 NEC §625.60(B)
Coupler height
Outdoor coupling means are stored at least 24 in. above grade unless listed and marked otherwise.
2026 NEC §625.50
GFCI
All receptacles for EV charging require GFCI protection for personnel.
2026 NEC §625.54

Choosing the method for maximum PV circuit current

Every PV conductor and overcurrent decision starts from the maximum circuit current, and the Code offers more than one way to find it. The default is the 125 percent method. Add the short-circuit current ratings of the modules connected in parallel in the source circuit, then multiply by 125 percent. Three parallel modules at 12 amperes each give 36 amperes, and 36 x 1.25 = 45 amperes. The order matters: sum first, multiply second, and multiply only once at this stage. The second path is an engineered calculation. A licensed professional electrical engineer may provide a documented and stamped design that models current from simulated local irradiance. That calculation has a floor: it may not come out lower than 70 percent of the value the 125 percent method gives. If the 125 percent method produces 50 amperes, the engineered value can be no less than 50 x 0.70 = 35 amperes. On the exam, this is an optional method, and the exam ignores optional methods and exceptions unless the question raises them, just as it assumes copper conductors unless stated. So use the 125 percent method by default and reach for the 70 percent floor only when the question describes the engineered design. Rounding is permitted in this article. A result may be rounded to the nearest whole number, with a fraction under 0.5 dropped, so 12.4 becomes 12. Do not round in the middle of a multi-step problem unless the question tells you to. Carry the full value and round the final figure.

125 percent method
Maximum current is the sum of parallel module short-circuit currents times 125 percent.
2026 NEC §690.8(A)(1)(a)(1)
Engineered method floor
A stamped engineered calculation may not be less than 70 percent of the 125 percent method value.
2026 NEC §690.8(A)(1)(a)(3)
Rounding
Article 690 results may be rounded to the nearest whole number, dropping fractions below 0.5.
2026 NEC §690.4(G)

Shared conductors and shared overcurrent devices

Combining circuits saves material, but it changes what a conductor can be asked to carry during a fault. Two rules handle this and neither uses a 125 percent multiplier, which is why wrong answers on these questions usually have one added. A common-return conductor shared by several PV circuits must have an ampacity at least equal to the sum of the overcurrent device ratings of the individual circuits. With devices rated 15, 15 and 20 amperes, the return needs 50 amperes. The second rule covers one overcurrent device protecting several parallel strings. Think about a fault in one string. That string's conductor can be fed by current coming back through the shared device, up to the device rating, plus the current from each of the other strings on the same device. So each string conductor must carry the device rating plus the maximum currents of the other strings. Worked example: one 30-ampere overcurrent device protects three parallel-connected PV string circuits. Each string has a maximum current of 9 amperes. What is the minimum ampacity of each string conductor? Step 1, start with the device rating: 30 amperes. Step 2, count the other strings on the device: three strings minus the one being sized leaves two. Step 3, add their maximum currents: 9 + 9 = 18 amperes. Step 4, total: 30 + 18 = 48 amperes. Answers of 30 count only the device, 39 adds only one other string, and 27 is just the three string currents added together. For the device itself, when it is not part of an assembly listed for continuous operation at 100 percent of its rating, the minimum rating is 125 percent of the maximum current. A 16-ampere maximum current needs 16 x 1.25 = 20 amperes before rounding up to a standard size. Here the given 16 amperes is already the maximum current, so the multiplier is applied once and not twice. Placement of protection is also a design choice. PV conductors inside a building may be protected at one end only when they are no longer than 10 ft and are run in a raceway or metal-clad cable. Longer runs need a different arrangement. The dc overcurrent devices must be accessible, but they do not have to be readily accessible, which is what allows them in rooftop combiners.

Common-return conductor
Ampacity is at least the sum of the overcurrent device ratings of the circuits sharing it.
2026 NEC §690.8(C)
Strings on one device
Each string conductor carries the device rating plus the maximum currents of the other strings.
2026 NEC §690.8(D)
Device rating
A device not in a 100 percent rated assembly is rated at least 125 percent of maximum current.
2026 NEC §690.9(B)(1)
Protection at one end
Allowed inside a building for runs up to 10 ft in raceway or metal-clad cable.
2026 NEC §690.9(A)(3)
Device access
PV dc overcurrent devices must be accessible but need not be readily accessible.
2026 NEC §690.9(C)

Voltage with converters and ac modules

Module-level electronics change which circuit rules you apply. When dc-to-dc converters are wired in series, the maximum circuit voltage is found from the listing instructions. If the instructions give no method, the maximum voltage is the sum of the maximum rated output voltages of the converters in series. Four converters rated 80 volts each give 4 x 80 = 320 volts. No extra multiplier is applied in that fallback rule, and the wrong answers are 320 volts with a percentage added, or 80 volts from treating the string as one converter. An ac module is a different case. The inverter is part of the module, so the installer never handles a dc source circuit. Its output is treated as an inverter output circuit, and the PV source circuit rules do not apply. When a question describes ac modules and then offers dc circuit answers, those answers are there to catch someone who did not notice the module type.

Series converters
Without listing instructions, maximum voltage is the sum of the converters' maximum rated output voltages.
2026 NEC §690.7(B)(2)
AC module output
The output of an ac module is treated as an inverter output circuit.
2026 NEC §690.6(B)

Rapid shutdown layout and interconnection equipment

Rapid shutdown is a building-level system and the master questions are about the whole building. After initiation, controlled conductors outside the array boundary, or more than 3 ft from where they enter the building, must be at 30 volts or less within 30 seconds. The 80-volt figure that appears as a wrong answer belongs to conductors inside the array boundary. When a building has several PV systems with rapid shutdown connected to a single service, the initiation devices are limited to six, and they must be grouped. This is a coordination problem on phased projects: a later system has to fit within the count and be located with the existing devices, so plan the grouping location at the first installation. The building label showing where the initiation devices are must have a capitalized title with letters at least 3/8 in. high, in legible text that contrasts with its background. Put that dimension in the label specification so it is not left to the sign vendor. Finally, the equipment that ties a power production source in parallel with the primary source must be listed for the interactive function, or evaluated for it and field labeled. A utility interconnection approval is a separate matter and does not satisfy this requirement. Equipment intended only for stand-alone use is not suitable for parallel operation.

Voltage after shutdown
Controlled conductors outside the array boundary reach 30 volts or less within 30 seconds.
2026 NEC §690.12(B)(1)
Multiple systems
On a single service, initiation devices are limited to six and must be grouped.
2026 NEC §690.12(C)(3)
Label lettering
The label title is in capitals at least 3/8 in. high.
2026 NEC §690.12(D)
Interactive equipment
Interconnection equipment must be listed or field labeled for the interactive function.
2026 NEC §705.2

Keep going: the full Texas Master Electrician (TDLR / PSI, 2026 NEC) guide covers every section of the exam. Texas Master Electrician Exam — Open-Book Study Guide (2026 NEC) — PDF + EPUB, $14.99 · 14-day refund →

Want the dense 47-page printable for exam week? Texas Master Electrician (TDLR / PSI, 2026 NEC) cheat sheet PDF — $9.99 →

Studying in order?

Practice stays free. The full Texas Master Electrician (TDLR / PSI, 2026 NEC) study guide is the material itself, taught start to finish — a downloadable PDF + EPUB you keep.

Get the book — $14.99