Services, Service Equipment and Separately Derived Systems
A master designs the service instead of installing one that someone else sized. That means carrying a calculated load through to conductor ampacity, choosing and marking the service equipment, and laying out a grounding and bonding scheme in which every conductor is sized from the right table. The questions in this area reward a fixed order of work, because most wrong answers are a correct number taken from the wrong step.
From calculated load to service conductors
Start with current. Divide the calculated volt-amperes by the voltage for single-phase, so 27,600 VA at 240 volts is 115 amperes. For three-phase, divide by 1.732 times the voltage, so 90,000 VA at 208 volts is 250 amperes. If motors are part of a commercial service, add 25 percent of the largest motor's full-load current on top of the motor loads. For a 65-ampere motor that is 16.25 amperes. Service-entrance conductors then have to pass two separate tests, and you should treat them as two calculations. The first is the continuous load test: ampacity of at least the noncontinuous load plus 125 percent of the continuous load. Worked example: the conductors supply 96 amperes of continuous lighting, 24 amperes of continuous sign load and 70 amperes of noncontinuous load, and the equipment is not listed for 100 percent operation. Step 1, total the continuous load: 96 + 24 = 120 amperes. Step 2, apply 125 percent: 1.25 x 120 = 150 amperes. Step 3, add the noncontinuous load: 70 + 150 = 220 amperes. That is the minimum ampacity before any adjustment or correction. Adding the loads with no factor gives 190, and applying the factor to everything gives 237.5. The second test looks at what is left after adjustment and correction: the reduced ampacity must still cover the maximum load. With a 176-ampere load and a 0.88 temperature correction, the table ampacity must be at least 176 / 0.88 = 200 amperes. For a dwelling, the 83 percent allowance applies: a 200-ampere service needs 166 amperes of conductor, and 2/0 copper at 175 amperes in the 75 degrees C column is the smallest that qualifies.
Optional methods and the loads behind the service size
PSI's stated rule is that optional methods and exceptions are ignored unless the question asks for them, and that conductors are copper unless stated. Master questions do ask for the optional methods, by name, so know their shape. For a one-family dwelling, the optional method gathers the general loads and takes the first 8 kVA at 100 percent and the remainder at 40 percent. A 40,000 VA general load becomes 8,000 + 12,800 = 20,800 VA. Central electric space heating enters at 65 percent of nameplate, while the 40 percent heating figure is reserved for four or more separately controlled units. Adding load to an existing dwelling uses the same split for the existing load: first 8 kVA at 100 percent, remainder at 40 percent. The multifamily optional method is available only for three or more dwelling units that meet its conditions, including a single feeder per unit and electric cooking. It multiplies the connected load by one demand factor from the table, and the factor falls as the unit count rises: 900,000 VA at 32 percent is 288,000 VA. Two standard-method items also feed the service size. A dryer is taken at its nameplate or 5,000 VA, whichever is larger, so a 4 kW dryer counts as 5,000 VA. The neutral may take 70 percent of the part of its load above 200 amperes, so 250 amperes becomes 200 + 35 = 235.
Service equipment: disconnects, protection and markings
Once the size is known, the equipment questions begin. A service may have up to six disconnecting means, each in its own enclosure, section or compartment. A one-family dwelling disconnect is rated at least 100 amperes whatever the calculation produced. Ground-fault protection of equipment on the service has three limits worth memorizing as a set. The setting may not exceed 1200 amperes. For ground-fault currents of 3000 amperes or more the time delay may not exceed one second, which keeps a high-level arcing fault from burning on. And when the system is first installed on site it must be performance tested by primary current injection, by qualified persons following the equipment instructions, with a written record available to the authority having jurisdiction. Markings are a design deliverable. Service equipment at other than dwelling units must be field marked with the available fault current and the date the calculation was performed, so equipment ratings can be checked against it. Separately, service and feeder-supplied equipment likely to be worked on while energized, again outside dwelling units, needs a permanent arc-flash marking. Overhead clearances still matter at this level: 18 feet over public streets, alleys and roads, and 12 feet over a residential driveway not subject to truck traffic.
The grounding electrode system and its conductor
System grounding has a stated purpose: to limit the voltage imposed by lightning, line surges or accidental contact with higher-voltage lines, and to stabilize voltage to earth in normal operation. The electrode minimums are the same ones a journeyman learns. A metal underground water pipe needs 10 feet or more in direct contact with the earth. A concrete-encased electrode needs 20 feet of 1/2 inch or larger rebar or bare 4 AWG copper, and tied pieces of rebar may be added together to reach it. A rod has 8 feet in contact with the soil, two rods are at least 6 feet apart, and a single rod is supplemented unless it measures 25 ohms or less. The grounding electrode conductor comes from Table 250.66, read by the ungrounded service conductor size. For copper: 1 or 1/0 AWG takes 6 AWG, 2/0 or 3/0 takes 4 AWG, over 350 through 600 kcmil takes 1/0, and over 600 through 1,100 kcmil takes 2/0. Then apply the caps: never larger than 6 AWG copper to a rod, pipe or plate alone, and never larger than 4 AWG copper to a concrete-encased electrode alone.
One bonding table, four jobs
Table 250.102(C)(1) sizes four different conductors at the service, and the exam asks about each as if it were a separate topic: the main bonding jumper, the minimum grounded service conductor, supply-side bonding jumpers, and the bonding jumper to metal water piping. Enter the table with the ungrounded service conductor size every time. For copper, 2/0 or 3/0 calls for 4 AWG, over 3/0 through 350 kcmil calls for 2 AWG, over 350 through 600 kcmil calls for 1/0, and over 600 through 1,100 kcmil calls for 2/0. The reason the grounded conductor has a minimum here is that it is the fault return path to the utility. Even if the calculated neutral load is small, the grounded service conductor for 250 kcmil copper phases cannot be smaller than 2 AWG. Watch the 1,100 kcmil boundary. Exactly 1,100 kcmil is still in the table and takes 2/0. Above it, the main bonding jumper must have at least 12.5 percent of the phase conductor area: 1,500 kcmil needs 187.5 kcmil, so 4/0 at 211.6 kcmil, and 2,000 kcmil needs 250 kcmil. Where the jumper is a screw, it has a green finish visible after installation.
Separately derived systems
A transformer secondary is a new system and needs its own bonding and grounding, sized from its own derived conductors. Keep three conductors apart. The system bonding jumper ties the grounded conductor to the equipment grounding path and the enclosure. The supply-side bonding jumper runs with the derived conductors between the source and the first disconnect. Both are sized from Table 250.102(C)(1): 250 kcmil copper derived conductors call for 2 AWG, and 600 kcmil call for 1/0. The grounding electrode conductor is the third, and it alone goes to the electrode. It is sized from Table 250.66, so 3/0 copper derived conductors need 4 AWG. The 6 AWG figure applies only where that conductor reaches nothing but a rod, pipe or plate. Where several derived systems share one wire-type common grounding electrode conductor, it is not smaller than 3/0 AWG copper. The 250 kcmil value is for aluminum, and taps to each system are sized separately. Secondary conductors themselves are often unprotected at the transformer. Under the 10-foot secondary rule they may run without overcurrent protection at the secondary only if their ampacity is at least the calculated load and at least the rating of the equipment or overcurrent device they supply.
Keep going: the full Texas Master Electrician (TDLR / PSI, 2026 NEC) guide covers every section of the exam. Texas Master Electrician Exam — Open-Book Study Guide (2026 NEC) — PDF + EPUB, $14.99 · 14-day refund →
Want the dense 47-page printable for exam week? Texas Master Electrician (TDLR / PSI, 2026 NEC) cheat sheet PDF — $9.99 →

Practice stays free. The full Texas Master Electrician (TDLR / PSI, 2026 NEC) study guide is the material itself, taught start to finish — a downloadable PDF + EPUB you keep.