Load & DesignPregunta 22 de 110
What is the main benefit of properly sizing equipment to a load calculation rather than oversizing?
a.Faster refrigerant charging
b.Better humidity control, comfort, and energy efficiency
c.Elimination of the need for a permit
d.Higher supply air velocity
Explicación
Right-sized equipment runs longer, steadier cycles that dehumidify effectively and hold temperature evenly, improving comfort and efficiency. Oversizing wastes energy through short cycling and leaves the space humid. This aligns with Title 24 efficiency goals.
Referencia Legal: California Energy Code (Title 24)Practica las 110 preguntas gratis — sin registro.
Preguntas relacionadas de este tema
- Air velocity in a duct is calculated by dividing airflow (CFM) by what?
- A branch duct must deliver 200 CFM at a velocity of about 600 feet per minute. Approximately what free area is required?
- Under California energy standards, duct leakage in many new and altered systems must be verified by which method?
- Which condition would a technician correct by performing an accurate load calculation instead of using a rule of thumb like square footage per ton?
- Latent load in a cooling calculation refers to the energy required to do what?
- A 3-ton system is selected for a home. At 400 CFM per ton, what is the target blower airflow?
Última revisión: · proceso editorial
Equipo Editorial de PrepPass · Verificado con California CSLB C-20 Warm-Air HVAC Trade Exam · Cómo revisamos