CSLB C-39 Roofing (Trade Exam) Exam Cheat Sheet (2026)

A free, printable CSLB C-39 Roofing (Trade Exam) exam cheat sheet: the 31 highest-yield points to know, grouped into 5 sections that follow the exam's content areas, each section with its published weight.

  • Free to read, print and keep — no signup, no email, no paywall.
  • 31 of the 31 points carry a citation to the rule they come from.
  • The real CSLB C-39 Roofing (Trade Exam) exam: 210 minutes.
  • Prints from your browser (Ctrl-P, or Cmd-P on a Mac) — the navigation, buttons and links drop out of the printed copy.
  • 100 free CSLB C-39 Roofing (Trade Exam) practice questions on the same material, every one explained.
  • Last updated: September 2026.
Studying in order?

Practice stays free. The full CSLB C-39 Roofing study guide is the material itself, taught start to finish — a downloadable PDF + EPUB you keep.

Get the book — $24.99

Planning and Estimating

22% of the exam
Study →
Membrane roofs
Built-up, modified bitumen, single-ply, spray foam and liquid-applied roofs need at least 1/4:12 for drainage; coal-tar built-up may be 1/8:12.· 2025 CRC R905.9–R905.14
Shingles and tile
Asphalt shingles need 2:12 and clay or concrete tile 2-1/2:12, each with double underlayment up to 4:12.· 2025 CRC R905.2.2, R905.3.2
Slate and wood
Slate needs 4:12; wood shingles, wood shakes and metal roof shingles need 3:12.· 2025 CRC R905.4.2, R905.6.2, R905.7.2, R905.8.2
Class C reroof trigger
More than 50 percent of the roof replaced within one year: the entire covering must be at least Class C.· 2025 CRC R902.1.2
Fire zones
Roofs in Fire Hazard Severity Zones or the WUI need a Class A assembly.· 2025 CWUIC 504.2
Nonresidential energy trigger
Alterations of more than 50 percent of the roof or 2,000 sq ft, whichever is less.· 2025 Energy Code 141.0(b)2B
Slope factor
Square root of (144 + rise squared), divided by 12; 6:12 is about 1.118.· Roofing math
Drip edge laps
Adjacent pieces overlap at least 2 inches.· 2025 CRC R905.2.8.5
Attic ventilation
Net free area of 1/150 of the vented space, or 1/300 when the code's conditions are met.· 2025 CRC R806.2

Job Site Preparation

13% of the exam
Study →
Walkways
Pedestrian walkways at least 4 feet wide; construction railings at least 42 inches high.· 2025 CBC 3306.2, 3306.4
Kettle location
At least 20 feet from combustibles and building openings; never inside or on the roof.· 2025 CFC 303.2
Overhead lines
Treat every overhead conductor as energized until the owner verifies and visibly grounds it.· Cal. Code Regs. tit. 8 §2946(d)
Two-layer limit
No recover where the roof already has two or more applications of any covering.· 2025 CRC R908.4
Reuse
Undamaged slate or tile may be reinstalled; aggregate surfacing may not.· 2025 CRC R908.5
Asbestos roofing
Remove intact where feasible, use wet methods, never drop or throw, and lower by the end of the shift.· Cal. Code Regs. tit. 8 §1529

Low-Slope Roof Projects

17% of the exam
Study →
Overflows
Overflow drains match the primary size with the inlet 2 inches above the low point; overflow scuppers are three times the drain size and at least 4 inches high.· 2025 CRC R903.4.1
Edge metal
Metal edge systems on built-up, modified bitumen and single-ply roofs are tested to ANSI/SPRI ES-1.· 2025 CBC 1504.6
Spray foam coating
Applied not less than 2 hours nor more than 72 hours after the foam.· 2025 CRC R905.13.3
Recoating
A protective coating may go over an existing single-ply, built-up, modified bitumen, metal or spray foam roof without tear-off.· 2025 CRC R908.4

Steep-Slope Roof Projects

26% of the exam
Study →
Single layer
At 4:12 and steeper, one layer applied shingle fashion and lapped 2 inches; end laps 4 inches offset 6 feet.· 2025 CRC Table R905.1.1(2)
Sidewall flashing
At least 4 inches high and 4 inches wide, vertical leg under the siding.· 2025 CRC R905.2.8.3
Kickout
Divert water where the eave of a sloped roof meets a vertical sidewall.· 2025 CRC R903.2.1
Shingle nails
12-gage shank, 3/8-inch head, 3/4 inch into the sheathing or through it.· 2025 CRC R905.2.5
Tile nails
11-gage, 5/16-inch head.· 2025 CRC R905.3.7
Slate
Two fasteners per slate; headlap 4, 3 or 2 inches depending on slope.· 2025 CRC R905.6.6

Safety

22% of the exam
Study →
Tailgate meetings
At least every 10 working days.· Cal. Code Regs. tit. 8 §1509(e)
Heat
Shade present above 80°F; high-heat procedures at 95°F.· Cal. Code Regs. tit. 8 §3395
Hot buckets
Never carried on ladders; carrying buckets no larger than 6 gallons.· Cal. Code Regs. tit. 8 §§1725, 1729
Residential roofing
Slopes through 7:12: protection at a fall distance of 6 feet or more; steeper than 7:12: regardless of height.· Cal. Code Regs. tit. 8 §1731(c)
Other roofing
Roofs more than 20 feet high; warning lines 34 to 45 inches high, at least 5 feet from the edge.· Cal. Code Regs. tit. 8 §1730(b)
Fall arrest
Free fall no more than 6 feet; maximum arresting force 1,800 pounds with a harness.· Cal. Code Regs. tit. 8 §1670(b)(11)

Now prove you know them

Reading an outline is not the same as recalling it under exam pressure. Drill the free CSLB C-39 Roofing (Trade Exam) questions to find the areas you keep missing, then sit a full timed mock.

Study aid, not a substitute for the official material — always confirm the current rule with CSLB — C-39 study guide (13E-39).