A licensed contractor's required workers' compensation coverage lapses. What is the direct consequence?
Explicación
B&P §7125.2 suspends the license automatically, by operation of law, effective on the earlier of the date the coverage lapsed or the date coverage was required to be obtained; work performed during the suspension is unlicensed work, with the §7031 collection bar and disgorgement exposure that follows. (d) borrows the 90 days from §7071.7, which lets the Registrar accept a BOND as of its effective date if it arrives within 90 days — there is no such grace period for insurance. (b) is the no-harm-no-foul belief, and the suspension does not wait for an injury. (c) is not a remedy anywhere in the chapter.
Referencia Legal: B&P Code §7125.2(a)Practica las 1632 preguntas gratis — sin registro.
Own the complete CSLB Law & Business guide — PDF + EPUB, $24.99 →
Preguntas relacionadas de este tema
- The 20 days for serving a preliminary notice run from the date the claimant:
- Which of the following is the BEST reason a general contractor requires subcontractors to name it as an additional insured and provide certificates of insurance?
- A contractor illegally carries no workers' compensation insurance and an employee is injured. The employee may:
- A material supplier who furnishes materials to a subcontractor (not to the owner directly) preserves its mechanics lien rights by serving a preliminary notice on:
- A performance bond on a construction project primarily guarantees to the obligee that:
- Which of the following is generally NOT covered by a standard Commercial General Liability policy?
Última revisión: · proceso editorial