公共工程第 1600 / 1605 题
DIR public works contractor registration generally must be:
a.Waived for licensed contractors
b.Obtained once and never renewed
c.Renewed periodically (annually) and kept current to bid and work on covered public works
d.Obtained only after the project is complete
解析
Labor Code §1725.5 requires DIR public works registration to be maintained on a current basis (renewed on the annual cycle) for a contractor to bid on, be listed on a bid for, and perform covered public works. A lapse can disqualify the contractor.
法律依据: Labor Code §1725.5免费刷完整 1605 道题库 — 无需注册。
同考点相关题目
- A contractor on a public works project willfully fails to produce certified payroll records after proper written request. The contractor may face:
- On a federal public works project, the prevailing wage requirement comes primarily from the:
- The performance bond on a public works project protects the:
- A subcontractor on a public works project is not paid. To make a claim on the prime contractor's payment bond, the subcontractor generally must:
- When calculating whether it has met the prevailing wage obligation, a contractor may generally credit:
- On a public works project, the prevailing wage obligation applies to: