SeguridadPregunta 1347 de 1605
Which practice reduces electrical shock hazards from temporary jobsite wiring?
a.Splicing cords with tape
b.Removing the ground pin from plugs
c.Overloading circuits
d.Using GFCI protection and keeping cords out of water and walkways
Explicación
GFCI protection, undamaged grounded cords, and keeping cords clear of water and traffic reduce shock and trip hazards. Removing ground pins or splicing cords creates dangerous conditions.
Referencia Legal: 29 CFR 1926.404Practica las 1605 preguntas gratis — sin registro.
Preguntas relacionadas de este tema
- OSHA requires the employer to instruct each employee in:
- A contractor with 3 employees insists it is 'too small' to need any safety program. The correct response is:
- On a steep-slope roof, workers 6 feet or more above a lower level must be protected by:
- In California, the trench cave-in protection requirement mirrors federal OSHA, applying protective systems at depths of:
- California law adds a special requirement for trenches or excavations 5 feet or more deep into which a person must descend: a detailed plan for worker protection must be prepared when the trench is:
- Certain high-hazard construction work — trenches 5 feet or deeper requiring shoring, and construction of structures more than three stories or 36 feet high — requires the contractor to obtain what from Cal/OSHA before starting?
Última revisión: · proceso editorial
Sen Lin, Fundador de PrepPass · Verificado con California CSLB Contractor License Law & Business Exam · Cómo revisamos
Revisado por Abraham Chen — Licensed California General Contractor (CSLB License #1101856 — verificar)