A licensed contractor's required workers' compensation coverage lapses. What is the direct consequence?
a.The license is suspended by operation of law
b.Nothing happens at all, unless someone is injured
c.The license fee is refunded for the uncovered period
d.A 90-day grace period runs, with no consequence
解析
B&P §7125.2 suspends the license automatically, by operation of law, effective on the earlier of the date the coverage lapsed or the date coverage was required to be obtained; work performed during the suspension is unlicensed work, with the §7031 collection bar and disgorgement exposure that follows. (d) borrows the 90 days from §7071.7, which lets the Registrar accept a BOND as of its effective date if it arrives within 90 days — there is no such grace period for insurance. (b) is the no-harm-no-foul belief, and the suspension does not wait for an injury. (c) is not a remedy anywhere in the chapter.
法律依据: B&P Code §7125.2(a)免费刷完整 1632 道题库 — 无需注册。
Own the complete CSLB Law & Business guide — PDF + EPUB, $24.99 →
同考点相关题目
- The 20 days for serving a preliminary notice run from the date the claimant:
- Which of the following is the BEST reason a general contractor requires subcontractors to name it as an additional insured and provide certificates of insurance?
- A contractor illegally carries no workers' compensation insurance and an employee is injured. The employee may:
- A material supplier who furnishes materials to a subcontractor (not to the owner directly) preserves its mechanics lien rights by serving a preliminary notice on:
- A performance bond on a construction project primarily guarantees to the obligee that:
- Which of the following is generally NOT covered by a standard Commercial General Liability policy?