What is the most characteristic earthquake failure of an unreinforced masonry (URM) bearing wall building?

  • a.Ground-story columns hinge because an open tuck-under parking level is far too flexible
  • b.Steel beam flanges fracture at welded connections to the columns
  • c.Walls and parapets fall outward because they are not tied to the floors and roof✓
  • d.Roof collectors buckle because the diaphragm is too stiff and strong

URM walls have little out-of-plane strength and, in older buildings, joists simply bear in wall pockets with no positive anchorage, so walls and parapets peel away and floors lose support. Weld fracture is a steel moment frame problem, and open-front weak stories are typical of wood apartment buildings.

Seismic Vulnerability and Improvement of Structural Systems

Which retrofit measure most directly addresses the main life-safety hazard of an unreinforced masonry building?

  • a.Replacing roofing with a heavier concrete tile system
  • b.Removing interior wood partitions to reduce the building's seismic weight
  • c.Installing wall-to-diaphragm tension anchors and bracing parapets✓
  • d.Adding ornamental masonry veneer to exterior walls

Tension and shear anchors tie the walls to the floor and roof diaphragms, and braced or shortened parapets stop the most common falling hazard. Heavier roofing adds seismic mass, veneer adds another falling hazard, and wood partitions actually contribute some damping and resistance.

Seismic Vulnerability and Improvement of Structural Systems

In the 1971 San Fernando and 1994 Northridge earthquakes, many tilt-up concrete buildings with wood roofs suffered partial roof collapse. What was the primary cause?

  • a.Failure of the wall-to-roof anchorage and lack of continuous crossties✓
  • b.Bearing failure of the soil beneath the panel footings
  • c.Fracture of the anchor bolts at the steel column bases
  • d.Crushing of the concrete wall panels under in-plane shear and overturning forces

Walls pulled away from the roof where ledgers were loaded in cross-grain bending or anchors were too weak, and without continuous ties across the diaphragm the roof framing lost support. These failures produced today's wall anchorage, subdiaphragm and crosstie rules in ASCE 7-16 Section 12.11.2. In-plane panel shear capacity was rarely the problem.

Seismic Vulnerability and Improvement of Structural Systems

Why are pre-1970s nonductile concrete frame buildings considered a collapse risk?

  • a.The frames were designed for wind loads larger than modern seismic loads
  • b.Excessive confinement steel makes the columns far too stiff to dissipate seismic energy
  • c.Their lightweight floors attract higher forces than modern concrete floors
  • d.Widely spaced column ties allow brittle shear failure and loss of gravity support✓

Older concrete columns typically have widely spaced ties with 90-degree hooks and lap splices in hinge zones, so they fail in shear or lose confinement before flexural yielding and can no longer carry gravity load. The problem is too little transverse steel, not too much, as the 1971 Olive View Hospital damage showed.

Seismic Vulnerability and Improvement of Structural Systems

Which retrofit technique increases the shear strength and confinement of an existing nonductile concrete column?

  • a.Cutting the column free from the adjacent masonry infill walls only
  • b.Jacketing the column with steel or fiber-reinforced polymer✓
  • c.Adding a suspended ceiling around the column capital
  • d.Painting the column with an intumescent fire coating

Steel, concrete or FRP jackets add transverse confinement and shear capacity, letting the column deform without brittle failure. Separating a column from partial-height infill can relieve a short-column condition but does not add confinement by itself, and coatings or ceilings have no structural effect.

Seismic Vulnerability and Improvement of Structural Systems

A multi-story wood apartment building has open parking at the ground level along one side. What seismic deficiency is typical of this configuration?

  • a.Excessive redundancy in the ground-story wall lines
  • b.An overly stiff ground story that attracts hail damage
  • c.A roof diaphragm that is too flexible to span at all
  • d.A soft, weak first story prone to sidesway collapse✓

Open-front 'tuck-under' buildings have far less wall at the ground story than above, concentrating drift there; the Northridge Meadows collapse is the well-known example. Retrofits add steel moment frames, cantilever columns or new shear walls at the open line. The deficiency is too little stiffness and strength, not too much.

Seismic Vulnerability and Improvement of Structural Systems

Welded steel moment frames built before 1994 performed unexpectedly in the Northridge earthquake. What was observed?

  • a.Brittle fractures at beam-to-column welded flange connections✓
  • b.Shear failure of floor slabs around the column perimeters
  • c.Widespread ductile hinging of beams well away from the joints
  • d.Global buckling of columns from excessive gravity loading

Inspection after Northridge found brittle fractures starting at the beam bottom flange weld root, with little of the expected ductile hinging. The findings led to the FEMA/SAC studies, tougher weld filler metals and prequalified connections such as the reduced beam section.

Seismic Vulnerability and Improvement of Structural Systems

An older house has short wood-framed cripple walls between the foundation and the first floor. Which retrofit is standard for this condition?

  • a.Replacing the cripple walls with unreinforced brick masonry
  • b.Removing the sill plate so that the house can slide freely
  • c.Sheathing the cripple walls with plywood and bolting the sill plate✓
  • d.Adding a second story to increase the gravity precompression on the walls

Unbraced cripple walls rack and unbolted sills slide off the foundation. Wood structural panel sheathing on the cripple walls plus anchor bolts (or retrofit foundation plates) completes the load path to the foundation. Brick would add a brittle element, and adding a story increases the demand.

Seismic Vulnerability and Improvement of Structural Systems

After an earthquake, a building is posted with a yellow ATC-20 placard. What does the placard mean?

  • a.Unsafe: do not enter or occupy except as authorized by the jurisdiction
  • b.Condemned: the building has been ordered demolished by the owner
  • c.Restricted Use: entry or occupancy is limited as stated on the placard✓
  • d.Inspected: no apparent hazard and lawful occupancy is permitted

ATC-20 uses three postings: green INSPECTED, yellow RESTRICTED USE and red UNSAFE. Yellow means specific restrictions on entry, occupancy or particular areas are written on the placard. No ATC-20 placard is a demolition order; even a red tag only restricts entry pending further evaluation.

Seismic Vulnerability and Improvement of Structural Systems

Under ATC-20, what does a red UNSAFE placard signify?

  • a.The building may be occupied by the owner but not by tenants
  • b.The building may not be entered or occupied except as authorized✓
  • c.The building has been inspected and may be lawfully occupied without limits
  • d.The building must be demolished within thirty calendar days

A red UNSAFE posting means there is an extreme hazard or the building may collapse, so entry is prohibited except as specifically authorized by the jurisdiction. It is not a demolition order: many red-tagged buildings are later repaired. Lawful occupancy corresponds to the green INSPECTED placard.

Seismic Vulnerability and Improvement of Structural Systems

In the ATC-20 procedure, what is the purpose of the Rapid Evaluation?

  • a.To determine insurance settlement amounts for the owners
  • b.To prepare repair drawings and a construction cost estimate
  • c.To quickly post obviously safe and obviously unsafe buildings✓
  • d.To perform a nonlinear analysis of the damaged structure

The Rapid Evaluation is a brief exterior-focused screening that sorts buildings into apparently safe, obviously unsafe, and doubtful cases; doubtful ones are referred to a Detailed Evaluation, and some then to an Engineering Evaluation commissioned by the owner. Repair design and analysis happen after, not during, safety evaluation.

Seismic Vulnerability and Improvement of Structural Systems

During an ATC-20 Detailed Evaluation, which observation in a concrete frame building most strongly suggests an UNSAFE posting?

  • a.Displaced ceiling tiles in one interior corridor
  • b.Hairline cracks in the plaster of nonstructural partitions
  • c.A toppled bookshelf in a second-floor office
  • d.Columns with wide diagonal cracks and visibly buckled bars✓

Severe diagonal (shear) cracking and buckled longitudinal bars mean the columns have lost much of their gravity and lateral capacity, a collapse hazard in aftershocks. Plaster cracks, fallen ceiling tiles and overturned contents are nonstructural damage; they may call for restricting an area but do not threaten the vertical load path.

Seismic Vulnerability and Improvement of Structural Systems

Several precast concrete parking structures collapsed in the Northridge earthquake. Which deficiency was a principal contributor?

  • a.Gravity framing and connections that could not tolerate the lateral drift✓
  • b.Foundations that were supported on rock rather than on soil
  • c.Shear walls that were far stronger and stiffer than the design forces required
  • d.Use of cast-in-place topping slabs with too much reinforcing steel

Gravity columns and precast connections that were not part of the lateral system could not accommodate the drift, and thin toppings with brittle mesh and weak collectors could not deliver forces to the walls. The lesson is the deformation compatibility requirement of ASCE 7-16 Section 12.12.5 and stronger collector and diaphragm provisions.

Seismic Vulnerability and Improvement of Structural Systems

A concrete column is restrained over part of its height by a partial-height masonry infill wall. Why is this a seismic vulnerability?

  • a.The column becomes too flexible to attract any lateral load
  • b.The infill prevents the column from carrying the gravity load
  • c.The shortened clear height makes the column stiffer and shear-critical✓
  • d.The infill wall removes all of the axial load and bending from the column

A 'captive' or short column has a reduced free height, so it is much stiffer, attracts more shear, and reaches its shear capacity before it can yield in flexure. The failure is brittle. Remedies include isolating the infill with a gap or jacketing the column; the infill does not relieve the column's axial load.

Seismic Vulnerability and Improvement of Structural Systems

Two adjacent buildings with floors at different elevations are built with almost no gap between them. What earthquake hazard does this create?

  • a.Resonance that cancels out the motion of both of the buildings
  • b.Uplift of both buildings caused by negative pore water pressure in the soil
  • c.Liquefaction of the soil that lies between the two foundations
  • d.Pounding, with one building's floor slabs striking the other's columns✓

Buildings with different periods move out of phase and collide if the separation is too small; when floor levels do not align, slabs hit columns at mid-height, which can cause column shear failure. ASCE 7-16 Section 12.12.3 addresses this with minimum separations based on inelastic displacements.

Seismic Vulnerability and Improvement of Structural Systems

Which is the most effective global strategy for retrofitting a flexible, nonductile concrete frame building?

  • a.Adding new concrete shear walls to limit drift and take the lateral load✓
  • b.Lengthening the period by cutting existing columns at midheight
  • c.Removing floor diaphragm topping slabs to reduce the building's lateral stiffness
  • d.Replacing interior doors with heavier fire-rated door assemblies

New shear walls (or braced frames) with adequate foundations and collectors stiffen the building, reduce drift on the brittle existing frames, and provide a ductile lateral system. Weakening diaphragms or cutting columns destroys the load path, and architectural changes do nothing for seismic performance.

Seismic Vulnerability and Improvement of Structural Systems

When a tilt-up building's roof-to-wall connections are retrofitted, why are continuous crossties added across the roof diaphragm?

  • a.To reduce the wind uplift demand on the roof sheathing nails at edges
  • b.To raise the gravity load capacity of the roof framing for new mechanical equipment
  • c.To carry wall anchorage forces across the building so framing does not pull apart✓
  • d.To stiffen the wall panels against in-plane shear between panel joints

Out-of-plane wall forces must be developed into the diaphragm; continuous ties between diaphragm chords (ASCE 7-16 Section 12.11.2.2.1) keep purlins, girders and their splices from separating. They are a load path element for anchorage forces, not a gravity, wall in-plane or wind uplift upgrade.

Seismic Vulnerability and Improvement of Structural Systems

A pre-1933 California school building of unreinforced brick would be regulated differently if rebuilt today mainly because of which historic event?

  • a.The 1994 Northridge earthquake and hospital legislation of that year
  • b.The 1989 Loma Prieta earthquake and the Seismic Hazards Mapping Act
  • c.The 1906 San Francisco earthquake and the Alquist-Priolo Act
  • d.The 1933 Long Beach earthquake, which led to the Field Act✓

Severe damage to unreinforced masonry schools in the 1933 Long Beach earthquake led California to enact the Field Act, requiring state-supervised design and construction of public schools, and the Riley Act for other buildings. The Alquist-Priolo Act (fault zoning) followed the 1971 San Fernando earthquake, not 1906.