PrepPass team · Verified against CSLB — Class A study guide (13E-A) · How we review

Free · printable · no signup

CSLB Class A — General Engineering (Trade Exam) Exam Cheat Sheet (2026)

A free, printable CSLB Class A — General Engineering (Trade Exam) exam cheat sheet: the 53 highest-yield points to know, grouped into 8 sections that follow the exam's content areas, each section with its published weight.

  • Free to read, print and keep — no signup, no email, no paywall.
  • 53 of the 53 points carry a citation to the rule they come from.
  • The real CSLB Class A — General Engineering (Trade Exam) exam: 210 minutes.
  • Prints from your browser (Ctrl-P, or Cmd-P on a Mac) — the navigation, buttons and links drop out of the printed copy.
  • 100 free CSLB Class A — General Engineering (Trade Exam) practice questions on the same material, every one explained.
  • Last updated: September 2026.
Studying in order?

Practice stays free. The full CSLB Class A — General Engineering (Trade Exam) study guide is the material itself, taught start to finish — a downloadable PDF + EPUB you keep.

Get the book — $24.99

Planning and Estimating

15% of the exam
Study →
Order of precedence (Caltrans)
Special provisions, then project plans, then standard specifications, revised standard plans and standard plans.· Caltrans Standard Specifications 2025, 5-1.02
Written over scaled
Written numbers and notes on a drawing govern over graphics; a detail governs over a general drawing.· Caltrans Standard Specifications 2025, 5-1.02
Stationing
One station is 100 feet; 12+50 is 1,250 feet from the start of the alignment.· Caltrans Standard Specifications 2025, abbreviations
Delineate
Mark the proposed excavation in white before calling.· Gov. Code 4216, 4216.2
Notice
At least two working days and not more than 14 calendar days before digging; the call day does not count.· Gov. Code 4216.2(b)
Ticket life
A ticket is valid for 28 days and must be renewed by the end of the 28th day.· Gov. Code 4216.2(e)
Conversions
27 cubic feet = 1 cubic yard; 43,560 square feet = 1 acre; 1 cubic foot is about 7.48 gallons.· NIST Handbook 44, Appendix C
Bid items
Unit-price items are paid on measured quantities; lump-sum items carry the quantity risk.· Caltrans Standard Specifications 2025, definitions
Critical path
Only delays on the critical path, or beyond an activity's float, move completion.· Caltrans Standard Specifications 2025, definitions

Structural Principles

6% of the exam
Study →
Concrete weight
Caltrans customarily uses 150 pcf for normal concrete when computing falsework dead load.· Caltrans Falsework Manual, Ch. 3
Minimum design load
Formwork and shoring are designed for at least 100 psf of combined dead and live load.· Cal. Code Regs. tit. 8, 1717
Horizontal load
Falsework bracing resists at least 2% of the supported weight horizontally.· Caltrans Falsework Manual, Ch. 3
Load path
A series of connected elements that deliver loads to the foundation.· FEMA P-749
Liquefaction
Occurs only in saturated, loose, granular soils; buried structures can float.· FEMA P-749
Soft story
A story much weaker and less stiff than those above is a seismic irregularity.· FEMA P-749

Earthwork and Surveying

15% of the exam
Study →
Benchmarks
Stable, permanent and, where possible, outside the construction area.· Caltrans Surveys Manual, Ch. 8
Slope stakes
Reference points are offset from the catch point, generally 10 to 20 feet.· Caltrans Surveys Manual, Ch. 12
Lift thickness
Caltrans limits ordinary embankment lifts to 8 inches loose.· Caltrans Standard Specifications 2025, 19-6.03C
Relative compaction
95% in the structural zone under roadways; 90% in other embankment areas.· Caltrans Standard Specifications 2025, 19-5
Plasticity index
Liquid limit minus plastic limit.· FHWA NHI-06-088
SPT N-value
Blows for the second and third 6-inch increments of a 140-pound hammer falling 30 inches.· FHWA NHI-06-088
Expansive clay
Swells and shrinks with seasonal moisture, mostly in the upper 3 to 10 feet.· FHWA NHI-06-088

Subsurface, Surface, and Elevated Piping Work

21% of the exam
Study →
Maximum slopes
Type A 3/4:1, Type B 1:1, Type C 1-1/2:1 for excavations under 20 feet.· Cal. Code Regs. tit. 8, 1541.1 App. B
Egress
Ladders or ramps in trenches 4 feet or deeper, within 25 feet of lateral travel.· Cal. Code Regs. tit. 8, 1541
Spoil
At least 2 feet back from the edge.· Cal. Code Regs. tit. 8, 1541
Tolerance zone
24 inches each side of the marks; expose facilities by hand or approved vacuum before machines dig there.· Gov. Code 4216, 4216.4
Water main separation
10 feet horizontally and 1 foot above parallel sewers; 4 feet from storm drains.· Cal. Code Regs. tit. 22, 64572
Pressure test
Caltrans Method A: 125 psi for 1 hour with no more than 5 psi drop.· Caltrans Standard Specifications 2025, 20-2.01A(4)(b)
Stormwater
Construction disturbing one acre or more needs Construction General Permit coverage.· State Water Board, Order 2022-0057-DWQ
Tunnel Safety Orders
Apply to boring and pipe jacking 30 inches or larger and shafts over 20 feet.· Cal. Code Regs. tit. 8, 8403

Foundation and Concrete Construction

11% of the exam
Study →
Engineer required
Falsework over 14 feet high, with spans over 16 feet, or with traffic through it needs engineer-signed drawings.· Cal. Code Regs. tit. 8, 1717
Stripping
Forms stay until the concrete can support its weight and superimposed loads.· Cal. Code Regs. tit. 8, 1717
Free fall
No more than 8 feet without pipes, tubes or double belting.· Caltrans Standard Specifications 2025, 51-1.03D
Water cure
Keep concrete continuously wet for at least 7 days.· Caltrans Standard Specifications 2025, 90-1.03B
No retempering
Do not add water to partially hardened concrete.· Caltrans Standard Specifications 2025, 51-1.03D
Driven piles
Impact hammer, at least 1/8 inch per blow at nominal resistance; no vibratory hammers.· Caltrans Standard Specifications 2025, 49-2.01C
CIDH
Tremie tubes at least 10 inches in diameter, kept in the concrete.· Caltrans Standard Specifications 2025, 49-3

Buildings, Structures, and Related Work

9% of the exam
Study →
Lockout/tagout
Stop, de-energize, block and tag equipment whose unexpected start or stored energy could injure someone.· Cal. Code Regs. tit. 8, 3314
Grounding
At least a No. 8 copper grounding conductor in conduit, bonded to metal components (Caltrans).· Caltrans Standard Specifications 2025, 87
Asbestos notice
The NESHAP demolition notice is due 10 working days ahead even if no asbestos is found.· 40 CFR 61.145
Free-standing walls
No wall section over one story or 12 feet left without lateral bracing.· Cal. Code Regs. tit. 8, 1735
Recycling
CALGreen requires at least 65% of nonhazardous C&D debris to be recycled or salvaged.· CalRecycle C&D guide

Roadwork and Paving

5% of the exam
Study →
Layers
Base over 0.50 foot is placed in at least two approximately equal layers; no compacted layer over 0.50 foot.· Caltrans Standard Specifications 2025, 26-1.03D
Tolerance
Finished base within 0.05 foot of grade.· Caltrans Standard Specifications 2025, 26-1.03E
Lime treatment
Apply above 35 degrees F, keep moisture above optimum, mellow 36 hours, compact to 95%.· Caltrans Standard Specifications 2025, 24-2.03

Safety

18% of the exam
Study →
Toolbox meetings
At least every 10 working days.· Cal. Code Regs. tit. 8, 1509
Fall protection
Required for falls over 7-1/2 feet.· Cal. Code Regs. tit. 8, 1670
Overhead lines
6 feet general clearance and 10 feet for booms and storage from 600 V-50 kV lines.· Cal. Code Regs. tit. 8, 2946
Tapers
L = W x S^2 / 60 at 40 mph or less; L = W x S at 45 mph or more.· CA MUTCD 2026, Table 6B-4
Flaggers
STOP/SLOW paddle preferred; stations give drivers room to stop.· CA MUTCD 2026, Ch. 6D
Heat
Shade above 80 degrees F; high-heat procedures at 95 degrees F.· Cal. Code Regs. tit. 8, 3395
Lead
PEL 10 and action level 2 micrograms per cubic meter since January 1, 2025.· Cal. Code Regs. tit. 8, 1532.1
Confined spaces
Flammable gas over 10% of the LFL is a hazardous atmosphere.· Cal. Code Regs. tit. 8, 1951

Now prove you know them

Reading an outline is not the same as recalling it under exam pressure. Drill the free CSLB Class A — General Engineering (Trade Exam) questions to find the areas you keep missing, then sit a full timed mock.

Study aid, not a substitute for the official material — always confirm the current rule with CSLB — Class A study guide (13E-A).

Report