250 questions

Plumbing Codes: Design and Commercial Systems

Under IPC §1108.2, a secondary roof drain system must discharge:

  • a.Through separate piping to a point above grade where occupants would normally see it✓
  • b.Into the vent stack that is nearest to the secondary roof drain
  • c.Into the primary storm conductor just below the level of the roof deck
  • d.Into the sanitary building drain through a trap and a backwater valve

Secondary drains have separate piping and discharge above grade in a location normally observed by occupants or maintenance staff, so flow from them signals that the primary system is blocked.IPC §1108.2

Plumbing Codes: Design and Commercial Systems

Under IPC §1101.3, storm water may NOT be drained into:

  • a.A storm sewer under the public street
  • b.A sewer intended for sanitary sewage only✓
  • c.An approved point of disposal on the lot
  • d.A combined sewer approved by the authority

Storm water does not discharge into sanitary-only sewers, because the peak flow overloads the sewer and treatment plant. Combined sewers, storm sewers and approved disposal points are permitted.IPC §1101.3

Plumbing Codes: Design and Commercial Systems

Under IPC §1104.1, a rainwater conductor or leader may not be used as:

  • a.A soil, waste or vent pipe✓
  • b.A drain for a balcony or deck
  • c.A storm drain for an adjoining roof
  • d.A drain for a parking canopy

Conductors and leaders carry storm water only; they are not used as soil, waste or vent pipes, and soil, waste and vent pipes are not used as conductors.IPC §1104.1

Plumbing Codes: Design and Commercial Systems

A subsoil (foundation) drain is installed around a basement. Under IPC §1111.1, the pipe must be at least:

  • a.8 inches in diameter
  • b.12 inches in diameter
  • c.4 inches in diameter✓
  • d.1 inch in diameter

Subsoil drains are open-jointed, horizontally split or perforated pipe not less than 4 inches in diameter, discharging to a sump or approved location; a backwater valve protects a gravity connection.IPC §1111.1

Plumbing Codes: Design and Commercial Systems

Under IPC §1202.1, non-flammable medical gas systems in a hospital are designed and installed in accordance with:

  • a.NFPA 58
  • b.NFPA 13D
  • c.NFPA 99✓
  • d.NFPA 211

Medical gas and vacuum systems follow NFPA 99, Health Care Facilities Code. NFPA 13D covers residential sprinklers, NFPA 58 LP-gas and NFPA 211 chimneys.IPC §1202.1

Plumbing Codes: Design and Commercial Systems

Under IPC §802.1.3, a sterilizer that discharges potable water to the building drainage system must be:

  • a.Directly connected, with a backwater valve at the outlet
  • b.Indirectly connected, with the discharge heated to 180°F or more
  • c.Directly connected, with a deep-seal trap of 6 inches or more
  • d.Indirectly connected, with the discharge made through an air gap✓

Devices such as sterilizers and relief valves that discharge potable water to the drainage system do so through an indirect waste pipe by means of an air gap, so sewage cannot back up into the equipment.IPC §802.1.3

Plumbing Codes: Design and Commercial Systems

Under IPC §1003.3.4, hydromechanical grease interceptors are sized and rated according to:

  • a.The number of meals served per day, under the water utility's rate schedule
  • b.The diameter of the building sewer, under the sizing table for horizontal drains
  • c.The number of seats in the dining room, under the state health department rules
  • d.Their flow rate in gallons per minute, under standards such as PDI G101 or ASME A112.14.3✓

Hydromechanical units are tested and rated by flow rate and grease retention under PDI G101, ASME A112.14.3 or A112.14.4, and are fitted with a flow control device. Gravity interceptors are sized by volume instead.IPC §1003.3.4

Plumbing Codes: Design and Commercial Systems

A hydromechanical grease interceptor is installed with a vented flow control. Under IPC §1003.3.4.2, the flow control device:

  • a.Grinds food solids so that they pass through the interceptor to the sewer
  • b.Mixes hot water with the waste so that grease stays liquid through the unit
  • c.Limits the rate of flow so that it does not exceed the interceptor's rated capacity✓
  • d.Opens a bypass around the interceptor whenever the kitchen flow is heavy

The flow control restricts flow to the rated gpm and introduces air so grease separates; it is vented and never used as a bypass. Heat and grinding both carry grease through the unit.IPC §1003.3.4.2

Plumbing Codes: Design and Commercial Systems

Under IPC §1003.9, interceptors and separators must be designed so they do not become air bound, and they are vented:

  • a.Only where installed outdoors below grade
  • b.By one of the venting methods in Chapter 9✓
  • c.Only where made of fibreglass or plastic
  • d.Only where they hold more than 50 gallons

Interceptors and separators are designed so they do not become air bound and are vented in accordance with one of the methods in Chapter 9. Material, volume and location are not the test.IPC §1003.9

Plumbing Codes: Design and Commercial Systems

Under IPC §1003.10, each interceptor and separator must be installed so that:

  • a.It drains directly into the storm sewer rather than the sanitary sewer
  • b.It is fully buried under the kitchen floor slab with no cover above grade
  • c.It is accessible for inspection, cleaning and removal of the intercepted material✓
  • d.It can be bypassed during the hours when the building is fully occupied

Access for servicing is required; an interceptor that cannot be opened is never cleaned and soon passes grease or oil to the sewer. Bypasses and storm connections are not permitted.IPC §1003.10

Plumbing Codes: Design and Commercial Systems

A commercial dishwashing machine is connected to the drainage system. Under IPC §802.1.6, it must discharge:

  • a.Directly, through a running trap on the building drain
  • b.Indirectly, through a hose laid in a floor drain body
  • c.Indirectly, through an air gap or air break into a waste receptor✓
  • d.Directly, through the vent of the nearest sink

Commercial dishwashing machines discharge indirectly through an air gap or air break into a standpipe or waste receptor. A hose pushed into a floor drain gives no air break.IPC §802.1.6

Plumbing Codes: Design and Commercial Systems

Under IPC §802.1.1, a floor drain located inside a walk-in refrigerator or freezer where food is stored must be:

  • a.Directly connected to the storm drainage system by a deep-seal trap
  • b.Indirectly connected to the sanitary drainage system by an air gap✓
  • c.Directly connected to the grease interceptor inlet
  • d.Sealed with a threaded plug at all times

Floor drains in walk-in coolers and food storage areas are indirectly connected by an air gap; an exception allows an air break where a backwater valve protects the drain in some cases.IPC §802.1.1

Plumbing Codes: Design and Commercial Systems

Under IPC §706.3, a double sanitary tee may NOT receive the discharge of:

  • a.Back-to-back water closets or fixtures with pumping action discharge✓
  • b.Two bathtubs located on opposite sides of a common wall
  • c.Two drinking fountains located on opposite sides of a wall
  • d.Back-to-back lavatories that are served by a common vent

Double sanitary tee patterns do not receive back-to-back water closets or appliances with pumping action, because the discharge can cross the fitting into the opposite branch; a double wye or combination pattern is used, subject to a limited exception.IPC §706.3

Plumbing Codes: Design and Commercial Systems

An engineer proposes a single-stack drainage design that departs from the prescriptive tables. Under IPC §316, the code official may accept it where:

  • a.The building owner agrees in writing to maintain the system for ten years
  • b.The pipe manufacturer provides a brochure describing similar installations
  • c.The Responsible Master Plumber signs a letter accepting liability for the system
  • d.A registered design professional submits documents showing it meets the intent of the code✓

An alternative engineered design is submitted by a registered design professional with drawings and calculations, and must conform to the intent of the code with equivalent performance. Letters and brochures are not enough.IPC §316

Plumbing Codes: Design and Commercial Systems

Under IPC §105.2, a material or method not specifically described in the code may be approved by the code official where it:

  • a.Costs less than the material or method that the code describes for the same work, and is quicker to install
  • b.Has been used on at least three other projects in the same municipality
  • c.Is recommended by the wholesaler who supplies the plumbing contractor
  • d.Complies with the intent of the code and is at least equivalent in quality, strength and safety✓

Alternative materials, methods and equipment are approved where the code official finds them satisfactory, compliant with the code's intent and not less than equivalent in quality, strength, effectiveness, fire resistance, durability and safety.IPC §105.2

Plumbing Codes: Design and Commercial Systems

Under IPC §107.2, which inspection is made after the piping is installed but before it is covered?

  • a.The final inspection
  • b.The annual inspection
  • c.The rough-in inspection✓
  • d.The underground inspection

Underground inspection is made after trenches are dug and piping laid, before backfill; rough-in inspection after roof, framing and rough piping are in place and before wall or ceiling membranes; final inspection after the work is complete.IPC §107.2

Plumbing Codes: Design and Commercial Systems

Under IPC §708.1.4, a cleanout is required at each change of direction of the building drain greater than 45 degrees, except that only one cleanout is needed for each:

  • a.5 feet of developed length where there are multiple changes
  • b.200 feet of developed length where there are multiple changes
  • c.40 feet of developed length where there are multiple changes✓
  • d.500 feet of developed length where there are multiple changes

Where more than one change of direction greater than 45 degrees occurs in a run, only one cleanout is required for each 40 feet of developed length of the drain.IPC §708.1.4

Plumbing Codes: Design and Commercial Systems

Under IPC §708.1.5, a cleanout serving an 8-inch building sewer must be at least:

  • a.3 inches in size
  • b.1 inch in size
  • c.2 inches in size
  • d.4 inches in size✓

Cleanouts are the same size as the piping served, except that cleanouts for piping larger than 4 inches need not be larger than 4 inches. Smaller openings will not pass cleaning equipment.IPC §708.1.5

Plumbing Codes: Design and Commercial Systems

Under IPC §708.1.2, a building sewer 8 inches or larger must have a manhole located not more than what distance from the junction of the building drain and the building sewer?

  • a.500 feet
  • b.200 feet✓
  • c.1,000 feet
  • d.50 feet

Building sewers 8 inches and larger have a manhole not more than 200 feet from the junction of the building drain and building sewer, and at intervals of not more than 400 feet after that. Smaller building sewers have cleanouts at intervals of not more than 100 feet.IPC §708.1.2

Plumbing Codes: Design and Commercial Systems

Under IPC §714.1, plumbing fixtures on a floor ABOVE the elevation of the next upstream manhole cover:

  • a.Must discharge through a sewage ejector
  • b.Must discharge through a backwater valve too
  • c.May not discharge through a backwater valve✓
  • d.May not connect to the public sewer at all

Only fixtures with flood rims below the next upstream manhole cover discharge through the backwater valve. Routing upper-floor fixtures through it would flood the lower level when the valve closes.IPC §714.1

Plumbing Codes: Design and Commercial Systems

When a drainage stack is offset more than 45 degrees from vertical above the lowest branch, IPC §907 requires the offset to be vented:

  • a.Only where the drainage stack is 6 inches in diameter or larger
  • b.Where one branch interval or more is located above the offset
  • c.Where five or more branch intervals are located above the offset✓
  • d.Only where the building is a hospital or nursing home

Horizontal offsets of drainage stacks with five or more branch intervals above them are vented, by treating the upper section as a separate stack with a vent at its base and a vent for the lower section above the offset.IPC §907.1

Plumbing Codes: Design and Commercial Systems

A battery of eight floor-outlet water closets is to be circuit vented. Under IPC §914.4, a relief vent is required for the circuit-vented branch where:

  • a.Four or more water closets connect to it and it receives discharge from upper branches✓
  • b.The branch is made of cast iron and is longer than 20 feet in developed length
  • c.Two or more lavatories connect to it and it serves a single story building
  • d.The branch is larger than 3 inches in diameter and slopes at 1/8 inch per foot

A relief vent is needed for a circuit-vented horizontal branch serving four or more water closets that connects to a drainage stack receiving soil or waste discharge from upper horizontal branches.IPC §914.4

Plumbing Codes: Design and Commercial Systems

A vent header joins several vent stacks before one roof penetration. The header is sized, under IPC §906.1 and §904.5, by:

  • a.The total fixture units vented and the developed length to the farthest vent stack base✓
  • b.The diameter of the roofing flashing that is supplied for the vent terminal
  • c.The diameter of the smallest vent stack that is connected to the header
  • d.The number of roof penetrations that the header allows the installer to avoid

Vent headers are sized like vent stacks, using the sum of the drainage fixture units of all stacks connected and the developed length from the farthest stack base to the open air.IPC §§904.5, 906.1

Plumbing Codes: Design and Commercial Systems

Under IPC Chapter 13, piping that distributes on-site collected rainwater or reclaimed water for flushing must be:

  • a.Installed in copper type K so that it can be told from potable pipe
  • b.Cross-connected to the potable system through a single gate valve
  • c.Kept separate from the potable system and identified as non-potable✓
  • d.Left unmarked, so that occupants are not alarmed by warning labels

Non-potable water systems are separate from potable piping, identified by colour (purple for reclaimed water) and signage at outlets, and any potable makeup is protected by an air gap or approved backflow preventer.IPC §§1301.3, 608.8

Plumbing Codes: Design and Commercial Systems

Under IPC §305.3, a sleeve for a pipe passing through a foundation wall must be:

  • a.The same size as the pipe passing through it
  • b.Two pipe sizes larger than the pipe passing through it✓
  • c.At least 12 inches larger than the pipe passing through it
  • d.One half size smaller than the pipe hub

A relieving arch or a pipe sleeve built into the wall protects the pipe from settlement; the sleeve is two pipe sizes greater than the pipe, and the annular space is sealed.IPC §305.3

Plumbing Codes: Design and Commercial Systems

In a multi-story building, vertical cast-iron drainage stacks must be supported, under IPC §308.5, at:

  • a.The base only, with a concrete pier under the lowest hub
  • b.The base and each floor, not exceeding 15 feet✓
  • c.The roof only, with a riser clamp
  • d.Every third floor, not exceeding 45 feet

Vertical cast-iron pipe is supported at maximum intervals of 15 feet, which in practice means the base and each story; the base of the stack carries the weight during a water test.IPC §308.5; §308.9

Plumbing Codes: Design and Commercial Systems

Under IPC §312.3, an air test of a metal drainage and vent system is made at a pressure of:

  • a.100 psi (200 inches of mercury), held for at least 24 hours
  • b.50 psi (100 inches of mercury), held for at least 2 hours
  • c.1/2 psi (1 inch of mercury), held for at least 5 minutes
  • d.5 psi (10 inches of mercury), held for at least 15 minutes✓

The drainage and vent air test is 5 psi or 10 inches of mercury for 15 minutes with no added air. Plastic piping is not air tested.IPC §312.3

Plumbing Codes: Design and Commercial Systems

The final test of a completed drainage system with fixtures set, where the code official requires it under IPC §312.4, uses:

  • a.Potable water, at the working pressure of the water main
  • b.Smoke or peppermint, at a pressure equal to 1 inch of water column✓
  • c.Compressed air, at a pressure equal to 50 psi on a gauge
  • d.Nitrogen, at a pressure equal to 150 psi on a gauge

The final test fills the traps and introduces smoke under a pressure of 1 inch of water column for 15 minutes, or uses the odour of peppermint, to show leaks at fixture connections.IPC §312.4

Plumbing Codes: Design and Commercial Systems

Under IPC §301.6, plumbing systems may not be located in an elevator shaft or elevator equipment room, EXCEPT:

  • a.Floor drains, sumps and sump pumps at the base of the shaft that are indirectly connected✓
  • b.Water service piping, where it is insulated against condensation
  • c.Roof conductors, where they are made of cast iron with caulked joints and are fully insulated
  • d.Water closets and lavatories provided for the use of elevator mechanics

Plumbing is kept out of elevator shafts and machine rooms, apart from floor drains, sumps and sump pumps at the base of the shaft, provided they are indirectly connected to the plumbing system.IPC §301.6

Plumbing Codes: Design and Commercial Systems

Under IPC §314.2.1, condensate from an air handler in a commercial building may NOT be discharged:

  • a.To an approved indirect waste receptor such as a floor sink
  • b.To a properly trapped tailpiece on a lavatory in the building
  • c.Into a street, alley or other area where it would cause a nuisance✓
  • d.To an approved location outdoors, away from walkways

Condensate is conveyed to an approved place of disposal and does not discharge into a street, alley or other area where it would create a nuisance.IPC §314.2.1

Water Heaters

A potable water heating appliance is generally treated as a water heater, exempt from boiler construction rules, up to limits of:

  • a.2,000,000 Btu/h, 1,200 gallons of storage and 250°F
  • b.75,000 Btu/h, 50 gallons of storage and 180°F
  • c.200,000 Btu/h, 120 gallons of storage and 210°F✓
  • d.20,000 Btu/h, 12 gallons of storage and 140°F

Above 200,000 Btu/h input, a water temperature of 210°F or a nominal capacity of 120 gallons, the vessel falls under boiler and pressure vessel rules, including ASME construction.ASME Boiler and Pressure Vessel Code, Section IV (exemption limits); IPC §504

Water Heaters

Under IPC §504.3, a relief valve on a water heater must be:

  • a.Of the manual type, opened weekly by the occupant
  • b.Of the automatic self-closing type, tested to ANSI Z21.22✓
  • c.Of the rupture-disc type, replaced after each discharge it makes
  • d.Of the fusible-plug type only, with no pressure element

Relief valves are listed, self-closing and comply with ANSI Z21.22; a combination temperature and pressure relief valve protects against both conditions.IPC §504.3

Water Heaters

Under IPC §504.5, the pressure relief setting of a water heater relief valve may not exceed the tank's rated working pressure or:

  • a.150 psi, whichever is less✓
  • b.80 psi, whichever is less
  • c.300 psi, whichever is less
  • d.500 psi, whichever is less

The relief valve is set to open at not more than the tank working pressure or 150 psi, whichever is less. Eighty psi is the static pressure limit that triggers a pressure-reducing valve.IPC §504.5

Water Heaters

The temperature-sensing element of a temperature relief valve must be located, under IPC §504.5:

  • a.In the cold water inlet pipe, upstream of the shutoff valve
  • b.In the bottom 6 inches of the tank, next to the drain valve
  • c.In the top 6 inches of the tank, in contact with the hottest water✓
  • d.In the relief discharge pipe, near its termination point

The valve or its sensing element is installed in the shell within the top 6 inches of the tank so that it senses the hottest water. A valve on the cold inlet would never see the dangerous temperature.IPC §504.5

Water Heaters

Under IPC §504.6, the relief valve discharge pipe may NOT:

  • a.Discharge to an indirect waste receptor
  • b.Have a valve or tee installed in it✓
  • c.Be made of copper or CPVC pipe
  • d.Be the same size as the valve outlet

The discharge pipe is full size, serves one relief device, has no valves or tee fittings, is not trapped, flows by gravity and ends through an air gap. Listed copper and CPVC are accepted materials.IPC §504.6

Water Heaters

A relief valve discharge pipe terminates over a floor drain. Under IPC §504.6, the end of the pipe must be no more than how far above the floor or waste receptor flood level rim?

  • a.48 inches
  • b.6 inches✓
  • c.1/2 inch
  • d.24 inches

The pipe ends not more than 6 inches above the floor or receptor flood level rim and not less than two pipe diameters above it, and the end is not threaded.IPC §504.6

Water Heaters

A bottom-fed storage water heater is supplied from a cold line that could be drained. Under IPC §504.2, the heater needs:

  • a.A vacuum relief valve✓
  • b.A flow control valve set
  • c.A backwater valve
  • d.A second drain valve

Bottom-fed water heaters and bottom-fed tanks connected to water heaters have a vacuum relief valve complying with ANSI Z21.22, so the tank cannot be siphoned dry and collapse or overheat.IPC §504.2

Water Heaters

Under IPC §504.7.1, the drain pipe from a water heater pan must be at least:

  • a.2 inches
  • b.1/4 inch
  • c.3/4 inch✓
  • d.3 inches

The pan is drained by an indirect waste pipe of not less than 3/4 inch. A smaller drain cannot keep up with a leaking tank.IPC §504.7.1

Water Heaters

A water heater is replaced in an existing building where no pan drain was installed. Under IPC §504.7.2, the pan:

  • a.Must be omitted, because a pan without a drain is prohibited
  • b.Must be piped into the relief valve discharge pipe
  • c.May be left without a drain line to an approved location✓
  • d.Must be piped into the heater's flue vent connector

Where a pan drain was not previously installed, a pan drain is not required for a replacement water heater installation. Connecting the pan to the relief line or the vent is never permitted.IPC §504.7.2

Water Heaters

Under IPC §501.3, every storage water heater must have a drain valve that is:

  • a.Installed on the relief valve outlet, with a locking handle
  • b.Installed at the bottom of the heater, conforming to ASSE 1005✓
  • c.Installed at the top of the heater tank, conforming to ASSE 1016
  • d.Installed on the gas supply, upstream of the sediment trap

Drain valves for emptying the tank are at the bottom of each tank-type heater and hot water storage tank and conform to ASSE 1005.IPC §501.3

Water Heaters

Under IPC §503.1, a cold water shutoff valve for a water heater must be:

  • a.Installed on the cold supply near the heater, of the full-open type✓
  • b.Omitted where the heater is smaller than 50 gallons
  • c.Installed in the relief valve discharge line, of the quarter-turn ball type
  • d.Installed on the hot outlet only, of the globe type

A full-open valve on the cold water branch near the equipment lets the heater be isolated for service without shutting off the building.IPC §503.1

Water Heaters

A water heater is installed in an attic. Under IPC §502.3, the passageway to it must be large enough to remove the heater, at least 30 inches high and 22 inches wide, and not longer than:

  • a.75 feet from the opening to the heater
  • b.20 feet from the opening to the heater✓
  • c.5 feet from the opening to the heater
  • d.150 feet from the opening to the heater

The attic passageway is not more than 20 feet long measured along its centreline, has solid flooring at least 24 inches wide, and ends at a level service space of 30 by 30 inches.IPC §502.3

Water Heaters

Under IFGC §305.3, a gas water heater with an ignition source that is installed in a garage must have that source elevated above the floor by at least:

  • a.48 inches, unless the garage has a floor drain within 5 feet
  • b.6 inches, unless the appliance is listed as flammable vapour ignition resistant
  • c.18 inches, with no exception for any type of listed appliance
  • d.18 inches, unless the appliance is listed as flammable vapour ignition resistant✓

Ignition sources are elevated 18 inches above the floor in hazardous locations and private and public garages, except for appliances listed as flammable vapour ignition resistant.IFGC §305.3

Water Heaters

A gas water heater sits in the path of vehicles in a garage. Under IFGC §303.4, it must be:

  • a.Painted with yellow stripes
  • b.Protected from vehicle impact✓
  • c.Converted to electric power first
  • d.Vented with single-wall pipe

Appliances located where they may be subject to mechanical damage are protected by barriers, elevation or location out of the vehicle path.IFGC §303.4; §305.5

Water Heaters

Under IFGC §303.3, a gas-fired water heater may NOT be installed in a bedroom or bathroom unless it is:

  • a.Mounted at least 18 inches above the floor on a listed appliance stand, with a drain pan and a seismic strap fitted
  • b.A direct-vent appliance, or in a dedicated enclosure with a self-closing weather-stripped door and outdoor combustion air✓
  • c.A draft-hood appliance connected to a masonry chimney with a clay tile liner and a listed cap
  • d.Rated at less than 100,000 Btu/h and fitted with an automatic vent damper

Appliances are kept out of sleeping rooms, bathrooms, toilet rooms and storage closets, with exceptions for direct-vent appliances and for appliances in a sealed enclosure that takes all combustion air from outdoors.IFGC §303.3

Water Heaters

A draft-hood water heater takes all combustion air from inside the building. Under IFGC §304.5.1, the standard method requires a room volume of at least:

  • a.5 cubic feet per 1,000 Btu/h of input
  • b.50 cubic feet per 1,000 Btu/h of input✓
  • c.500 cubic feet per 1,000 Btu/h of input
  • d.1,000 cubic feet per 1,000 Btu/h of input

The standard method requires 50 cubic feet of indoor volume per 1,000 Btu/h of total appliance input; rooms with less volume are confined and need openings or outdoor air.IFGC §304.5.1

Water Heaters

A 100,000 Btu/h gas water heater draws combustion air from outdoors through two vertical ducts. Under IFGC §304.6.1, each opening must have a free area of at least:

  • a.25 square inches✓
  • b.50 square inches
  • c.100 square inches
  • d.10 square inches

With direct or vertical-duct communication to outdoors, each of the two openings has 1 square inch per 4,000 Btu/h: 100,000 ÷ 4,000 = 25 square inches. Horizontal ducts need 1 square inch per 2,000 Btu/h, which would be 50.IFGC §304.6.1

Water Heaters

A Category I gas water heater is connected to a vent with a single-wall metal connector. Under IFGC §503.10.5, a single-wall connector from a listed draft-hood appliance needs a clearance to combustibles of:

  • a.36 inches
  • b.6 inches✓
  • c.18 inches
  • d.1 inch

Single-wall connectors on listed appliances with draft hoods need 6 inches of clearance to combustible material; listed Type B vent material needs the clearance stated in its listing, typically 1 inch.IFGC §503.10.5

Water Heaters

Under IFGC §503.10.9, the horizontal run of an uninsulated single-wall vent connector for a draft-hood appliance should not exceed:

  • a.200 percent of the height of the chimney or vent
  • b.10 percent of the height of the chimney or vent
  • c.75 percent of the height of the chimney or vent✓
  • d.400 percent of the height of the chimney or vent

The maximum horizontal length of a single-wall connector is 75 percent of the vent height (100 percent for a listed Type B double-wall connector), unless the system is engineered.IFGC §503.10.9

Water Heaters

Under IFGC §503.6.5, a Type B gas vent serving a single draft-hood water heater must terminate at least how far in vertical height above the highest connected draft hood?

  • a.5 feet✓
  • b.15 feet
  • c.1 foot
  • d.30 feet

A Type B or L vent terminates at least 5 feet in vertical height above the highest connected appliance draft hood or flue collar, which gives enough draft.IFGC §503.6.5