Under Occupations Code §1301.002, a Tradesman Plumber-Limited license holder may construct and install plumbing in:

  • a.Apartment buildings and small offices
  • b.Any building up to three stories high
  • c.One-family and two-family dwellings only✓
  • d.Any building outside a city's limits

The statute limits the tradesman license to one-family and two-family dwellings. Apartments, offices and other commercial buildings need a journeyman or master plumber.Tex. Occ. Code §1301.002(10)

Plumbing License Law and Board Rules

An apprentice wants to qualify for the Tradesman Plumber-Limited exam through work experience. Under §1301.002, the apprentice needs at least:

  • a.1,000 hours under the direct supervision of a journeyman or master plumber
  • b.8,000 hours under the general supervision of a plumbing inspector
  • c.4,000 hours under the direct supervision of a journeyman or master plumber✓
  • d.2,000 hours under the general supervision of a drain cleaner

The experience route is 4,000 hours as a plumber's apprentice under the direct supervision of a journeyman or master plumber. The 8,000-hour figure is for the journeyman license and 2,000 hours for a residential utilities installer.Tex. Occ. Code §1301.002(10)

Plumbing License Law and Board Rules

Besides the 4,000-hour experience route, §1301.002 and §1301.3542 allow a person to qualify for the tradesman exam by:

  • a.Completing a coherent sequence of plumbing courses in a career and technology education program✓
  • b.Working for two years as a registered drain cleaner for any company that holds a city business registration
  • c.Holding a general contractor registration issued by a Texas city
  • d.Completing a home-study course sold by a plumbing supply wholesaler

A person who successfully completes a coherent sequence of plumbing courses offered through a career and technology education program may apply for and take the tradesman exam.Tex. Occ. Code §§1301.002(10), 1301.3542

Plumbing License Law and Board Rules

Before taking the tradesman exam through the experience route, §1301.354(b) requires an apprentice to complete classroom training of:

  • a.48 hours
  • b.24 hours✓
  • c.6 hours
  • d.96 hours

The classroom training is 24 hours for the tradesman exam and 48 hours for the journeyman exam, given by a Board-approved instructor in a Board-approved program.Tex. Occ. Code §1301.354(b)

Plumbing License Law and Board Rules

Under §1301.002, a Tradesman Plumber-Limited license holder does plumbing work under the supervision of:

  • a.A Responsible Master Plumber✓
  • b.A municipal plumbing inspector
  • c.The homeowner who hired the company
  • d.A registered drain cleaner

The tradesman constructs and installs plumbing for one-family or two-family dwellings under the supervision of a Responsible Master Plumber, who carries the insurance and responsibility for the work.Tex. Occ. Code §1301.002(10)

Plumbing License Law and Board Rules

A tradesman plumber-limited is offered a side job re-piping a small restaurant. Under the Plumbing License Law, the tradesman:

  • a.May not do the work, unless the restaurant owner signs a written waiver first
  • b.May not do the work, because a restaurant is not a one-family or two-family dwelling✓
  • c.May do the work, so long as the restaurant has fewer than 50 seats in the dining room
  • d.May do the work, so long as a registered apprentice is on the site to assist

The tradesman license covers one-family and two-family dwellings only. No waiver, seat count or helper extends it to commercial work.Tex. Occ. Code §1301.002(10); 22 TAC §365.1

Plumbing License Law and Board Rules

Under §1301.354(a), a person who wants to learn the plumbing trade must do what before assisting a licensed plumber?

  • a.Complete 24 hours of classroom training
  • b.Buy a general liability insurance policy of $300,000
  • c.Register with the Board as a plumber's apprentice✓
  • d.Pass the tradesman written examination

A person who desires to learn the trade registers as a plumber's apprentice before assisting a licensee. The examination and classroom training come later, and the insurance is the Responsible Master Plumber's duty.Tex. Occ. Code §1301.354(a)

Plumbing License Law and Board Rules

Under §1301.354(c), an applicant who completed the classroom portion of a U.S. Department of Labor approved training program may be credited toward the required work experience with up to:

  • a.1,000 hours✓
  • b.4,000 hours
  • c.8,000 hours
  • d.100 hours

At the applicant's request the Board may credit up to 1,000 hours of the required work experience for completing the classroom portion of an approved training program.Tex. Occ. Code §1301.354(c)

Plumbing License Law and Board Rules

Under §1301.354(c-1), completing a coherent sequence of construction-trade courses in a State Board of Education approved career and technical education program can earn a work-experience credit of up to:

  • a.2,000 hours
  • b.25 hours
  • c.4,000 hours
  • d.250 hours✓

The credit for an approved construction-trade career and technical education sequence is up to 250 hours, separate from the 1,000-hour credit for an approved apprenticeship classroom program.Tex. Occ. Code §1301.354(c-1)

Plumbing License Law and Board Rules

Under §1301.3542(f), who may teach the plumbing courses in a career and technology education program that leads to the tradesman exam?

  • a.Any teacher who holds a general Texas teaching certificate
  • b.A registered plumber's apprentice who is in the final year of training
  • c.A licensed master plumber, journeyman plumber or plumbing inspector✓
  • d.A sales representative of a plumbing fixture manufacturer

Instruction in the program may be given only by a person licensed as a master plumber, journeyman plumber or plumbing inspector, whether as an employee, contractor or volunteer.Tex. Occ. Code §1301.3542(f)

Plumbing License Law and Board Rules

A high school student enrols in a career and technology plumbing course described by §1301.3542. To take the course, the student:

  • a.Must first pass the written part of the tradesman examination
  • b.Must first work 1,000 hours for a Responsible Master Plumber
  • c.Must first register as a plumber's apprentice and pay the registration fee
  • d.Does not have to register as a plumber's apprentice or pay a registration fee✓

A student of any age enrolled in a high school or institution of higher education may take the course sequence without registering as an apprentice or paying a registration fee to the Board.Tex. Occ. Code §1301.3542(b)

Plumbing License Law and Board Rules

What score is needed to pass each part of a Board plumbing examination under 22 TAC §363.22?

  • a.70 percent✓
  • b.50 percent
  • c.85 percent
  • d.95 percent

The passing score is 70 percent on each part, written and practical.22 TAC §363.22

Plumbing License Law and Board Rules

A candidate fails the tradesman exam for the first time. Under 22 TAC §363.22, the candidate may retake it after waiting at least:

  • a.7 days
  • b.1 year
  • c.6 months
  • d.30 days✓

The waiting periods are 30 days after a first failure, 60 days after a second and 90 days after a third or later failure.22 TAC §363.22

Plumbing License Law and Board Rules

Under §1301.351(d), where must a tradesman plumber-limited keep the license while working on a job?

  • a.At home with tax records
  • b.On his or her person✓
  • c.In the company office
  • d.In the truck glove box

A license holder engaged in plumbing must carry the license on his or her person, so that an inspector or Board investigator can check it on site.Tex. Occ. Code §1301.351(d)

Plumbing License Law and Board Rules

How often does a Tradesman Plumber-Limited license have to be renewed?

  • a.Every year✓
  • b.Every 5 years
  • c.Never, once issued
  • d.Every 10 years

Licenses, endorsements and registrations under Chapter 1301 are valid for one year and are renewed annually.Tex. Occ. Code §1301.401

Plumbing License Law and Board Rules

Under §1301.404, how many hours of continuing professional education must a tradesman plumber-limited complete each year to renew?

  • a.1 hour
  • b.24 hours
  • c.48 hours
  • d.6 hours✓

A license holder completes six hours of approved continuing professional education each year, three of them on health protection, energy conservation and water conservation.Tex. Occ. Code §1301.404

Plumbing License Law and Board Rules

Of the six hours of continuing education required each year, §1301.404 requires three hours on:

  • a.Health protection, energy conservation and water conservation✓
  • b.Welding, soldering and brazing techniques
  • c.Business accounting, marketing, estimating and customer relations
  • d.First aid, defensive driving and ladder safety

Three of the six hours cover health protection, energy conservation and water conservation; the rest covers subjects the Board approves, such as code changes and the License Law.Tex. Occ. Code §1301.404

Plumbing License Law and Board Rules

A tradesman license expired 45 days ago. Under §1301.403, it can be renewed by paying:

  • a.Five times the normal renewal fee
  • b.Nothing, after a new examination
  • c.The normal renewal fee and nothing more, with no late charge
  • d.One and one-half times the normal renewal fee✓

A license expired for 90 days or less is renewed at one and one-half times the normal fee. After more than 90 days and less than two years the fee is doubled.Tex. Occ. Code §1301.403

Plumbing License Law and Board Rules

A tradesman license has been expired for three years. Under §1301.403, to be licensed again the person must:

  • a.Work for 500 hours as a registered plumber's apprentice
  • b.Meet the requirements for a new license, including the examination✓
  • c.Pay the normal renewal fee for each of the missed years, plus interest
  • d.Complete 18 hours of continuing education and pay one fee

A license expired for two years or more may not be renewed; the person obtains a new license by meeting the requirements and passing the examination again.Tex. Occ. Code §1301.403

Plumbing License Law and Board Rules

A tradesman plumber-limited moves to a new home address. Under 22 TAC §365.8, the Board must be notified within:

  • a.1 year
  • b.24 hours
  • c.30 days✓
  • d.6 months

License holders and registrants tell the Board of a change of name or address within 30 days, so that renewal and enforcement notices reach them.22 TAC §365.8

Plumbing License Law and Board Rules

Who may advertise or offer plumbing services to the public and pull plumbing permits in Texas?

  • a.A Responsible Master Plumber✓
  • b.A journeyman plumber
  • c.A registered apprentice
  • d.A tradesman plumber-limited licensee

Only a Responsible Master Plumber, or a company that has secured one, may offer plumbing to the public and obtain permits. A tradesman or journeyman works under that master's supervision.Tex. Occ. Code §1301.351; 22 TAC §367.9

Plumbing License Law and Board Rules

The insurance that a Responsible Master Plumber must carry under §1301.552 is at least:

  • a.$5,000 for each individual job the company performs
  • b.$1,000,000 for each individual job the company performs
  • c.$300,000 for all claims arising in a one-year period✓
  • d.$30,000 for all claims arising in a one-year period

The Responsible Master Plumber files a certificate of commercial general liability insurance of not less than $300,000 for all claims arising in a one-year period.Tex. Occ. Code §1301.552

Plumbing License Law and Board Rules

A person does plumbing in a house without holding any license or registration. Under §1301.508, the offence is:

  • a.A Class C misdemeanor✓
  • b.A Class A misdemeanor
  • c.A state jail felony
  • d.A third degree felony

A violation of the chapter or a Board rule is a Class C misdemeanor, and the Board may also impose an administrative penalty.Tex. Occ. Code §1301.508

Plumbing License Law and Board Rules

The maximum administrative penalty the Board may impose under §1301.702 is:

  • a.$50,000 per violation, each year being a separate violation
  • b.$100 per violation, each month being a separate violation
  • c.$5,000 per violation, each day being a separate violation✓
  • d.$500 per violation, each week being a separate violation

The administrative penalty may not exceed $5,000 for each violation, and each day a violation continues or occurs is a separate violation.Tex. Occ. Code §1301.702

Plumbing License Law and Board Rules

A homeowner replaces the water heater in the house the homeowner owns and lives in. Under §1301.051, the homeowner:

  • a.Must register as an apprentice before doing any work on the house
  • b.Must hold a tradesman license before doing any work on the house
  • c.Does not need a plumbing license for work on the owner's homestead✓
  • d.May do the work only while a master plumber is on the site

Plumbing work done by a property owner in the owner's homestead is exempt from licensing. Local permit and inspection requirements can still apply.Tex. Occ. Code §1301.051

Plumbing License Law and Board Rules

Under §1301.551, a municipal plumbing permit is NOT required to:

  • a.Replace a water heater
  • b.Re-pipe a water service
  • c.Replace a kitchen faucet✓
  • d.Add a second bathroom

No permit is required to repair leaks or to replace lavatory or kitchen faucets, ballcocks, garbage disposals or water closets. Water heaters, re-pipes and additions need permits.Tex. Occ. Code §1301.551

Plumbing License Law and Board Rules

Under §1301.551, plumbing must be regulated by ordinance in a municipality with more than:

  • a.50,000 inhabitants
  • b.500,000 inhabitants
  • c.500 inhabitants
  • d.5,000 inhabitants✓

A municipality with more than 5,000 inhabitants regulates sewers, plumbing and drainage by ordinance, including permits and inspections.Tex. Occ. Code §1301.551

Plumbing License Law and Board Rules

Which plumbing codes has the Board adopted under §1301.255 and 22 TAC §367.2?

  • a.The Southern Standard Plumbing Code and the Life Safety Code
  • b.The National Standard Plumbing Code and the BOCA Basic Plumbing Code
  • c.The Uniform Plumbing Code and the International Plumbing Code✓
  • d.The National Electrical Code and the International Fire Code

The Board adopts the Uniform Plumbing Code and the International Plumbing Code; the adoption includes the International Fuel Gas Code and the International Residential Code.Tex. Occ. Code §1301.255; 22 TAC §367.2

Plumbing License Law and Board Rules

Which edition of the International Residential Code does 22 TAC §367.2 list as adopted?

  • a.2027
  • b.2009
  • c.2003
  • d.2021✓

Since November 19, 2026, the Board's rule lists the 2021 editions of the Uniform Plumbing Code, International Plumbing Code, International Fuel Gas Code and International Residential Code, replacing the 2018 editions. A city may adopt its own plumbing code with local amendments.22 TAC §367.2

Plumbing License Law and Board Rules

Under 22 TAC §367.10, the company name and the Responsible Master Plumber's license number must appear on service vehicles:

  • a.On the rear only, in letters at least 6 inches high
  • b.On the dashboard, in letters of any legible size
  • c.On the roof, in letters at least 12 inches high
  • d.On both sides, in letters at least 2 inches high✓

Vehicles used in the plumbing business display the company name and RMP license number on both sides in letters at least 2 inches high.22 TAC §367.10

Plumbing License Law and Board Rules

Which license or endorsement allows a person to install medical gas piping under §1301.356?

  • a.A drain cleaner registered with the Board for five years
  • b.A master or journeyman plumber with the medical gas endorsement✓
  • c.A tradesman plumber-limited with two years of experience
  • d.A residential utilities installer working under a master plumber

The medical gas piping installation endorsement is issued only to master and journeyman plumbers. A tradesman's work is limited to dwellings, which do not have medical gas systems.Tex. Occ. Code §1301.356

Plumbing License Law and Board Rules

A journeyman plumber, under §1301.002, must have completed how many hours under the supervision of a Responsible Master Plumber?

  • a.4,000 hours
  • b.2,000 hours
  • c.8,000 hours✓
  • d.800 hours

The journeyman license needs 8,000 hours, twice the 4,000 hours for the tradesman plumber-limited license, which is why the tradesman license is often a step toward journeyman.Tex. Occ. Code §1301.002(4)

Plumbing License Law and Board Rules

Under §1301.3521, the Board refunds an examination fee to an applicant who:

  • a.Gives advance notice of being unable to take the exam, or misses it because of an emergency✓
  • b.Decides after the examination that the questions were unfair
  • c.Fails the examination by fewer than five points on the written part and asks the Board for a rescore
  • d.Takes the examination but does not want the license issued

The Board refunds the fee where the applicant gives advance notice of an inability to take the exam or cannot take it because of an emergency. Failing the exam is not a ground for refund.Tex. Occ. Code §1301.3521

Plumbing License Law and Board Rules

Under §1301.502, who may issue a citation for a violation of the Plumbing License Law inside a city?

  • a.A plumbing supply salesperson
  • b.A municipal plumbing inspector✓
  • c.A homeowners' association officer
  • d.A tradesman plumber-limited licensee

A municipal plumbing inspector may issue citations within the municipality, as may a water district plumbing inspector and a Board field representative.Tex. Occ. Code §1301.502

Plumbing License Law and Board Rules

A customer complains that a tradesman did work in a house with no Responsible Master Plumber behind the job. Complaints about plumbers are filed with:

  • a.The Texas Department of Insurance
  • b.The Texas State Board of Plumbing Examiners✓
  • c.The Texas Real Estate Commission
  • d.The Railroad Commission of Texas, Gas Services

The Board receives and investigates complaints against license holders and unlicensed persons, and tells the parties the status of a complaint at least quarterly.Tex. Occ. Code §§1301.303, 1301.304

General Requirements and Fixtures

A plastic drain pipe passes through a wall stud with its edge 1 inch from the face of the stud. Under IRC §P2603.2.1, the pipe must be protected by:

  • a.A layer of pipe insulation
  • b.A wrap of duct tape
  • c.A steel shield plate✓
  • d.A bead of fire caulking

Pipe other than cast iron or galvanized steel installed less than 1-1/4 inches from the nearest edge of the framing member is protected by steel shield plates, so that nails and screws cannot puncture it.IRC §P2603.2.1

General Requirements and Fixtures

Under IRC §P2603.2.1, a shield plate protecting pipe through a wall plate must extend beyond the top and sole plates by at least:

  • a.2 inches✓
  • b.1/4 inch
  • c.12 inches
  • d.8 inches

Shield plates are steel at least 0.0575 inch thick (No. 16 gage) and extend at least 2 inches above sole plates and below top plates.IRC §P2603.2.1

General Requirements and Fixtures

A water service passes through a concrete foundation wall. Under IRC §P2603.4, the pipe sleeve must be:

  • a.Twelve inches larger than the pipe
  • b.One-half size smaller than the pipe
  • c.The same size as the pipe
  • d.Two pipe sizes larger than the pipe✓

A pipe through a foundation wall has a relieving arch or a sleeve two pipe sizes greater than the pipe, so that settlement does not shear the pipe.IRC §P2603.4

General Requirements and Fixtures

Under IRC §P2604.3, backfill over a pipe in a trench is placed and tamped in layers of:

  • a.6 inches, until the pipe has 12 inches of cover✓
  • b.24 inches, until the pipe has 48 inches of cover
  • c.18 inches, until the pipe has 36 inches of cover
  • d.Any depth, since tamping is not required

Loose earth free of rocks and debris is placed in 6-inch layers and tamped until the crown of the pipe is covered by 12 inches of tamped earth.IRC §P2604.3

General Requirements and Fixtures

A trench for a building sewer runs parallel to a house footing. Under IRC §P2604.4, the trench may not extend below:

  • a.A 10-degree bearing plane from the top edge of the footing
  • b.The finished grade line at the outside face of the footing
  • c.The top of the foundation wall above the footing
  • d.A 45-degree bearing plane from the bottom edge of the footing✓

Trenching parallel to footings and walls does not extend into the bearing plane of the footing, taken as a 45-degree line from its bottom edge, so that the footing is not undermined.IRC §P2604.4

General Requirements and Fixtures

Under IRC Table P2605.1, horizontal PVC or ABS drain pipe must be supported at intervals of not more than:

  • a.4 feet✓
  • b.2 feet
  • c.20 feet
  • d.12 feet

Horizontal ABS and PVC pipe is supported every 4 feet; vertical runs are supported every 10 feet with mid-story guides for small sizes.IRC Table P2605.1

General Requirements and Fixtures

Under IRC Table P2605.1, horizontal PEX water tubing must be supported at intervals of not more than:

  • a.6 inches
  • b.12 feet
  • c.10 feet
  • d.32 inches✓

PEX tubing is supported every 32 inches horizontally, because the tubing is flexible and sags between supports when hot.IRC Table P2605.1

General Requirements and Fixtures

Under IRC Table P2605.1, horizontal copper water tubing 1 inch in diameter must be supported at intervals of not more than:

  • a.15 feet
  • b.6 feet✓
  • c.20 feet
  • d.1 foot

Copper tubing 1-1/4 inches and smaller is supported every 6 feet horizontally; 1-1/2 inches and larger every 10 feet.IRC Table P2605.1

General Requirements and Fixtures

A new DWV system in a house is tested with water at rough-in. Under IRC §P2503.5.1, the test needs a head of water of at least:

  • a.10 feet, held for 15 minutes✓
  • b.10 feet, held for 15 seconds
  • c.100 feet, held for 24 hours
  • d.1 foot, held for 15 minutes

The water test fills the system to a 10-foot head above the section tested and holds for 15 minutes with no leaks.IRC §P2503.5.1

General Requirements and Fixtures

Under IRC §P2503.5.1, an air test on a DWV system is made at:

  • a.100 psi for 24 hours, on any kind of piping
  • b.5 psi for 15 minutes, on plastic piping only
  • c.5 psi for 15 minutes, and not on plastic piping✓
  • d.50 psi for 15 minutes, on any kind of piping

The air test is 5 psi (10 inches of mercury) for 15 minutes. Plastic DWV piping is not tested with air, because a failure under compressed air can throw fragments.IRC §P2503.5.1

General Requirements and Fixtures

The water supply system of a new house is tested with water. Under IRC §P2503.7, the test pressure is at least:

  • a.500 psi, held for 24 hours
  • b.The working pressure of the system, held for 15 minutes✓
  • c.10 inches of water column, held for 10 minutes
  • d.Half the working pressure of the system, held for 1 minute

The water supply system is tested at not less than its working pressure, or for piping other than plastic by air at 50 psi, for 15 minutes.IRC §P2503.7

General Requirements and Fixtures

A site-built shower pan liner is tested before tile is set. Under IRC §P2503.6, the liner is filled with water to a depth of at least 2 inches at the threshold and held for:

  • a.15 seconds
  • b.4 hours
  • c.15 minutes✓
  • d.48 hours

The drain is plugged and the pan filled to at least 2 inches measured at the threshold; the water is held for 15 minutes with no leakage.IRC §P2503.6

General Requirements and Fixtures

Under IRC §P2705.1, the centre of a water closet must be at least how far from a side wall or partition?

  • a.36 inches
  • b.15 inches✓
  • c.9 inches
  • d.24 inches

A water closet, lavatory or bidet is set at least 15 inches from its centre to a side wall or obstruction and 30 inches centre to centre from an adjacent fixture.IRC §P2705.1

General Requirements and Fixtures

Under IRC §P2705.1, the clear space in front of a water closet, lavatory or bidet must be at least:

  • a.48 inches
  • b.36 inches
  • c.10 inches
  • d.21 inches✓

There is at least 21 inches of clearance in front of a water closet, lavatory or bidet to any wall, fixture or door.IRC §P2705.1

General Requirements and Fixtures

Under IRC §P2708.1, a shower compartment must have a finished interior area of at least:

  • a.900 square inches✓
  • b.1,600 square inches
  • c.2,500 square inches
  • d.400 square inches

A shower has at least 900 square inches of interior cross-sectional area and a minimum dimension of 30 inches, measured from the finished interior at the top of the threshold.IRC §P2708.1