Texas Master Electrician Exam — All Questions
The figures these questions turn on, pooled by value and printable, with a side to write them from memory: Texas Master Electrician (TDLR / PSI, 2026 NEC) cheat sheet PDF — $9.99 →
409 questions
In other than dwelling units, service and feeder-supplied equipment likely to be examined or serviced while energized must carry what type of permanent marking?
- a.Voltage rating only
- b.Phase-sequence label
- c.An arc-flash hazard marking✓
- d.Equipment grounding conductor size
Under 110.16, a permanent arc-flash marking, field or factory applied, is required on this equipment. It shows the nominal system voltage, the arc flash boundary, the available incident energy or minimum PPE level, and the date of the assessment.2026 NEC §110.16
One of the primary purposes of system grounding under 2026 NEC 250.4(A)(1) is to:
- a.limit the voltage imposed by lightning, line surges, or unintentional contact with higher-voltage lines✓
- b.carry normal load current
- c.eliminate the need for overcurrent protection
- d.reduce conductor resistance
250.4(A)(1): system grounding limits the voltage imposed by lightning, line surges, and unintentional contact with higher-voltage lines, and stabilizes the voltage to earth during normal operation.2026 NEC §250.4(A)(1)
What is the maximum number of service disconnecting means permitted for a single set of service-entrance conductors (each in a separate enclosure)?
- a.Eight
- b.Six✓
- c.One
- d.Four
A service normally has one disconnecting means, but 230.71(B) allows two to six disconnects where each is in its own enclosure, section or compartment. Six is the most that can be used.2026 NEC §230.71(B)
A service uses #2/0 Cu ungrounded conductors. What is the minimum copper grounding electrode conductor?
- a.#4 AWG✓
- b.#2 AWG
- c.#8 AWG
- d.#6 AWG
Table 250.66 puts 2/0 and 3/0 copper service conductors in the same row, which calls for a #4 copper grounding electrode conductor.2026 NEC Table 250.66
Where the grounding electrode conductor connects only to a made ground rod, what is the largest copper conductor size ever required?
- a.#4 AWG
- b.#6 AWG✓
- c.#8 AWG
- d.#2 AWG
The portion of the GEC connecting solely to a rod, pipe, or plate electrode need not be larger than #6 Cu.2026 NEC §250.66(A)
A service has 500-kcmil Cu ungrounded conductors per phase. What is the minimum copper grounded (neutral) service conductor for bonding purposes?
- a.1/0 AWG✓
- b.#1 AWG
- c.#2 AWG
- d.#4 AWG
The grounded service conductor must be at least the size in Table 250.102(C)(1); for 500-kcmil Cu phase conductors that value is 1/0 Cu.2026 NEC Table 250.102(C)(1)
Service phase conductors total 1,500 kcmil Cu per phase (over 1,100 kcmil). Using the 12.5% rule, what is the minimum copper main bonding jumper?
- a.4/0 AWG✓
- b.250 kcmil
- c.2/0 AWG
- d.3/0 AWG
Above 1,100 kcmil, the main bonding jumper is at least 12.5% of the phase area: 0.125 x 1,500 = 187.5 kcmil, so 4/0 Cu (211.6 kcmil) is the smallest that qualifies.2026 NEC §250.28(D)(1)
What is the minimum service disconnecting-means rating for a one-family dwelling?
- a.200 A
- b.125 A
- c.60 A
- d.100 A✓
The service disconnecting means for a one-family dwelling must be rated at least 100 A. The 60 A figure applies to other installations, not to a one-family dwelling.2026 NEC §230.79(C)
What is the minimum vertical clearance for an overhead service drop, not over 300 V to ground, above a residential driveway that is not subject to truck traffic?
- a.15 ft
- b.12 ft✓
- c.10 ft
- d.18 ft
Service-drop conductors up to 300 V to ground require 12 ft of clearance over residential property and driveways not subject to truck traffic.2026 NEC §230.24(B)(2)
At a separately derived system such as a transformer, what conductor connects the grounded conductor to the system grounding electrode?
- a.Equipment bonding jumper
- b.Main bonding jumper
- c.Grounding electrode conductor✓
- d.System bonding jumper
Under 250.30(A)(5), the grounding electrode conductor connects the grounded conductor of a separately derived system to the grounding electrode. Trap: the system bonding jumper in 250.30(A)(1) ties the grounded conductor to the equipment grounding path and enclosure, not to the electrode.2026 NEC §250.30(A)(5)
Want these explained in order? Texas Master Electrician Exam — Open-Book Study Guide (2026 NEC) — PDF + EPUB, $14.99 · 14-day refund →
A single made electrode (ground rod) must be supplemented unless its resistance to earth does not exceed what value?
- a.10 ohms
- b.1 ohm
- c.25 ohms✓
- d.5 ohms
A single rod, pipe, or plate electrode must be supplemented by a second electrode. The Exception to 250.53(A)(2) drops that requirement where the single electrode has a resistance to earth of 25 ohms or less; the question directs you to it by asking when the supplement is not needed.2026 NEC §250.53(A)(2)
A metal underground water pipe qualifies as a grounding electrode if it is in direct contact with earth for at least how many feet?
- a.10 ft✓
- b.3 ft
- c.1 ft
- d.5 ft
A metal underground water pipe counts as a grounding electrode only if it is in direct contact with the earth for 10 ft or more.2026 NEC §250.52(A)(1)
A concrete-encased electrode (Ufer) must consist of at least how many feet of 1/2-in. or larger rebar or bare #4 Cu conductor?
- a.20 ft✓
- b.15 ft
- c.25 ft
- d.10 ft
A concrete-encased electrode requires at least 20 ft of 1/2-in (or larger) rebar or 20 ft of bare #4 Cu encased in the concrete footing/foundation.2026 NEC §250.52(A)(3)
A transformer (separately derived system) has 3/0 AWG copper derived (secondary) phase conductors. What is the minimum copper grounding electrode conductor for the SDS?
- a.#6 AWG
- b.#2 AWG
- c.#1 AWG
- d.#4 AWG✓
250.30(A)(5) sizes the grounding electrode conductor of a separately derived system from Table 250.66 using the derived phase conductors: 2/0 or 3/0 copper requires #4 copper. Trap: #6 is the limit only where the conductor connects solely to a rod, pipe or plate electrode.2026 NEC §250.30(A)(5)
A separately derived system has 250-kcmil copper derived conductors. Using the bonding table, what is the minimum copper system/supply-side bonding jumper?
- a.#2 AWG✓
- b.#4 AWG
- c.#1 AWG
- d.1/0 AWG
250.30(A)(1) and (A)(2) size these jumpers from Table 250.102(C)(1): over 3/0 through 350 kcmil copper requires a #2 copper bonding jumper. Trap: #4 is the value for 2/0 or 3/0 copper, one row too small for 250 kcmil.2026 NEC Table 250.102(C)(1)
Service-entrance conductors supply a 200-A continuous load. What minimum conductor ampacity is required?
- a.160 A
- b.200 A
- c.230 A
- d.250 A✓
230.42(A)(1) requires service-entrance conductors to carry the noncontinuous load plus 125% of the continuous load: 200 x 1.25 = 250 A. Trap: 200 A ignores the continuous-load multiplier.2026 NEC §230.42(A)(1)
A service has 500-kcmil copper ungrounded conductors. What is the minimum copper bonding jumper for the metal underground water pipe?
- a.1/0 AWG✓
- b.#2 AWG
- c.#4 AWG
- d.#3 AWG
250.104(A)(1) sizes the water-pipe bonding jumper from Table 250.102(C)(1): over 350 through 600 kcmil copper requires 1/0 copper. Trap: #2 is the value for over 3/0 through 350 kcmil, one row too small for 500 kcmil.2026 NEC §250.104(A)(1)
A service uses #3/0 AWG copper ungrounded conductors. What is the minimum copper grounding electrode conductor?
- a.#8 AWG
- b.#6 AWG
- c.#2 AWG
- d.#4 AWG✓
2026 NEC Table 250.66: 3/0 AWG copper ungrounded service conductors fall in the 2/0 or 3/0 row, which calls for a 4 AWG copper grounding electrode conductor.2026 NEC Table 250.66
A service uses 400-kcmil copper ungrounded conductors. What is the minimum copper grounding electrode conductor?
- a.1/0 AWG✓
- b.#2 AWG
- c.#3 AWG
- d.#1 AWG
2026 NEC Table 250.66: 400 kcmil copper ungrounded service conductors fall in the over 350 through 600 kcmil row, which calls for a 1/0 AWG copper grounding electrode conductor.2026 NEC Table 250.66
Where the grounding electrode conductor connects solely to a concrete-encased (Ufer) electrode, what is the largest copper size it is ever required to be?
- a.#2 AWG
- b.#4 AWG✓
- c.#8 AWG
- d.#6 AWG
2026 NEC 250.66(B): where the grounding electrode conductor connects only to a concrete-encased electrode, it never has to be larger than 4 AWG copper, whatever the service conductor size.2026 NEC §250.66(B)
A service has 3/0 AWG copper ungrounded conductors. What is the minimum copper grounded (neutral) service conductor for bonding purposes?
- a.#6 AWG
- b.#4 AWG✓
- c.#2 AWG
- d.#8 AWG
2026 NEC 250.24(D)(1) sizes the grounded service conductor from Table 250.102(C)(1): for 2/0 or 3/0 copper ungrounded conductors, the grounded conductor is at least 4 AWG copper.2026 NEC §250.24(D)(1)
Service ungrounded conductors are 350-kcmil copper per phase. Using the bonding table, what is the minimum copper main bonding jumper?
- a.#1 AWG
- b.#2 AWG✓
- c.#4 AWG
- d.1/0 AWG
2026 NEC 250.28(D)(1) with Table 250.102(C)(1): 350 kcmil copper falls in the over 3/0 through 350 kcmil row, which requires a 2 AWG copper main bonding jumper.2026 NEC §250.28(D)(1)
Service phase conductors total 2,000 kcmil Cu per phase (over 1,100 kcmil). Using the 12.5% rule, what is the minimum copper main bonding jumper?
- a.3/0 AWG
- b.350 kcmil
- c.250 kcmil✓
- d.4/0 AWG
2026 NEC 250.28(D)(1) and Table 250.102(C)(1), Note 1: above 1,100 kcmil copper the main bonding jumper must have at least 12.5% of the ungrounded conductor area: 0.125 x 2,000 = 250 kcmil.2026 NEC §250.28(D)(1)
Where two ground rods are used as the grounding electrode, what is the minimum required spacing between them?
- a.8 ft
- b.3 ft
- c.10 ft
- d.6 ft✓
2026 NEC 250.53(A)(3): where more than one rod, pipe, or plate electrode is installed, they must be at least 6 ft apart.2026 NEC §250.53(A)(3)
A driven ground rod electrode must have a minimum length in contact with the soil of:
- a.10 ft
- b.6 ft
- c.4 ft
- d.8 ft✓
2026 NEC 250.52(A)(5) and 250.53(A)(4): rod electrodes must be at least 8 ft long and installed so that at least 8 ft of length is in contact with the soil.2026 NEC §250.53(A)(4)
Overhead service-drop conductors must maintain what minimum vertical clearance above public streets, roads, and alleys?
- a.15 ft
- b.12 ft
- c.18 ft✓
- d.10 ft
2026 NEC 230.24(B)(4): overhead service conductors need 18 ft of vertical clearance over public streets, alleys, roads, and parking areas subject to truck traffic.2026 NEC §230.24(B)
A service has 250-kcmil copper ungrounded conductors. What is the minimum copper grounded (neutral) service conductor required by 250.24(D)(1)?
- a.1/0 AWG
- b.#4 AWG
- c.#2 AWG✓
- d.#1 AWG
2026 NEC 250.24(D)(1) with Table 250.102(C)(1): 250 kcmil copper falls in the over 3/0 through 350 kcmil row, which requires a 2 AWG copper grounded conductor.2026 NEC §250.24(D)(1)
A service uses 1/0 AWG copper ungrounded conductors. What is the minimum copper grounding electrode conductor?
- a.#4 AWG
- b.#2 AWG
- c.#6 AWG✓
- d.#8 AWG
2026 NEC Table 250.66: 1/0 AWG copper ungrounded service conductors fall in the 1 or 1/0 row, which calls for a 6 AWG copper grounding electrode conductor.2026 NEC Table 250.66
A service uses 750-kcmil copper ungrounded conductors. What is the minimum copper grounding electrode conductor?
- a.2/0 AWG✓
- b.3/0 AWG
- c.1/0 AWG
- d.#1 AWG
2026 NEC Table 250.66: 750 kcmil copper ungrounded service conductors fall in the over 600 through 1,100 kcmil row, which calls for a 2/0 AWG copper grounding electrode conductor.2026 NEC Table 250.66
A separately derived system (transformer) has 600-kcmil copper derived conductors. What is the minimum copper supply-side bonding jumper?
- a.1/0 AWG✓
- b.#1 AWG
- c.2/0 AWG
- d.#2 AWG
2026 NEC 250.30(A)(2) sizes a wire-type supply-side bonding jumper from Table 250.102(C)(1): 600 kcmil copper is in the over 350 through 600 kcmil row, which requires 1/0 AWG copper.2026 NEC §250.30(A)(2)
Service-entrance conductors supply a 150-A continuous load. What minimum conductor ampacity is required?
- a.187.5 A✓
- b.150 A
- c.200 A
- d.165 A
2026 NEC 230.42(A)(1): service-entrance conductors must have an ampacity of at least the noncontinuous load plus 125% of the continuous load: 150 x 1.25 = 187.5 A.2026 NEC §230.42(A)(1)
A service has 3/0 AWG copper ungrounded conductors. What is the minimum copper bonding jumper for the metal underground water pipe?
- a.#2 AWG
- b.#6 AWG
- c.#4 AWG✓
- d.#8 AWG
2026 NEC 250.104(A)(1) sizes the metal water piping bonding jumper from Table 250.102(C)(1): 2/0 or 3/0 copper service conductors require a 4 AWG copper bonding jumper.2026 NEC §250.104(A)(1)
Service phase conductors total 1,100 kcmil Cu per phase. Using the bonding table, what is the minimum copper main bonding jumper?
- a.1/0 AWG
- b.2/0 AWG✓
- c.#1 AWG
- d.3/0 AWG
2026 NEC 250.28(D)(1) with Table 250.102(C)(1): 1,100 kcmil copper is still in the over 600 through 1,100 kcmil row, which requires a 2/0 AWG copper main bonding jumper.2026 NEC §250.28(D)(1)
What is the maximum setting permitted for the ground-fault protection of equipment on a service disconnecting means?
- a.600 amperes
- b.800 amperes
- c.1000 amperes
- d.1200 amperes✓
Section 230.95(C) caps the ground-fault protection setting at 1200 amperes. The 1000 ampere figure is the disconnect rating at which the protection becomes required under 230.95(A), not the pickup setting.2026 NEC §230.95(C)
For ground-fault currents of 3000 amperes or more, what is the maximum time delay permitted for service ground-fault protection of equipment?
- a.1 second✓
- b.2 seconds
- c.5 seconds
- d.10 seconds
Section 230.95(C) limits the time delay to one second for ground-fault currents equal to or greater than 3000 amperes. Longer delays would let a high level arcing fault burn well past what the rule allows.2026 NEC §230.95(C)
When a service ground-fault protection system is first installed on site, how must it be performance tested?
- a.By operating the push-to-test button on the relay
- b.By an insulation resistance test of the service conductors
- c.By secondary injection
- d.By primary current injection✓
Section 230.95(E) requires the system to be performance tested when first installed on site, by qualified persons using a primary current injection process that follows the instructions provided with the equipment, with a written record kept available to the authority having jurisdiction. A push-to-test button, secondary injection and an insulation resistance test are not the process the rule names.2026 NEC §230.95(E)
Where the main bonding jumper in a service panelboard is a screw only, how must the screw be identified?
- a.By a white or gray marking on the screw head
- b.By a tag reading BONDING attached next to the screw
- c.By a green finish that is visible with the screw installed✓
- d.By a listing mark stamped on the screw threads
Section 250.28(B) requires a main or system bonding jumper that is a screw only to have a green finish that can be seen with the screw installed. White or gray would suggest a grounded conductor, and a tag or a stamped mark is not what this section calls for.2026 NEC §250.28(B)
One common grounding electrode conductor of the wire type serves several separately derived systems. What is the smallest copper conductor permitted for the common grounding electrode conductor under the main rule?
- a.1/0 AWG
- b.2/0 AWG
- c.3/0 AWG✓
- d.250 kcmil
Section 250.30(A)(6)(a)(1) requires a wire type common grounding electrode conductor to be not smaller than 3/0 AWG copper or 250 kcmil aluminum. Picking 250 kcmil mixes up the aluminum value with the copper value. The taps from each system are sized separately from the derived conductors of the system they serve.2026 NEC §250.30(A)(6)
Service-entrance conductors supply 96 amperes of continuous lighting load, 24 amperes of continuous sign load, and 70 amperes of noncontinuous load. The service equipment is not listed for operation at 100 percent of its rating. Before any adjustment or correction factors, what minimum ampacity is required?
- a.190 A
- b.207.5 A
- c.220 A✓
- d.237.5 A
Section 230.42(A)(1) requires an ampacity of at least the noncontinuous load plus 125 percent of the continuous load. The continuous load is 96 + 24 = 120 amperes, so 70 + (1.25 x 120) = 70 + 150 = 220 amperes. The 190 ampere answer adds the loads with no factor, and 237.5 amperes applies 125 percent to everything.2026 NEC §230.42(A)(1)
Service-entrance conductors must serve a maximum load of 176 amperes. An ambient temperature correction factor of 0.88 applies and no other factor applies. To satisfy the requirement that the ampacity after correction is not less than the maximum load, what is the minimum table ampacity before correction?
- a.154.9 A
- b.200 A✓
- c.220 A
- d.250 A
Section 230.42(A)(2) requires the ampacity that remains after adjustment and correction factors to be at least the maximum load served. The table ampacity times 0.88 must be at least 176 amperes, so 176 / 0.88 = 200 amperes. Multiplying 176 by 0.88 gives 154.9 amperes, which runs the factor the wrong way, and 220 amperes applies 125 percent, which belongs to the other test in 230.42(A)(1).2026 NEC §230.42(A)(2)
Three pieces of bare 1/2 in. rebar, 8 ft, 6 ft and 5 ft long, are tied end to end with steel tie wires inside a concrete footing that is in direct contact with the earth. How much more connected rebar length is needed before this can qualify as a concrete-encased electrode?
- a.0 ft
- b.1 ft✓
- c.6 ft
- d.12 ft
Section 250.52(A)(3) requires at least 20 ft of rebar, and it allows multiple pieces connected by steel tie wires or similar effective means to make up that length. The pieces total 8 + 6 + 5 = 19 ft, so 1 ft more is needed. The 12 ft answer assumes the 20 ft must be a single bar added to the longest piece, which the section does not require.2026 NEC §250.52(A)(3)
Two 10-HP, 460-V motors (14 A each) are supplied by one feeder. What minimum feeder conductor ampacity is required?
- a.28 A
- b.31.5 A✓
- c.25 A
- d.35 A
125% of the largest motor plus the other: (14 x 1.25) + 14 = 17.5 + 14 = 31.5 A.2026 NEC §430.24
A motor feeder supplies motors whose largest branch-circuit short-circuit and ground-fault device is 90 A, plus other motors with 50 A total full-load current. What is the maximum feeder short-circuit and ground-fault protective device rating?
- a.110 A
- b.175 A
- c.125 A✓
- d.150 A
The feeder device may not exceed the largest branch-circuit device (90 A) plus the other FLCs (50 A) = 140 A; the largest standard rating not exceeding 140 A is 125 A.2026 NEC §430.62(A)
A feeder supplies a 50-HP (65 A), a 30-HP (40 A), and a 20-HP (27 A) motor, all 460-V three-phase. What minimum feeder conductor ampacity is required?
- a.156 A
- b.140 A
- c.132 A
- d.148.25 A✓
2026 NEC 430.24: 125% of the largest motor full-load current plus the sum of the others: (65 x 1.25) + 40 + 27 = 81.25 + 67 = 148.25 A.2026 NEC §430.24
Using the demand table for household electric ranges, what is the demand load for one 12-kW electric range in a dwelling (Column C, one appliance)?
- a.9,600 VA
- b.12,000 VA
- c.6,000 VA
- d.8,000 VA✓
For a single household range not over 12 kW, the Column C demand is 8 kW = 8,000 VA. The 12-kW nameplate is reduced to an 8-kW calculated demand for one range.2026 NEC Table 120.55
What is the demand load for two 12-kW household electric ranges served from one feeder (range demand table, Column C, two appliances)?
- a.11,000 VA✓
- b.12,000 VA
- c.19,200 VA
- d.16,000 VA
Two ranges not over 12 kW have a Column C demand of 11 kW = 11,000 VA. This is less than the 24,000 VA connected total because of diversity.2026 NEC Table 120.55
A single household range is rated 16 kW. Using the 5% increase per kW over 12 kW rule on the 8-kW base, what is the demand load?
- a.9,600 VA✓
- b.16,000 VA
- c.10,400 VA
- d.8,000 VA
16 kW is 4 kW over 12 kW, so add 5% x 4 = 20% to the 8-kW base: 8,000 x 1.20 = 9,600 VA.2026 NEC Table 120.55
A dwelling has four fastened-in-place appliances (dishwasher, disposal, water heater, compactor) totaling 6,000 VA. What is the demand load after applying the fastened-appliance demand factor?
- a.3,000 VA
- b.4,500 VA✓
- c.6,000 VA
- d.7,500 VA
Under 2026 NEC 120.53, where four or more fastened-in-place appliances (each at least 1/4 hp or 500 W) are on the same feeder or service in a dwelling, a 75% demand factor may be applied: 6,000 x 0.75 = 4,500 VA.2026 NEC §120.53
An electric range has a Column C demand of 8,000 VA. Using the 70% neutral demand for ranges, what is the range contribution to the feeder neutral load?
- a.8,000 VA
- b.5,600 VA✓
- c.4,000 VA
- d.7,000 VA
The feeder neutral for a household range may be figured at 70% of the range demand: 8,000 x 0.70 = 5,600 VA.2026 NEC §120.61(B)(1)
A commercial kitchen has six kitchen-equipment units totaling 60 kW. Applying the demand factor for six or more units, what is the demand load?
- a.60 kW
- b.39 kW✓
- c.45 kW
- d.42 kW
2026 NEC Table 120.56 allows 65% for six or more units: 60 x 0.65 = 39 kW (the result may not be less than the sum of the two largest units). Trap: 45 kW uses 75%, the dwelling fastened-in-place appliance factor, not the commercial-kitchen table.2026 NEC Table 120.56