Bảo hiểm & Quyền cầm giữ
198 câu hỏiAn umbrella or excess policy sits above scheduled underlying policies — commercial general liability, commercial auto, often employers' liability — and pays only after those limits are exhausted, which is how a contractor reaches catastrophic-claim limits without buying them at the primary layer. (c) inverts that structure. (a) confuses liability limits with workers' compensation, which is statutory, separate, and not something an umbrella replaces. (d) names the risk the CGL's 'your work' exclusion leaves with the contractor, and an umbrella follows the underlying policy's terms rather than curing its exclusions.
—Civil Code §8416(a) requires a written statement, signed and verified by the claimant, containing the claimant's demand after deducting all just credits and offsets, the name of the owner or reputed owner if known, a general statement of the kind of work furnished, the name of the person who employed the claimant, a description of the site sufficient for identification, the claimant's address, and a proof of service affidavit; the statutory Notice of Mechanics Lien must be served with it. §8422 forgives erroneous information about the demand, the credits, the work, or the site unless the court finds the claimant intended to defraud, or a party without actual knowledge was misled to its prejudice. The other three answers are records no lien requires and that do nothing to identify the claim.
Civ. Code §8416(a) / §8422A contractor's own commercial general liability policy insures it against covered third-party bodily injury and property damage arising from its operations, whether or not anyone has named it on another policy. (a) and (c) reverse the direction of additional insured coverage — that status usually runs upward, giving the owner and prime access to the sub's insurer, not the other way round. (b) confuses the two coverages: workers' compensation answers injuries to the contractor's own employees, and third parties are not employees.
Notice to the lender is what keeps the fund-based remedy alive: a bonded stop payment notice under §8532 obliges the lender to withhold loan money it has not yet disbursed. (b) is the closest trap because lien priority is a real and valuable question, but priority turns on when work commenced relative to recording of the deed of trust, not on whom the preliminary notice went to. (c) reverses the point of the notice, which is to stop money rather than release it. (d) invents a claim against the lender's own insurance.
Civil Code §8200 / §8532Public property cannot be sold to satisfy a private claim, so the legislature substituted two remedies: the direct contractor's payment bond and a stop payment notice served on the public entity against funds still unpaid. (d) is the sharpest distractor, because both bonds are posted on the same job — but the performance bond answers to the public entity for completion, and a sub is not its beneficiary. (a) concerns work ordered by someone other than the owner. (b) is first-party property insurance on the work itself and pays no one for unpaid labour or materials.
Civil Code §9100 et seq. / §9350 et seq.Recording a release bond under Civil Code §8424 substitutes the bond for the property, so the claimant's action runs against the surety and the principal rather than against title. (d) is the step the bond was recorded to foreclose, and pursuing it is the error the section exists to prevent. (a) misroutes a claim: the §7071.6 licence bond is claimed against its surety, and the CSLB holds no money. (c) reaches the wrong party — funds in the lender's hands are the target of a bonded stop payment notice, a separate remedy with its own notice conditions.
Civil Code §8424Coverage B of a workers' compensation policy answers employee-injury liability that the no-fault benefit system does not resolve — third-party-over actions, consequential claims by family members, and dual-capacity claims. (a) is Coverage A of the same policy, the statutory benefits themselves, and mistaking the two is the whole point of the item. (c) is commercial general liability, which excludes injury to employees precisely because this coverage handles it. (d) is a wage claim, which is neither an injury nor insured under a workers' compensation policy.
Labor Code §3600 / §3602With no notice of completion or cessation recorded, Civil Code §8412 gives the direct contractor 90 days from completion to record. Counting 90 days from March 1 lands near the end of May.
Civ. Code §8412Checking the certificate before the sub mobilizes verifies that the required coverage exists at the moment exposure begins, when it is still possible to keep an uninsured sub off the site. (a) confuses receiving a document with buying a policy. (b) reads the certificate as controlling the insurer, which it does not — cancellation rights live in the policy. (c) reverses the transfer: the purpose is to reach the sub's insurer for the sub's work, not to spend the general contractor's own limits on it.
The two bonds are issued together and answer different failures: the payment bond guarantees that subcontractors and suppliers are paid, and the performance bond guarantees to the owner that the work is completed according to the contract. (a) invents schedule and budget guarantees neither bond gives. (c) is half-right and therefore the strongest distractor — reduced lien exposure is a real benefit to the owner, but it is a consequence of subs being paid, and no bond exists to protect the surety. (d) reverses both beneficiaries.
Civil Code §8600 et seq.Civil Code §8416(a)(5) requires a description of the site sufficient for identification; a street address usually does, and a legal description removes all doubt. §8422 then forgives an erroneous site description unless the court finds the claimant intended to defraud, or that a party without actual knowledge of the mistake was misled to its prejudice. (a) and (b) appear nowhere in the section. (d) is close enough to be tempting — §8416(a)(2) requires the owner's name if known and (a)(6) requires the CLAIMANT's address — but the owner's mailing address and phone number are not what identifies the property.
Civ. Code §8416(a)(5) / §8422An additional insured endorsement lets the owner or general contractor tender a claim arising out of the subcontractor's work to the subcontractor's insurer and obtain a defense and indemnity under that policy, subject to its terms and limits. (a) is the dangerous reading: risk transfer supplements your own coverage and never excuses it. (b) confuses insurance with cost allocation — adding insureds does not reduce the premium. (c) describes a performance bond, which is a surety obligation rather than an insurance one.
Civil Code §8400(f) lists the design professional among the persons with a mechanics lien right for work provided to a work of improvement, subject to the same preliminary notice condition in §8410 and the recording deadlines in §8412 and §8414. California also gives design professionals a separate remedy in §8300 et seq. for design services furnished before construction starts, which §8302(c) allows only where a building permit or other governmental approval has been obtained using those services. (a) ignores both routes. (b) reverses the remedies, and a design professional's stop payment notice rights are expressly preserved in §8608(b). (c) confuses property insurance with a payment remedy.
Civ. Code §8400(f) / §8302(c)Only the insurer can add an insured to a policy, and it does so by endorsement; a certificate is a broker's evidence of coverage and its own wording disclaims amending the policy. (d) is the substitute owners most often settle for — a notice provision tells the owner when coverage is ending, it does not make the owner an insured or give it a right to defense. (a) and (b) belong to other transactions entirely, one in the lien law and the other in a credit file.
—A stop payment notice is served, not recorded; it directs the owner or lender to withhold funds. A mechanics lien, by contrast, is recorded against the property. Both require a valid underlying claim by someone who furnished work and proper service.
Civ. Code §8500Labor Code §2775(b)(1) treats a worker as an employee unless the hiring entity proves all three parts of the ABC test, and §2781 sets the narrower conditions for construction subcontractors; the label on the paperwork settles nothing. An employer that owed coverage and had none faces the civil action §3706 allows, in which §3708 presumes the injury was caused by the employer's negligence and removes the usual defenses, plus §3700.5 misdemeanor exposure and suspension of the license under B&P §7125.2. (a) understates the exposure by orders of magnitude. (b) is the label-as-conclusion error the ABC test forecloses. (d) misreads the commercial general liability policy, which excludes bodily injury to the insured's own employees precisely because workers' compensation answers it.
Lab. Code §2775(b)(1) / §2781 / §3706 / §3708Civil Code §8204(a) provides that a claimant who did not give preliminary notice is not precluded from giving one later, but is then entitled to claim only for work performed within the 20 days prior to service of the notice, and at any time thereafter. Service on Day 40 therefore protects deliveries from roughly Day 20 forward, and the deliveries from Day 1 to Day 19 fall outside the window. (b) treats a late notice as fatal, which the subdivision expressly says it is not. (c) ignores the look-back altogether. (a) counts 20 days forward from service instead of backward, which protects nothing the statute protects.
Civ. Code §8204(a)A mechanics lien ultimately requires a foreclosure action against the owner's real property to collect, making it more cumbersome than a stop payment notice (reaching funds) or a payment bond claim (reaching a surety). Claimants often pursue funds or bonds first.
Civil Code §8414 gives a claimant other than the direct contractor 30 days after a recorded notice of completion; miss it and the lien remedy is gone, though a payment bond claim, a timely stop payment notice, or a plain breach-of-contract action may remain. (a) borrows the direct contractor's 60-day period under §8412, which is not available to lower-tier claimants. (c) is the no-notice rule the recording displaced. (d) states the §8460 deadline for suing on a lien already recorded, which never revives a lien that was recorded too late.
Civil Code §8414 / §8460A commercial general liability policy excludes bodily injury to an employee arising out of employment, because that injury belongs to workers' compensation, with Coverage B employers' liability picking up the suits the no-fault system does not resolve. (a), (b) and (c) are exactly what the CGL is bought for: third-party bodily injury and property damage arising out of the contractor's operations. The line is who was hurt, not how badly or where — an employee framing the same wall as the injured visitor produces a workers' compensation claim, not a CGL claim.
—Under Civil Code §8600 et seq. the right to recover on a private-work payment bond tracks the notice conditions for a mechanics lien, so a claimant who had to give a preliminary notice must have given it — laborers and others excused from notice are excused here too. (a) imports the §8532 bond that accompanies a stop payment notice to a lender. (c) treats the remedies as sequential when they are alternative; a claimant may go against the bond without ever recording. (d) would make the bond useless, since its value is being payable without first litigating to judgment.
Civil Code §8600 et seq.Insurance transfers the insured's own fortuitous losses to an insurer that does not expect repayment; a bond is a three-party guarantee running to an obligee, and the surety expects the principal to reimburse what it pays. Projects carry both because the risks do not overlap. (a) and (b) each describe insurance and then attach the label to both instruments. (c) mistakes who a bond protects — the owner is typically the obligee the bond runs to, so the bond protects the owner from the contractor, not the reverse.
A claimant that has been paid should execute and record a release, and an unreleased lien clouds the owner's title until it does. The owner's statutory remedy is the petition in Civil Code §8480: once the claimant has let the 90 days in §8460 pass without commencing an action to enforce the lien, the owner may petition for an order releasing the property, the claimant carries the burden of proving the lien's validity under §8488(a), and §8488(c) awards the prevailing party reasonable attorney's fees. §8494 then strips an expired lien of any effect as notice. (a) ignores the practical problem the statute addresses, since the cloud on title bites long before anything expires. (b) invents a treble-damages penalty this remedy does not carry. (d) names the wrong party's loss: the harm runs to the owner whose title is clouded, not to the contractor.
Civil Code §8480 / §8488(c) / §8494$25,000 is the contractor's bond every active licensee must keep on file under B&P §7071.6 — and the same figure is the minimum disciplinary bond under §7071.8 and the amount of the qualifying individual's bond under §7071.9. (b) is the real neighbor and the reason this item is worth asking: Civil Code §9550(a) requires a payment bond on a public works contract involving an expenditure in excess of $25,000, the identical number doing an unrelated job. (a) invents a statutory cap on liens; a lien is in the amount of the claimant's demand. (d) invents a CSLB insurance requirement — the only insurance the license law compels is workers' compensation under §7125, plus the limited liability company's liability policy under §7071.19.
B&P Code §7071.6 / Civ. Code §9550(a)SB 216 (Stats. 2022, ch. 978) wrote a version of §7125 that requires every licensee to carry workers' compensation or self-insurance whatever its classification, leaving only a §7029 joint venture with no employees exempt, and set it to start on January 1, 2026. SB 1455 (Stats. 2024, ch. 485) rewrote that start date: the new section "shall become operative on January 1, 2028" (b), and the interim §7125 — a no-employee exemption available to everyone except C-8, C-20, C-22, C-39 and D-49 holders — stays in effect until then. (a) is the original SB 216 date, which is why so much study material still states the all-licensee rule as current. (c) is a real date in the same bill, but for something else: by January 1, 2027 §7125.7 requires the board to establish a process to verify that licensees claiming the no-employee exemption are eligible. (d) is not a date either bill uses.
Bus. & Prof. Code §7125 (Stats. 2024, ch. 485, SEC. 12–13); §7125.7Until January 1, 2028, B&P §7125(b), as amended by SB 1455 (Stats. 2024, ch. 485), exempts an applicant or licensee that has no employees and files the Registrar's exemption statement — but only if it does not hold a C-8 (concrete), C-20 (warm-air heating, ventilating and air-conditioning), C-22 (asbestos abatement), C-39 (roofing) or D-49 (tree service) license. A C-33 painter is not on that list, so (c) may file. (a), (b) and (d) are on it: those holders must carry workers' compensation or a certification of self-insurance whether or not they employ anyone, and CSLB will not accept an exemption from them. From January 1, 2028 the list stops mattering, because the SB 216 version of §7125 requires every licensee to carry coverage except a §7029 joint venture with no employees — the painter included.
Bus. & Prof. Code §7125(b) (as amended by SB 1455, Stats. 2024, ch. 485)Section 3722 assesses twice, on two different triggers. Subdivision (a) is issued together with the stop order, before anyone is hurt, at $1,500 per employee employed when the order is issued and served. Subdivision (d)(2) then adds $10,000 per employee employed on the date of injury once a claim is found compensable. The $100,000 in subdivision (f) is a CEILING on the total of these assessments, not a penalty in its own right, and the criminal exposure under §3700.5 sits on top of all of it.
Labor Code §3722(a), (d)(2), (f)These are the two halves of one bargain. Section 3600(a) makes the employer liable for compensation WITHOUT REGARD TO NEGLIGENCE, so an injured worker who was partly or wholly careless still collects. Section 3602(a) is the price of that: the compensation claim is the sole and exclusive remedy against the employer, so the negligence suit does not lie. The narrow exceptions are elsewhere — a willful physical assault by the employer, fraudulent concealment, a defective product the employer made, or an employer that never secured coverage at all.
Labor Code §3600(a); §3602(a)Two clocks run from two different events. The employer had one working day from notice of the injury to hand the worker a claim form. Once the worker FILES that form, §5402(c) gives the employer one working day to authorize all treatment consistent with the applicable guidelines, so a Wednesday filing means Thursday. Liability for that treatment is limited to $10,000 until the claim is accepted or rejected — the money is spent before anyone decides the claim, which is the point of it. Ninety days is a different deadline: it is when an unrejected claim becomes presumed compensable.
Labor Code §5401(a); §5402(b), (c)Civil Code §8302 creates a lien on the site for a design professional NOTWITHSTANDING the absence of commencement of the planned work of improvement — that is exactly the situation the chapter exists for. The conditions are all present here: a person described in §8014 (a registered professional engineer), services under a written contract with the landowner, a building permit or other governmental approval obtained in furtherance of the work, and the contracting landowner still owning the site when the claim of lien is recorded. Had no permit been obtained, no lien could be created at all.
Civil Code §8302; §8300; §8014Hợp đồng & Thực hiện
339 câu hỏiCalifornia yêu cầu một hợp đồng cải tạo nhà bằng văn bản cho mọi công việc trên bất động sản nhà ở tổng cộng từ $500 trở lên, bao gồm cả nhân công và vật tư (B&P §7159). Lưu ý: ngưỡng $500 cho hợp đồng bằng văn bản này là một con số KHÁC với ngưỡng $1,000 cho công việc nhỏ không có giấy phép theo §7048 — SB 517 đã sửa đổi §7159 cho năm 2026 (quy tắc công bố nhà thầu phụ), nhưng vẫn giữ con số $500 này; đừng nhầm lẫn hai loại.
Bus. & Prof. Code §7159Quyền hủy bỏ trong 3 ngày áp dụng cho các hợp đồng được chào và ký tại nhà của người tiêu dùng. Chủ nhà có đến nửa đêm ngày làm việc thứ ba để hủy bỏ mà không bị phạt.
Bus. & Prof. Code §7159(b)B&P §7159(d)(1) buộc hợp đồng cải tạo nhà phải ghi tên, địa chỉ kinh doanh và số giấy phép của nhà thầu; phần còn lại của danh mục (d) thêm giá hợp đồng, mô tả công trình và vật liệu chính, lịch thanh toán theo tiến độ, và ngày khởi công cùng ngày hoàn thành dự kiến. Luật không đòi ngày hết hạn giấy phép. Luật cũng không đòi con dấu kiến trúc sư, việc đó thuộc thẩm định bản vẽ; danh sách nhà thầu phụ, thứ nằm trong hồ sơ riêng của nhà thầu; hay số hợp đồng bảo hiểm tai nạn lao động, điều mà giấy chứng nhận của hãng bảo hiểm mới ghi.
B&P Code §7159(d)(1)B&P §7159(d) buộc hợp đồng cải tạo nhà và mọi thay đổi của nó phải lập bằng văn bản và các bên ký trước khi bắt đầu phần việc mà thay đổi đó bao gồm, còn §7159(c)(5) nói mẫu lệnh thay đổi chỉ trở thành một phần hợp đồng theo đúng các điều kiện ấy. Một hóa đơn gửi sau đó chỉ ghi nhận một khoản tiền, không phải một thỏa thuận đạt được trước. Phòng xây dựng địa phương xét sự tuân thủ quy chuẩn và cấp giấy phép; nó không có vai trò nào trong việc làm cho một thay đổi giá có hiệu lực ràng buộc giữa chủ nhà và nhà thầu. Và không điều khoản nào buộc nộp lệnh thay đổi cho CSLB, dù trong 10 ngày hay bất kỳ thời hạn nào.
B&P Code §7159(c)(5), (d)Nhà thầu không được yêu cầu hoặc chấp nhận thanh toán cuối cùng cho đến khi dự án về cơ bản đã hoàn thành. Yêu cầu thanh toán trước thời điểm này là vi phạm Luật Nhà Thầu California.
Bus. & Prof. Code §7159.5(a)(5)Các điều khoản trọng tài được phép trong hợp đồng xây dựng nhưng phải được công bố rõ ràng, được viết bằng phông chữ in đậm ít nhất 10 điểm trong hợp đồng cải tạo nhà, và được chủ nhà ký tắt riêng.
Bus. & Prof. Code §7191Bỏ dở một công trình mà không có lý do hợp pháp, bản thân điều đó đã là căn cứ kỷ luật theo B&P §7107, nên đình chỉ hoặc thu hồi giấy phép là khả năng thực tế; và tiền đặt cọc nhận cho công trình rồi chi vào việc khác có thể bị truy tố theo Penal Code §484b về biển thủ tiền xây dựng — tội nhẹ ở mức 2.350 đô la hoặc thấp hơn, và bị xử nặng hơn khi cao hơn mức đó. Một khoản phạt không đụng đến giấy phép, một lệnh hoàn tiền đơn thuần, và một thư cảnh báo đều thấp hơn mức kỷ luật mà §7107 cho phép.
B&P Code §7107; Penal Code §484bMặc dù về mặt kỹ thuật chủ nhà có thể xin giấy phép, nhưng đó là trách nhiệm nghề nghiệp của nhà thầu để đảm bảo tất cả giấy phép cần thiết được lấy trước khi công việc bắt đầu. Làm việc không có giấy phép là vi phạm giấy phép.
Bus. & Prof. Code §7090Điều khoản bất khả kháng miễn trừ một bên khỏi việc thực hiện khi các sự kiện bất thường ngoài tầm kiểm soát (thời tiết, thiên tai, đại dịch) ngăn cản việc hoàn thành đúng hạn. Nó bảo vệ nhà thầu khỏi thiệt hại do chậm trễ.
Civil Code §1671(b) cho rằng điều khoản bồi thường thiệt hại ấn định là hợp lệ, trừ khi bên phản đối chứng minh được số tiền đó không hợp lý trong hoàn cảnh tồn tại vào thời điểm ký hợp đồng - nên tính hợp lý được xét tại thời điểm ký. Một số tiền đặt cao để ngăn chặn hay trừng phạt chính là khoản phạt điển hình không qua được phép thử đó. Đòi chứng minh thiệt hại thực tế chính xác thì phá bỏ mục đích ấn định trước. Và việc ký nhận điều khoản hay bỏ quyền trọng tài không liên quan đến §1671.
Civil Code §1671(b)Civil Code §8200 làm cho thông báo sơ bộ trở thành điều kiện của quyền cầm giữ: có gửi thì người khiếu nại mới được ghi nhận quyền cầm giữ khi không được trả tiền; bỏ qua thì mất quyền, dù công việc có giá trị bao nhiêu. Nó không phải là yêu cầu thanh toán và không phải thông báo ngừng trả tiền - đó là chế tài riêng, dùng để phong tỏa khoản tiền xây dựng chưa giải ngân. Giấy phép xây dựng do cơ quan xây dựng cấp để bảo đảm tuân thủ quy chuẩn, không liên quan. Và thông báo sơ bộ không mua thêm thời gian: thời hạn 90 ngày để ghi nhận quyền cầm giữ sau khi hoàn công chạy theo lịch riêng của nó theo §8412.
Civil Code §8200; §8412Hợp đồng theo thời gian và vật tư trả cho nhà thầu số giờ nhân công thực tế theo mức đã thỏa thuận, cộng chi phí vật tư thực tế, cộng một mức tăng giá hoặc phí đã thỏa thuận cho chi phí chung và lợi nhuận; tổng chi phí không được ấn định trước. Giá ấn định trước khi thi công là hợp đồng khoán gọn, cách làm trái ngược. Chỉ trả vật tư là mô tả một giao dịch cung cấp hàng, không phải hợp đồng xây dựng. Còn mức giá theo giờ mà không hoàn tiền vật tư là thỏa thuận chỉ nhân công hoặc theo đơn giá, khiến nhà thầu gánh toàn bộ chi phí vật tư.
Theo hợp đồng giá khoán cố định (trọn gói), nhà thầu cam kết một kết quả hoàn thành với một mức giá duy nhất, nên mọi khoản vượt chi - năng suất nhân công, vật tư tăng giá, làm lại - đều rơi vào nhà thầu. Hợp đồng chi phí cộng phí cố định thì ngược lại: chủ đầu tư hoàn lại chi phí thực tế và phí đã ấn định, nên chủ đầu tư gánh phần vượt chi. Hợp đồng theo thời gian và vật tư xuất hóa đơn theo giờ và vật tư phát sinh, rủi ro chi phí lại thuộc bên trả hóa đơn. Hợp đồng theo đơn giá chỉ ấn định giá cho mỗi đơn vị thi công; rủi ro khối lượng vẫn thuộc chủ đầu tư, nhà thầu chỉ chịu rủi ro năng suất của chính mình trên mỗi đơn vị.
-Khi nhà thầu phụ vi phạm, biện pháp hợp đồng của nhà thầu chính là chấm dứt hợp đồng phụ đó, để người khác hoàn tất phần việc, và đòi phần chênh lệch từ nhà thầu phụ vi phạm — hoặc từ bảo lãnh thực hiện của họ, nếu có. (a) Kỷ luật của CSLB có thể đình chỉ hoặc thu hồi giấy phép của nhà thầu phụ, nhưng Chánh lục sự không có quyền ra lệnh hoàn thành công việc hay bù đắp cho nhà thầu chính; đó là việc của tòa án hoặc trọng tài. (d) Lệnh thay đổi đẩy chi phí sang chủ đầu tư, người không gây ra vi phạm và không đồng ý trả hai lần cho cùng một phần việc. (c) Bỏ đi còn tệ hơn vô ích: bỏ dở dự án không có lý do pháp lý chính đáng tự nó là căn cứ kỷ luật theo B&P §7107, nhà thầu chính sẽ đổi một vụ đòi nợ lấy một rắc rối về giấy phép.
Bus. & Prof. Code §7107 (abandonment); §7108.5 (payments to subcontractors)Đối với công trình tư nhân, chủ nhà phải trả cho tổng thầu trong vòng 30 ngày kể từ khi nhận một hóa đơn hợp lệ không có tranh chấp. Đối với công trình công cộng, thời hạn là 30 ngày kể từ hóa đơn hoặc 39 ngày kể từ khi lập hóa đơn, tùy thuộc vào cơ quan.
Civil Code §8800B&P §7108.5 cho tổng thầu 7 ngày kể từ khi nhận khoản thanh toán tiến độ để chuyển phần của mỗi nhà thầu phụ (b), và §7108.5(b) áp mức phạt 2% mỗi tháng cùng phí luật sư trên số tiền giữ lại sai trái. (c) 10 ngày là thời hạn riêng trong Bộ luật Dân sự §8814 để giải phóng khoản TIỀN GIỮ LẠI cho nhà thầu phụ sau khi chủ đầu tư giải phóng nó — một khoản thanh toán khác theo một điều luật khác, đó là lý do đề bài nêu rõ khoản thanh toán tiến độ. (a) 3 ngày và (d) 30 ngày không xuất hiện trong cả hai điều luật; 30 ngày là loại thời hạn mà hợp đồng tư nhân có thể muốn áp đặt, nhưng §7108.5 không thể bị thỏa thuận kéo dài đến đó.
Bus. & Prof. Code §7108.5Luật Quyền Sửa Chữa của California (SB 800) thiết lập bảo hành theo luật định cho xây mới nhà ở: 1 năm cho hầu hết các thành phần, 4 năm cho hệ thống cấp thoát nước/điện/cơ khí, 10 năm cho lỗi kết cấu.
Civil Code §896California giới hạn đặt cọc trên hợp đồng cải tạo nhà ở $1,000 hoặc 10% giá hợp đồng, tùy số nào ÍT HƠN. Ở đây 10% sẽ là $4,000, vì vậy giới hạn nhỏ hơn $1,000 sẽ chi phối.
Bus. & Prof. Code §7159.5Đặt cọc không được vượt quá $1,000 hoặc 10% giá hợp đồng, tùy số nào ít hơn. 10% của $6,000 là $600, ít hơn $1,000, vì vậy $600 là mức tối đa hợp pháp.
Bus. & Prof. Code §7159.5Hợp đồng cải tạo nhà phải nêu mô tả công việc, lịch thanh toán, và ngày khởi công/hoàn thành, trong số các mục khác. Thu nhập của chủ nhà là thông tin tài chính cá nhân và không bao giờ là điều khoản hợp đồng bắt buộc.
Bus. & Prof. Code §7159